Back Please read the EFRM System Requirements  before using the view buttons.













   Electric Dockets
View DocketDocket NumberDate FiledDescription
12-0200202/02/2012Petition of Southern California Edison Company for an Advisory Opinion or Declaratory Order regarding the applicability of NRS 704.860(2)(c) to a utility transmission facility located within an incorporated city but subject to a federal right-of-way grant.
12-0102201/24/2012Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 531-E to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Schedule CSPP - Short-Term.
12-0102101/24/2012Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 415 to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule QF - Short Term.
12-0101401/13/2012Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 530-E to revise Interruptible Irrigation Service Schedule No. IS-2 to implement the IS-2 Customer Load Controller Self-Inspection Program and to adopt new notification requirements for IS-2 customers.
12-0100701/06/2012Notice by Sierra Pacific Power Company d/b/a NV Energy of elimination of surcharge collected from Washoe County customers for costs of undergrounding the Tracy to Sugarloaf transmission line.
11-1202712/23/2011Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 414 to revise Electric Line Extensions Rule No. 9 to adjust applicable tax liability factors.
11-1202112/21/2011Application of Sierra Pacific Power Company d/b/a NV Energy for authority to amend certificate CPC 685 Sub 19 to expand its electric service territory to include an area of approximately 176 square miles that is contiguous with its existing service territory in Elko County, Nevada.
11-1201112/12/2011Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 527-E to revise Electric Line Extensions Rule No. 9 to adjust applicable tax liability factors.
11-1101211/17/2011Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 11-04 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective January 1, 2012.
11-1101111/17/2011Nevada Power Company d/b/a NV Energy filed Notice No. 11-04 to adjust the Base Tariff Energy Rates effective January 1, 2012.
11-1100711/04/2011Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 528-E for approval of a Portfolio Charge to be applicable to Newmont Mining Corporation under Rate Schedule GS-4-NG for calendar year 2012 to recover the additional costs required to meet the Nevada Portfolio Standard.
11-1100311/01/2011Report of Nevada Power Company d/b/a NV Energy on the progress of its Action Plan relative to its 2010-2029 Integrated Resource Plan.
11-1001810/14/2011Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 526-E to revise Interruptible Irrigation Service Schedule No. IS-2 to decrease the IS-2 rate and to remove the Peak Period Non-Curtailment Penalty rate pursuant to the Order issued in Docket No. 07-09009.
11-1001710/14/2011Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 413 to revise Interruptible Agricultural Irrigation Water Pumping Schedule No. IAIWP to decrease the IAIWP rate and to remove the Peak Period Non-Curtailment Penalty rate pursuant to the Order issued in Docket No. 07-09009.
11-1000810/06/2011Application of Nevada Power Company d/b/a NV Energy for authority to implement quarterly Deferred Energy Accounting Adjustments.
11-0901909/26/2011Application of Nevada Power Company d/b/a NV Energy for approval of the Distribution Only Service Agreement with the Clark County Water Reclamation District and the Colorado River Commission.
11-0901109/14/2011Application of Villa Sierra Mobile Home Park to withdraw $5,037.65 from the tenant service charge account for reimbursement of expenses incurred to replace all tenant electric meter pedestals and related wiring and to close the account.
11-0900409/01/2011Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its Energy Supply Plan Update for 2012-2013.
11-0900309/01/2011Application of Nevada Power Company d/b/a NV Energy for approval of its Energy Supply Plan Update for 2012.
11-0802008/30/2011Application of Green Acres Mobilehome Park to withdraw $4,252.74 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
11-0801108/19/2011Application of Nevada Power Company d/b/a NV Energy for approval of the second amendment to the Action Plan of the 2010-2029 Integrated Resource Plan as it relates to a new base load forecast and retirement of the Sunrise 1 and Sunrise 2 Generating Units in 2011.
11-0801008/19/2011Application of Sierra Pacific Power Company d/b/a NV Energy for approval of the first amendment to the Action Plan of the 2011-2030 Integrated Resource Plan as it relates to a new base load forecast, a long-term renewable energy contract, and an amendment to a related power purchase agreement.
11-0800908/22/2011Application of Boulder City Trailer Park to withdraw $19,000.00 from the electric service charge account for reimbursement of expenses incurred to repair and maintain the electric distribution system previously approved in Docket 07-06034.
11-0800708/17/2011Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 11-03 to adjust the Base Tariff Energy Rates effective October 1, 2011.
11-0800608/15/2011Nevada Power Company d/b/a NV Energy filed Notice No. 11-03 to adjust the Base Tariff Energy Rates effective October 1, 2011.
11-0702707/22/2011Application of Nevada Power Company d/b/a NV Energy for approval of its 2011 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2010-2029 Integrated Resource Plan.
11-0702607/22/2011Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its 2011 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2011-2030 Integrated Resource Plan.
11-0702307/28/2011Application of Cottonwood Mobile Home Park, Inc. to withdraw $15,586.10 from the electric service charge fund for reimbursement of expenses incurred for power line clearance.
11-0701207/14/2011Application of Sierra Pacific Power Company d/b/a NV Energy for authority to implement quarterly Deferred Energy Accounting Adjustments for its electric division.
11-0700407/05/2011Petition of Unique Infrastructure Group, LLC ("UIG") for an Advisory Opinion or Declaratory Order regarding the applicability of NRS 704B to UIG’s tenants located within the service territory of Sierra Pacific Power Company d/b/a NV Energy ("SPPC") but not customers of SPPC.
11-0601806/21/2011Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 525-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87, to adjust rates for long-term cogeneration and small power production energy and capacity rates.
11-0600906/14/2011Notice by Sierra Pacific Power Company d/b/a NV Energy of extension for surcharge collected from Washoe County customers for costs of undergrounding the Tracy to Sugarloaf transmission line pursuant to the Order issued in Docket 07-12001.
11-0600806/06/2011Application of Sierra Pacific Power Company d/b/a NV Energy for a determination of the reasonableness of the Ely Energy Center project development costs and for authority to reclassify those costs from a deferred debit to a regulatory asset with an appropriate carrying charge.
11-0600706/06/2011Application of Nevada Power Company d/b/a NV Energy for approval of new and revised depreciation and amortization rates for its electric operations.
11-0600606/06/2011Application of Nevada Power Company d/b/a NV Energy for authority to increase its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
11-0600506/21/2011Application of Sierra Vista Mobile Home Park to withdraw $3,391.90 from the electric service charge account for reimbursement of expenses incurred to repair the electrical system previously approved in Docket 09-10015.
11-0502605/31/2011Application of Cottonwood Mobile Home Park, Inc. to withdraw $9,853.59 from the electric service charge fund for reimbursement of expenses incurred for federal income taxes for calendar year 2010 and for power line clearance.
11-0501205/13/2011Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 11-02 to adjust the Base Tariff Energy Rates effective July 1, 2011.
11-0501105/13/2011Nevada Power Company d/b/a NV Energy filed Notice No. 11-02 to adjust the Base Tariff Energy Rates effective July 1, 2011.
11-0500905/10/2011Petition of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for an Order permitting deviation from NAC 704.9503(1) to delay filing amendments to Resource Planning Action Plans for the transmission facilities required to access renewable energy zones as part of the Renewable Transmission Initiative.
11-0500805/09/2011Application of Kensington Mobile Home Park Community, LLC to withdraw $1,165.97 from the electric service charge fund for reimbursement of expenses incurred to repair and upgrade the electrical system and to withdraw $3,900.00 from the water service charge fund for reimbursement of expenses incurred to repair and upgrade the water system.
11-0500205/06/2011Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct approximately 537 miles of new overhead 230 kV, 345 kV, and/or 500 kV electric transmission lines and associated facilities to be located in Pershing, Washoe, Storey, Lyon, Esmeralda, Mineral, Nye, and Clark Counties, Nevada.
11-0401404/21/2011Application of Ormat Nevada, Inc. (amended to name ORNI 39, LLC as the applicant), under the provisions of the Utility Environmental Protection Act, for a permit to construct approximately nine miles of 230 kV transmission line and associated facilities to connect the new McGinness Hills geothermal generating facility to Sierra Pacific Power Company d/b/a NV Energy’s Frontier Substation located northeast of Austin in Lander County, Nevada.
11-0401004/08/2011Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 403-E to revise Definitions Rule No. 1, Establishment, Maintenance, and Reestablishment of Credit Rule No. 12, and Customer Deposits Rule No. 13 to define and separate specific rules governing credit and deposits for residential customers and non-residential customers.
11-0400904/08/2011Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 515-E to revise Definitions Rule No. 1, Establishment, Maintenance, and Reestablishment of Credit Rule No. 12, and Customer Deposits Rule No. 13 to define and separate specific rules governing credit and deposits for residential customers and non-residential customers.
11-0400704/05/2011Application of Nevada Power Company d/b/a NV Energy for approval of the Distribution Only Service Agreement with the City of Henderson and the Colorado River Commission.
11-0400504/06/2011Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 411 to close Residential and General Service Private Area Lighting Schedules RS-PAL and GS-PAL to new installations.
11-0303203/29/2011John Miletich vs. Nevada Power Company d/b/a NV Energy. Complaint concerning formulas shown on electric bill.
11-0301403/11/2011Application of Nevada Power Company d/b/a NV Energy for approval of the first amendment to the Action Plan of the 2010-2029 Integrated Resource Plan as it relates to three new renewable energy contracts, four existing renewable energy contract amendments, and three new renewable portfolio-credit-only contracts.
11-0300403/01/2011Application of Sierra Pacific Power Company d/b/a NV Energy to establish a new Deferred Energy Accounting Adjustment Rate, reset the Temporary Renewable Energy Development Charge, reset all components of the Renewable Energy Program Rates, reset the base Energy Efficiency Program Rates and base Energy Efficiency Implementation Rates, and establish Energy Efficiency Program and Energy Efficiency Implementation amortization rates.
11-0300303/01/2011Application of Nevada Power Company d/b/a NV Energy to establish a new Deferred Energy Accounting Adjustment Rate, reset the Temporary Renewable Energy Development Charge, reset all components of the Renewable Energy Program Rates, reset the base Energy Efficiency Program Rates and base Energy Efficiency Implementation Rates, and establish Energy Efficiency Program and Energy Efficiency Implementation amortization rates.
11-0202302/28/2011Application of Kietzke Manor Mobile Home Park to withdraw $1,767.62 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
11-0201302/18/2011Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 409 to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule QF - Short Term.
11-0201202/18/2011Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 522-E to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Schedule CSPP - Short-Term.
11-0200802/15/2011Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 11-01 to adjust the Base Tariff Energy Rates effective April 1, 2011.
11-0200702/15/2011Nevada Power Company d/b/a NV Energy filed Notice No. 11-01 to adjust the Base Tariff Energy Rates effective April 1, 2011.
11-0101801/31/2011Application of Wells Rural Electric Company for authority to amend certificate CPC 412 Sub 10 to expand its service territory to include three sections of land adjacent to its existing service territory in Elko County, Nevada.
11-0101301/11/2011Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 520-E to revise Definitions Rule No. 1 to add a definition for billing multiplier and language clarifying that rounding is used in the calculation of customer bills in compliance with the Order issued in Docket 10-04010.
11-0101201/11/2011Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 407 to revise Definitions Rule No. 1 to add a definition for billing multiplier and language clarifying that rounding is used in the calculation of customer bills.
11-0100902/04/2011Application of Raft River Rural Electric Cooperative, Inc. for authority to amend certificate CPC 680 Sub 3 to reduce its service territory to exclude three sections of land in Elko County, Nevada.
10-1202412/30/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 521-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
10-1202312/30/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 408 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
10-1200712/03/2010Petition of Nevada Power Company d/b/a NV Energy to establish a regulatory asset related to the Harry Allen Combined Cycle addition to record foregone return, depreciation expense, and incremental operating and maintenance expenses.
10-1200612/20/2010Application of Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Bighorn Substation Interconnection Project consisting of a 230 kV dead-end transmission structure, approximately 300 feet of 230 kV transmission line, a 230 kV circuit breaker, and associated facilities to be located within and outside of the existing Bighorn 230 kV Substation in Clark County, Nevada.
10-1102111/18/2010Ray and Traci Marx vs. Nevada Power Company d/b/a NV Energy. Complaint regarding the cost charged to the customer for connection of permanent service as well as the upgrade of the current transformer to the customer's residence.
10-1101911/15/2010Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 10-04 to adjust the Base Tariff Energy Rates effective January 1, 2011.
10-1101811/15/2010Nevada Power Company d/b/a NV Energy filed Notice No. 10-04 to adjust the Base Tariff Energy Rates effective January 1, 2011.
10-1101211/10/2010Application of Cottonwood Mobile Home Park, Inc. to withdraw $4,296.39 from the electric service charge fund for reimbursement of expenses incurred for power line clearance.
10-1101111/08/2010Sierra Pacific Power Company d/b/a NV Energy filed an accident report of an incident resulting in a fatality that occurred on November 7, 2010 when a vehicle struck a power pole in Winnemucca, Nevada.
10-1003510/28/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 405 to revise Interruptible Agricultural Irrigation Water Pumping Schedule No. IAIWP to increase the IAIWP rate and decrease the Non-Curtailment Peak rate.
10-1003110/26/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 517-E to revise Interruptible Irrigation Service Schedule No. IS-2 to increase the IS-2 rate and decrease the Non-Curtailment Peak rate.
10-1002910/26/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 519-E for approval of a Portfolio Charge to be applicable to Newmont Mining Corporation under Rate Schedule GS-4-NG for calendar year 2011 to recover the additional costs required to meet the Nevada Portfolio Standard.
10-1002510/25/2010Application of Sierra Pacific Power Company d/b/a NV Energy to establish interim base energy efficiency program rates and base energy efficiency implementation rates pursuant to NRS 704.785 and the Order issued in Docket No. 09-07016.
10-1002410/25/2010Application of Nevada Power Company d/b/a NV Energy to establish interim base energy efficiency program rates and base energy efficiency implementation rates pursuant to NRS 704.785 and the Order issued in Docket No. 09-07016.
10-1001510/12/2010Petition of Nevada Power Company d/b/a NV Energy ("NPC") for a Declaratory Order that pursuant to the Order issued in Docket No. 06-06007 MGM Mirage ("MGM") is obligated to pay a proportionate share of the cost incurred by NPC to serve portions of MGM’s Project CityCenter through NPC owned facilities at the Sinatra Substation.
10-1001310/20/2010Petition of the International Brotherhood of Electrical Workers Local No. 1245 to open an investigatory docket regarding the workforce staffing and planning of Sierra Pacific Power Company d/b/a NV Energy.
10-0902609/29/2010Application of Sierra Pacific Power Company d/b/a NV Energy for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Anaconda Moly 230 kV Substation Expansion Project consisting of a 230kV transmission line and associated facilities to interconnect the 180 MW Crescent Dunes Solar Energy Project to the existing Anaconda Moly Substation located in Nye County, Nevada.
10-0900309/01/2010Application of Nevada Power Company d/b/a NV Energy for approval of its Energy Supply Plan Update for 2011-2012.
10-0802308/26/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 514-E to revise Large Transmission Service Schedule GS-4 to remove Special Condition 13 listing customers who established a level of utility investment under a previous version of the schedule.
10-0801508/18/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 513-E to revise the Statement of Rates and approve the proposed rates and additions to tariff sheets required to implement the Nevada Dynamic Pricing Trial under the Advanced Service Delivery initiative.
10-0801408/18/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 402 to revise the Statement of Rates and approve the proposed rates and additions to tariff sheets required to implement the Nevada Dynamic Pricing Trial under the Advanced Service Delivery initiative.
10-0800908/13/2010Nevada Power Company d/b/a NV Energy filed Notice No. 10-03 to adjust the Base Tariff Energy Rates effective October 1, 2010.
10-0800808/13/2010Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 10-03 to adjust the Base Tariff Energy Rates effective October 1, 2010.
10-0800608/12/2010Application of Nevada Power Company d/b/a NV Energy for approval of its 2010 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2010-2029 Integrated Resource Plan.
10-0701607/19/2010Nevada Power Company d/b/a NV Energy filed an accident report of an incident not witnessed resulting in a fatality that occurred on July 13, 2010 when a person employed by a third party contractor engaged in conveyor belt systems maintenance possibly caught his arm in a moving coal conveyer in the coal yard at the Reid Gardner Power generating facility in Moapa, Nevada.
10-0701007/12/2010Application of Gentry Manor Mobile Home Park to withdraw $3,000.00 from the service charge fund for reimbursement of expenses incurred to repair and improve the electrical system.
10-0700807/06/2010Nevada Power Company d/b/a NV Energy filed an accident report of an incident resulting in a fatality that occurred on July 4, 2010 when a vehicle struck a steel utility pole at 3649 Losee Road in North Las Vegas, Nevada.
10-0700607/02/2010Application of Nevada Power Company d/b/a NV Energy for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Harry Allen 345/230 kV Autotransformer Substation Upgrade Project which consists of a new 345/230 kV autotransformer, three new 345kV circuit breakers, a new 230 kV circuit breaker, 345 kV bus work, and associated protection and metering equipment to be located within the existing Harry Allen Substation in Clark County, Nevada.
10-0700307/01/2010Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its 2011-2030 Triennial Integrated Resource Plan.
10-0604006/30/2010Application of Nevada Power Company d/b/a NV Energy for authority to issue secured and unsecured long-term debt securities in an aggregate amount not to exceed $1.65 billion through the period ending December 31, 2013.
10-0603706/29/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 512-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87, to adjust rates for long-term cogeneration and small power production energy and capacity rates.
10-0602106/16/2010Joint Petition of Nevada Tri Partners, LLC and Toll Bros., Inc. for an Order extending the terms of Rule 9 Line Extension Agreements with Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy.
10-0601806/16/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 401 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
10-0601706/16/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 511-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
10-0601606/14/2010Application of Cottonwood Mobile Home Park, Inc. to withdraw $2,233.24 from the electric service charge fund for reimbursement of expenses incurred for federal income taxes for calendar year 2009 and plastic pad lock seals for electric meters.
10-0600306/01/2010Application of Sierra Pacific Power Company d/b/a NV Energy for approval of new and revised depreciation and amortization rates for its electric operations.
10-0600106/01/2010Application of Sierra Pacific Power Company d/b/a NV Energy for authority to increase its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
10-0502105/20/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 399 to revise Miscellaneous Charges Schedule No. MC to reduce the third party convenience fee charges for residential customers and separate the fee structure into differing residential and commercial fees.
10-0501905/21/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 509-E to revise Miscellaneous Charges Schedule No. MC to reduce the third party convenience fee charges for residential customers and separate the fee structure into differing residential and commercial fees.
10-0501506/01/2010Joint Petition of Shell Energy North America (US), L.P. ("Shell Energy") and the Barrick Mines for a Declaratory Order or Advisory Opinion regarding the appropriate portfolio standards applicable to Shell Energy or any successor new electric resource provider for the Barrick Mines pursuant to the Order issued in Docket No. 10-03029.
10-0501305/21/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 400 to revise Large General Service-3 Schedule LGS-3 to reflect the Contributed Investment by Clark County Water Reclamation District for three new substations.
10-0501205/14/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 508-E to revise the Statement of Rates and approve the proposed rates and changes to tariff sheets required to implement the Nevada Dynamic Pricing Trial under the Advanced Service Delivery initiative.
10-0501105/14/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 398 to revise the Statement of Rates and approve the proposed rates and changes to tariff sheets required to implement the Nevada Dynamic Pricing Trial under the Advanced Service Delivery initiative.
10-0501005/14/2010Nevada Power Company d/b/a NV Energy filed Notice No. 10-02 to adjust the Base Tariff Energy Rates effective July 1, 2010.
10-0500805/14/2010Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 10-02 to adjust the Base Tariff Energy Rates effective July 1, 2010.
10-0402705/05/2010Application of Southern California Edison Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Eldorado-Ivanpah Transmission Project consisting of a 220 kV transmission line and associated upgrades to the Eldorado Substation to connect the new Ivanpah Substation in California to the existing Eldorado Substation located near Boulder City in Clark County, Nevada.
10-0401404/21/2010Petition of OPOWER, Inc. for an Advisory Opinion or a Declaratory Order permitting behavior-based energy efficiency programs to count as an energy efficiency measure as defined in NRS 704.7802.
10-0401104/16/2010Complaint. Clark County School District vs. Nevada Power Company d/b/a NV Energy concerning the collection of franchise fees.
10-0400304/01/2010Petition of Sierra Pacific Power Company d/b/a NV Energy for approval of a Long-Term Service Agreement with Queenstake Resources USA under its Rate Schedule No. GS-4.
10-0302803/25/2010Petition of Nevada National Guard requesting approval to exceed the Solar Energy Systems Incentive Program’s ("Solar Generations") generating capacity limit for a school facility and to submit an application to participate in the Solar Generations program with four 100 kilowatt solar facilities, and to transfer the Solar Generations application filed for the United States Property and Fiscal Office to the Combined Support Maintenance Shop.
10-0302603/24/2010Petition of Southwest Energy Efficiency Project requesting the Commission apply to Lawrence Berkeley National Laboratory to conduct a study of potential incentives for NV Energy’s energy efficiency and conservation programs.
10-0302403/19/2010Status update by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of the Solar Program pursuant to the regulations adopted in Docket No. 09-07014.
10-0302303/18/2010Application of Sierra Pacific Power Company d/b/a NV Energy for approval of the eighth amendment to the Action Plan of the 2008-2027 Integrated Resource Plan as it relates to the addition of an Advanced Service Delivery project and a Demand Response program to its Demand Side Plan, the postponement of the proposed Ely Energy Center indefinitely, two long-term Related Purchase Power Agreements, participation in the ON Line project, and other matters related thereto.
10-0302203/18/2010Petition of Nevada Power Company d/b/a NV Energy requesting a determination under NRS 704.7821 that the terms and conditions of five renewable power purchase agreements are just and reasonable and allowing a limited deviation from the requirements of NAC 704.8885.
10-0301003/03/2010Second amended application of Amargosa Valley Solar I, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Amargosa Solar Power Project consisting of a 536 MW solar thermal plant, related electric and water transmission facilities, wastewater septic system, and associated facilities to be located approximately 80 miles northwest of Las Vegas in Nye County, Nevada.
10-0300603/01/2010Petition of Nevada Power Company d/b/a NV Energy to offset the Deferred Energy Accounting Adjustment credit balance against the Deferred Base Tariff General Rate debit balance.
10-0300403/01/2010Application of Sierra Pacific Power Company d/b/a NV Energy to refund deferred energy costs, establish a new Deferred Energy Accounting Adjustment Rate, reset the Temporary Renewable Energy Development Charge, and reset the Renewable Energy Program Rate.
10-0300303/01/2010Application of Nevada Power Company d/b/a NV Energy to refund deferred energy costs, establish a new Deferred Energy Accounting Adjustment Rate, reset the Temporary Renewable Energy Development Charge, reset the Renewable Energy Program Rate, recover costs of incentives paid to customers in the air conditioning load management program, and other matters related thereto.
10-0202602/17/2010Petition of Nevada Power Company d/b/a NV Energy requesting to extend the amortization period for the Western Energy Crisis Amortization rate by one month.
10-0201802/12/2010Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 10-01 to adjust the Base Tariff Energy Rates effective April 1, 2010.
10-0201702/12/2010Nevada Power Company d/b/a NV Energy filed Notice No. 10-01 to adjust the Base Tariff Energy Rates effective April 1, 2010.
10-0201202/05/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 506-E to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Schedule CSPP - Short-Term.
10-0201102/05/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 395 to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule QF-Short Term.
10-0201002/05/2010Petition of Sierra Pacific Power Company d/b/a NV Energy ("SPPC") for an Order permitting deviation from NAC 704.8885(1), 704.9113 and 704.9512(1)(a) regarding a short-term energy and portfolio energy credit transaction between SPPC and Idaho Power Company.
10-0200902/04/2010Application of Nevada Power Company d/b/a NV Energy for approval of its 2010-2029 Triennial Integrated Resource Plan.
10-0101401/20/2010Petition of Nevada Power Company d/b/a NV Energy for approval of the Settlement Agreement and the Large Project Service Agreement with Clark County on behalf of its Department of Aviation including provisions that deviate from Rule No. 9 and the Order issued in Docket No. 06-06007.
10-0100901/12/2010Application of Nevada Power Company d/b/a NV Energy for authority to amend certificate CPC 613 Sub 10 to expand its service territory to include a 48 square mile area that is contiguous with its existing service territory in Clark County, Nevada.
09-1202012/29/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 505-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
09-1201912/29/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 394 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
09-1201812/31/2009Application of Fairview Mobile Manor to withdraw $4,248.24 from the service charge account for reimbursement of expenses incurred to repair and upgrade the electrical system.
09-1200212/02/2009Application of Sierra Pacific Power Company d/b/a NV Energy for approval of disposition of Kings Beach Generation Facility and additional requests relating to proposed transaction.
09-1101911/13/2009Nevada Power Company d/b/a NV Energy filed Notice No. 09-04 to adjust the Base Tariff Energy Rates effective January 1, 2010.
09-1101711/13/2009Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 09-04 to adjust the Base Tariff Energy Rates effective January 1, 2010.
09-1101611/13/2009Sierra Pacific Power Company d/b/a NV Energy filed an accident report of an incident resulting in a fatality that occurred on October 31, 2009 when a pickup truck struck a power pole at Vista Boulevard and Alpland Lane in Sparks, Nevada.
09-1101311/09/2009Application of Kietzke Manor Mobile Home Park to withdraw $1,783.94 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
09-1101111/09/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter 392 for approval of General Service Hybrid Electric Vehicle Recharge Rider - Time-of-Use Schedule GSHEVRR - TOU in compliance with the Order issued in Docket No. 08-12002.
09-1100511/04/2009Application of TransWest Express, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the TransWest Express Transmission Project consisting of a 600 kV DC transmission line running from central Wyoming to southern Nevada and associated facilities, with the transmission line entering the state north of Mesquite and terminating southwest of Boulder City, Nevada.
09-1100311/02/2009Petition of Nevada Power Company d/b/a NV Energy ("NPC") for an Advisory Opinion or an Order permitting deviation from NAC 704.8885(1), 704.9113 and 704.9512(1)(a) regarding a specific short-term energy and Portfolio Energy Credit transaction between NPC and PacifiCorp.
09-1100211/02/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 393 to revise Interruptible Agricultural Irrigation Water Pumping Schedule No. IAIWP to increase the IAIWP rate and decrease the Peak Penalty rate.
09-1002310/20/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 391 to revise Electric Line Extensions Rule No. 9 to remove the Economic Stimulus calculation reflecting an increase to the tax factor for distribution depreciable property and transmission depreciable property.
09-1002210/20/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 504-E to revise Electric Line Extensions Rule No. 9 to remove the Economic Stimulus calculation reflecting an increase to the tax factor for distribution depreciable property and transmission depreciable property.
09-1001510/14/2009Application of Sierra Vista Mobile Home Park to withdraw $15,000.00 from the service charge fund for reimbursement of expenses incurred to remove trees encroaching utility services and for repairs to the electrical system.
09-1000710/05/2009Application of Southern California Edison Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Eldorado-Ivanpah Transmission Project to connect the new Ivanpah Substation to its existing Eldorado Substation located in Boulder City, Nevada.
09-1000610/05/2009Application of Cottonwood Mobile Home Park, Inc. to withdraw $2,035.00 from the electric service charge fund for reimbursement of expenses incurred for federal income taxes for calendar years 2002 through 2007.
09-0902009/17/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 503-E to revise Interruptible Irrigation Service Schedule No. IS-2 to increase the IS-2 rate and decrease the Peak Penalty rate.
09-0900109/01/2009Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its Energy Supply Plan Update for 2010.
09-0803108/27/2009Application of Nevada Power Company d/b/a NV Energy for approval of the Distribution-Only Service Agreement with the City of Las Vegas and the Colorado River Commission.
09-0802008/14/2009Application of Nevada Power Company d/b/a NV Energy for approval of the twelfth amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to three new renewable power purchase agreements, a related PV integration and intermittency study, a settlement agreement and related amendments to existing purchased power agreements with Ormat Nevada and various Ormat subsidiaries, and the 2010 Interim Demand Side Plan.
09-0801808/14/2009Application of Sierra Pacific Power Company d/b/a NV Energy for approval of the seventh amendment to the Action Plan of the 2008 - 2027 Integrated Resource Plan as it relates to a settlement agreement and related amendments to existing purchased power agreements with Ormat Nevada and various Ormat subsidiaries.
09-0801708/14/2009Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its 2009 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2008-2027 Integrated Resource Plan.
09-0801508/12/2009Nevada Power Company d/b/a NV Energy filed Notice No. 09-03 to adjust the Base Tariff Energy Rates effective October 1, 2009.
09-0801308/12/2009Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 09-03 to adjust the Base Tariff Energy Rates effective October 1, 2009.
09-0702407/31/2009Application of Sierra Pacific Power Company d/b/a NV Energy for authority to issue $255 million of new long-term debt securities, new refinancing authority of $348.25 million, authority to restate $845 million of existing authority, and to rescind $300 million in contingent authority related to the Ely Energy Center.
09-0701007/10/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 502-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87, to adjust rates for long-term cogeneration and small power production energy and capacity rates.
09-0700707/01/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 501-E for approval of a Portfolio Charge to be applicable to Newmont Mining Corporation taking service under Rate Schedule GS-4-NG to recover the additional cost required to meet the Nevada Portfolio Standard.
09-0700507/01/2009Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy requesting the Commission accept their portfolio optimization strategy for 2010-2012, and make a predetermination that their strategy is prudent.
09-0700312/18/2009Application of Nevada Power Company d/b/a NV Energy for approval of the Energy Supply Plan component of its triennial Integrated Resource Plan for the period 2010-2029.
09-0603606/30/2009Application of Boulder City Trailer Park to withdraw $15,000.00 from the service charge account for reimbursement of expenses incurred to repair and maintain the electric distribution system.
09-0602506/23/2009Application of Gentry Manor Mobile Home Park to withdraw $2,500.00 from the service charge fund for reimbursement of expenses incurred to repair and improve the electrical system.
09-0602206/19/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 390 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
09-0602106/19/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 500-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
09-0601506/15/2009Application of Sierra Pacific Power Company d/b/a NV Energy and Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct the One Nevada Transmission Line Project consisting of an expansion of the existing Falcon Substation, the new Robinson Summit Substation, approximately 235 miles of new 500 kV transmission line from the new Robinson Summit Substation to the existing Harry Allen Substation, and associated facilities to be located in White Pine, Lincoln, Nye, Clark, and Eureka Counties, Nevada.
09-0601206/11/2009Report of Nevada Power Company d/b/a NV Energy ("NPC") regarding the physical gas supply for NPC's generating fleet in compliance with the Order issued in Docket No. 08-08030.
09-0600806/08/2009Application of Cottonwood Mobile Home Park, Inc. to withdraw $834.65 from the service charge fund for reimbursement of expenses incurred to repair and maintain the electrical system.
09-0503405/21/2009Application of Green Acres Mobilehome Park to withdraw $4,725.07 from the meter service fee account for reimbursement of expenses incurred to repair and maintain the electrical system.
09-0502905/21/2009Application of PacifiCorp d/b/a Rocky Mountain Power for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Energy Gateway South Transmission Project consisting of approximately 77 miles of 500 kV transmission line and ancillary facilities to be located in Clark and Lincoln Counties, Nevada.
09-0502505/15/2009Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 09-02 to adjust the Base Tariff Energy Rates effective July 1, 2009.
09-0502305/15/2009Nevada Power Company d/b/a NV Energy filed Notice No. 09-02 to adjust the Base Tariff Energy Rates effective July 1, 2009.
09-0500605/04/2009Application of Cottonwood Mobile Home Park, Inc. to withdraw $834.65 from the service charge fund for reimbursement of expenses incurred to repair and improve the electrical system.
09-0402305/06/2009Application of Cozy Trailer Park to withdraw $1,472.35 from the service charge fund for reimbursement of expenses incurred to repair and improve the electrical system and to close the account.
09-0402104/29/2009Regulatory Operations Staff of the Public Utilities Commission filed an accident report from Nevada Power Company d/b/a NV Energy of an incident resulting in a fatality that occurred on April 19, 2009 involving a pickup truck traveling half on the sidewalk and half on the street that struck a steel transmission pole at 4200 Block of East Russell Road in Las Vegas, Nevada.
09-0400704/21/2009Application of Sierra Pacific Power Company d/b/a NV Energy for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Ft. Sage Transmission Line Project consisting of approximately 49.6 miles of 345 kV transmission line between the Ft. Sage Substation and the East Tracy Substation and associated facilities to be located in Washoe and Storey Counties, Nevada.
09-0303204/07/2009Application of Meadows Trailer Park to withdraw $10,011.20 from the service charge fund for reimbursement of expenses incurred to repair and improve the electrical system.
09-0303003/27/2009Report of Sierra Pacific Power Company d/b/a NV Energy on the progress of its Action Plan relative to its 2008-2027 Integrated Resource Plan.
09-0302503/26/2009Petition of the Regulatory Operations Staff for an Order requiring Westcom, Inc. to Appear and Show Cause why it should not be assessed a civil penalty for violation of the provisions of Chapter 455 of the Nevada Revised Statutes.
09-0302003/25/2009Petition of the Regulatory Operations Staff for an Order requiring Western States Contracting, Inc. to Appear and Show Cause why it should not be assessed a civil penalty for violation of the provisions of Chapter 455 of the Nevada Revised Statutes.
09-0301103/10/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 382 to revise Net Metering Rider Schedule No. NMR and Generating Facility Interconnection Rule No. 15 in compliance with the Order issued in Docket No. 07-06024.
09-0301003/10/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 492-E to revise Net Metering Rider Schedule No. NMR and Generating Facility Interconnection Rule No. 15 in compliance with the Order issued in Docket No. 07-06024.
09-0300803/10/2009Joint Petition of Nevada Power Company d/b/a NV Energy ("NPC") and Sierra Pacific Power Company d/b/a NV Energy ("SPPC") for a Declaratory Order granting waivers of Commission-ordered requirements to provide certain engineering, construction, and cost estimates, certain cost analyses, and impact updates related to the proposed Ely Energy Center as part of NPC's 2009 Integrated Resource Plan ("IRP") and amendment to be filed by SPPC to its IRP.
09-0300603/09/2009Application of Sierra Pacific Power Company d/b/a NV Energy for approval of the sixth amendment to the Action Plan of the 2008-2027 Integrated Resource Plan for authority to construct the One Nevada Transmission Line; approval of its updated fuel and purchased power forecasts and load forecast; and other matters related thereto.
09-0300503/09/2009Application of Nevada Power Company d/b/a NV Energy for approval of the eleventh amendment to the Action Plan of the 2007-2026 Integrated Resource Plan for authority to construct the One Nevada Transmission Line; enter into a long-term power purchase agreement; approval of its updated fuel and purchased power forecasts and load forecast; and other matters related thereto.
09-0203003/02/2009Application of Sierra Pacific Power Company d/b/a NV Energy to establish a new Deferred Energy Accounting Adjustment Rate, to reset the Temporary Renewable Energy Development Charge, and to reset all of the components of the Renewable Energy Program Rates.
09-0202902/27/2009Application of Nevada Power Company d/b/a NV Energy to establish a new Deferred Energy Accounting Adjustment Rate, to reset the Temporary Renewable Energy Development Charge, to reset all of the components of the Renewable Energy Program Rates, and to recover costs of incentives paid to customers participating in the air conditioning load management program.
09-0202202/24/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 389 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
09-0202102/24/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 499-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
09-0201902/20/2009Application of Gentry Place Mobile Home Park to withdraw $2,514.27 from the service charge fund for reimbursement of expenses incurred to repair the electrical system.
09-0201602/13/2009Nevada Power Company d/b/a NV Energy filed Notice No. 09-01 to adjust the Base Tariff Energy Rates effective April 1, 2009.
09-0201502/13/2009Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 09-01 to adjust the Base Tariff Energy Rates effective April 1, 2009.
09-0200802/04/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 496-E to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule CSPP-Short Term Rates.
09-0200702/04/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 386 to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule QF-Short Term.
09-0200502/03/2009Application of Sierra Pacific Power Company d/b/a NV Energy for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Fallon 230 kV Source Project consisting of a 230 kV transmission line approximately 19.4 miles long and the new Greenwave Substation, Carson Lake Switching Station and Pony Express Switching Station to be located in Churchill County, Nevada.
09-0200302/02/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 497-E to revise Electric Tariff No. 1 to temporarily suspend the collection of the Renewable Energy Program Rate effective April 1, 2009 until the Commission resets the rate in its 2009 Annual Deferred Energy Accounting Adjustment proceeding.
09-0200202/02/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 387 to revise Tariff No. 1-B to temporarily suspend the collection of the Renewable Energy Program Rate effective April 1, 2009 until the Commission resets the rate in its 2009 Annual Deferred Energy Accounting Adjustment proceeding.
09-0101601/20/2009Application of Sierra Pacific Power Company d/b/a NV Energy for approval of the fifth amendment to the Action Plan of the 2008 - 2027 Integrated Resource Plan as it relates to an amendment to the WSPP Confirmation with Newmont Nevada Energy Investment LLC and an amendment to the existing renewable power purchase agreements and associated portfolio credits with Homestretch Geothermal.
09-0101501/21/2009Application of Nevada Power Company d/b/a NV Energy for approval of the tenth amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to amendments to renewable power purchase agreements with NGP Blue Mountain I LLC, Enel Salt Wells, LLC, and Enel Stillwater, LLC, and an amendment to the solar renewable energy credit purchase agreement with SunPower Corporation.
09-0100601/08/2009Application of Nevada Power Company d/b/a NV Energy for authority under the provisions of the Utility Environmental Protection Act for a permit to construct approximately 0.5 miles of 500kV transmission line interconnecting the Harry Allen Generating Station with the Harry Allen Substation and associated interconnection facilities to be located in Clark County, Nevada.
08-1202812/30/2008Report of Sierra Pacific Power Company d/b/a NV Energy on the North Valmy Generating Station Northern Coal Plant Expansion filed in compliance with the Order issued in Docket Nos. 08-05014 and 08-05015.
08-1202512/31/2008Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 495-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
08-1202412/31/2008Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 385 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
08-1202101/07/2009Application of Nevada Power Company d/b/a NV Energy for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Laughlin Substation Transmission Project which consists of a 500 kV transmission line at and between the Laughlin Substation and the Mohave Generating Station and associated facilities to be located in Clark County, Nevada.
08-1201512/19/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 494-E to close Outdoor Lighting Service Schedule No. OLS to new installations.
08-1201412/18/2008Application of Vulcan Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Yerington to Las Vegas Transmission Line Project consisting of a 500 kV transmission line approximately 347 miles long and ancillary facilities, to be located in Lyon, Mineral, Esmeralda, Nye, and Clark Counties, Nevada.
08-1201012/05/2008Application of Great Basin Transmission, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Southern Nevada Intertie Project consisting of a 500 kV electrical transmission line approximately 60 miles long and related facilities to be located in Clark County, Nevada.
08-1200412/03/2008Application of Nevada Power Company filed under Advice Letter No. 383 to revise its Large General Service-3 Schedule LGS-3 to set the investment amount by which the Facility Charge is calculated for the MGM Block A portion of the Project City Center development.
08-1200212/01/2008Application of Nevada Power Company for authority to increase its annual revenue requirement for general rates charged to all classes of customers to recover costs of acquiring the Bighorn Power Plant, constructing the Clark Peakers, environmental retrofits, and other generating, transmission, and distribution plant additions; to reflect changes in cost of service; and for relief properly related thereto.
08-1102611/26/2008Application of Green Acres Mobilehome Park to withdraw $2,942.03 from the meter service fee account for reimbursement of expenses incurred to repair and maintain the electrical system.
08-1101511/14/2008Sierra Pacific Power Company filed Notice No. 08-04 to adjust the Base Tariff Energy Rates effective January 1, 2009.
08-1101411/14/2008Nevada Power Company filed Notice No. 08-04 to adjust the Base Tariff Energy Rates effective January 1, 2009.
08-1101311/14/2008Application of Nevada Power Company filed under Advice Letter No. 380 to rename Schedule AIWP, Agricultural Irrigation Water Pumping, to Schedule IAIWP, Interruptible Agricultural Irrigation Water Pumping, to establish the 2009 rate for service and modify Schedule IAIWP to the terms and conditions of service of Schedule IS-2 of Sierra Pacific Power Company.
08-1100211/03/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 491-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
08-1100111/03/2008Application of Nevada Power Company filed under Advice Letter No. 379 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
08-1004310/30/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 490-E to revise the Statement of Rates and Interruptible Irrigation Service Schedule No. IS-2 to increase the IS-2 rate and establish the Peak Period Non-Curtailment Penalty rate.
08-1004010/29/2008Application of Nevada Power Company filed under Advice Letter No. 378 to revise Electric Line Extensions Rule No. 9 to clarify the calculation of refunds to Master Planned Communities.
08-1003010/22/2008Bob Abelew vs. Sierra Pacific Power Company. Complaint regarding line extension costs.
08-1002910/20/2008Application of Nevada Power Company for an order authorizing modification of its 2007 financing authority to issue $1.25 billion of new long-term debt securities, to allow new refinancing authority of $192.5 million, to restate $1.578 billion of existing authority, to rescind $1.0 billion in contingent authority related to the Ely Energy Center, and additional authority related thereto.
08-1002710/20/2008Petition of Sierra Pacific Power Company to amend CPC 685 Sub 18 to reflect the addition of fictitious ("d/b/a") name NV Energy for its electrical services.
08-1002610/20/2008Petition of Nevada Power Company to amend CPC 613 Sub 9 to reflect the addition of fictitious ("d/b/a") name NV Energy.
08-1001910/13/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 489-E to revise Electric Tariff No. 1 to reflect the addition of fictitious (d/b/a) name "NV Energy" to the tariffs the company will be using to bill its customers.
08-1001810/13/2008Application of Nevada Power Company filed under Advice Letter No. 377 to revise Electric Tariff No. 1 to reflect the addition of fictitious (d/b/a) name "NV Energy" to the tariffs the company will be using to bill its customers.
08-1001610/10/2008Application of Cottonwood Mobile Home Park, Inc. to withdraw $5,145.40 from the service charge fund for reimbursement of expenses incurred to repair the electrical system and to remove and or trim trees around the power lines.
08-1001410/13/2008Notice by Sierra Pacific Power Company that it has begun doing business as Sierra Pacific Power Company d/b/a NV Energy and Advice Letter No. 489-E to reflect new d/b/a on tariff sheets pertaining to rates charged to customers.
08-1001310/13/2008Notice by Nevada Power Company that it has begun doing business as Nevada Power Company d/b/a NV Energy and Advice Letter No. 377 to reflect new d/b/a on tariff sheets pertaining to rates charged to customers.
08-0901209/17/2008Application of Nevada Power Company filed under Advice Letter No. 376 to revise Tariff No. 1-B to clarify guarantee language for Schedule Nos. TRS-TOU Trial Residential Service - Time-of-Use, TRM-TOU Trial Residential Service - Multi-Family - Time-of-Use, and TLRS-TOU Trial Large Residential Service - Time-of-Use.
08-0900209/03/2008Application of Cottonwood Mobile Home Park, Inc. to withdraw $4,643.69 from the service charge fund for reimbursement of expenses incurred to repair the electrical system and to trim trees around the power lines.
08-0803108/29/2008Application of Sierra Pacific Power Company for approval of its Energy Supply Plan Update for 2009-2010.
08-0803008/29/2008Application of Nevada Power Company for approval of its Energy Supply Plan Update for 2009.
08-0802508/25/2008Application of Trailerdale Trailer Park to withdraw $4,866.00 from the service charge fund for reimbursement of expenses incurred to repair the electrical system.
08-0801908/18/2008Application of Sierra Pacific Power Company for approval of the fourth amendment to the Action Plan of the 2008 - 2027 Integrated Resource Plan as it relates to the Carson Lake Geothermal Power Project.
08-0801808/18/2008Application of Nevada Power Company for approval of the ninth amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to the Carson Lake Geothermal Power Project.
08-0801508/15/2008Sierra Pacific Power Company filed Notice No. 08-03 to adjust the Base Tariff Energy Rates effective October 1, 2008.
08-0801408/15/2008Nevada Power Company filed Notice No. 08-03 to adjust the Base Tariff Energy Rates effective October 1, 2008.
08-0801208/15/2008Application of Sierra Pacific Power Company for approval of its 2008 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2008-2027 Integrated Resource Plan.
08-0801108/15/2008Application of Nevada Power Company for approval of its 2008 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2007-2026 Integrated Resource Plan.
08-0800708/11/2008Regulatory Operations Staff of the Public Utilities Commission filed an accident report from Nevada Power Company of an incident resulting in a fatality that occurred on August 6, 2008 involving a car traveling at a high rate of speed that struck a steel transmission pole at 9550 W. Cheyenne in Las Vegas, Nevada.
08-0800208/01/2008Report of Nevada Power Company on its Life Span Analysis Process filed in compliance with the Order issued in Docket Nos. 06-11022 and 06-11023.
08-0702107/28/2008Application of Nevada Power Company filed under Advice Letter No. 375 to terminate the collection of the Deferred Energy Accounting Adjustments for Periods 5 and 6 and the Solar Energy Demonstration Program rates pursuant to the Order issued in Docket No. 07-01022.
08-0701707/29/2008Application of Vulcan Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct 263 miles of 500 kV transmission line from the California-Nevada border north to a point where the line would divide into two 500 kV lines and continue north, one to terminate near Fernley and the other near Salt Wells, and 15 miles of 230 kV transmission line from Salt Wells to the Dixie Valley corridor crossing lands in Churchill, Lyon, Mineral, and Washoe Counties, Nevada.
08-0701207/14/2008Application of Nevada Power Company filed under Advice Letter No. 374 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
08-0701007/14/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 485-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
08-0700507/09/2008Application of Sierra Pacific Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Blackhawk Substation and Transmission Line Project which consists of a new 345 kV substation, 17 miles of new 345 kV transmission lines, and associated substation facilities at the existing East Tracy Substation located in Storey County, Nevada.
08-0700107/01/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 487-E to revise Electric Tariff No. 1 to terminate the collection of the deferred energy account adjustment rate in compliance with the Order issued in Docket 06-12001.
08-0603206/30/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 486-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87, to adjust rates for long-term cogeneration and small power production energy and capacity rates.
08-0600606/03/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 484-E to modify the Statement of Rates related to Schedule IS-2 - Interruptible Irrigation Rate to provide continuity between the tariff sheet accepted in Docket No. 08-02022, effective April 1, 2008, and the tariff sheet accepted in Docket No. 08-02027, effective March 1, 2008.
08-0501605/22/2008Application of Sierra Vista Mobile Home Park to withdraw $2,747.00 from the service charge fund for reimbursement of expenses incurred to repair the electrical system.
08-0501505/21/2008Application of Sierra Pacific Power Company for approval of the third amendment to the Action Plan of the 2008 - 2027 Integrated Resource Plan for authorization to modify the schedule and development budget for the Ely Energy Center.
08-0501405/21/2008Application of Nevada Power Company for approval of the eighth amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan for authorization to modify the schedule and development budget for the Ely Energy Center, acquire the Bighorn Power Plant, construct a combined cycle facility at the existing Harry Allen site, construct two transmission projects, and increase its Gas Supply Portfolio.
08-0500605/15/2008Application of Nevada Power Company to adjust the Base Tariff Energy Rates effective July 1, 2008.
08-0500405/15/2008Application of Sierra Pacific Power Company to adjust the Base Tariff Energy Rates effective July 1, 2008.
08-0404104/30/2008Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct supporting structures for one future 230 kV transmission line approximately 2.29 miles in length and approximately 2,700 feet of underground conduit as part of the Collman Substation Project to be located in Clark County, Nevada.
08-0403804/28/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 483-E to modify the Interruptible Irrigation Rate Schedule No. IS-2 to reflect the new Peak Period Non-Curtailment Penalty.
08-0403304/21/2008Application of Holbrook Station LLC to withdraw $1,770.00 from the service charge fund for reimbursement of expenses incurred to repair the electrical system.
08-0403204/21/2008Joint application of Nevada Power Company and Sierra Pacific Power Company for approval of the sale and purchase of portfolio energy credits between the companies.
08-0403104/21/2008Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a 230/138 kV transformer interconnection and associated facilities at the existing McDonald Substation located in Clark County, Nevada.
08-0400404/02/2008Application of Nevada Power Company for approval of Amendment No. 2 to the Special Contract for the Provision of Distribution-Only Service to the Las Vegas Valley Water District and the Colorado River Commission.
08-0400104/01/2008Report of Nevada Power Company on the progress of its Action Plan relative to its 2007-2026 Integrated Resource Plan.
08-0303503/27/2008Application of Sierra Pacific Power Company for approval of the second amendment to the Action Plan of the 2008 - 2027 Integrated Resource Plan as it relates to a renewable energy agreement, continued funding of CO2 research, and a revised load forecast.
08-0303403/26/2008Application of Nevada Power Company for approval of the seventh amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to the construction of two new renewable energy projects, revisions to its Transmission Plan, and other matters related thereto.
08-0303003/21/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 482-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
08-0302803/21/2008Application of Nevada Power Company filed under Advice Letter No. 373 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
08-0302503/18/2008Application of Barrick Gold U.S. Inc., operator of Cortez Joint Venture d/b/a Cortez Gold Mines, to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
08-0301503/10/2008Application of Nevada Power Company filed under Advice Letter No. 372 to revise Definitions Rule No. 1 to add the definition of abnormal risk.
08-0301303/10/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 481-E to revise its electric tariff Definitions Rule No. 1 to modify the definition of abnormal risk.
08-0300803/07/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 478-E for approval of a Portfolio Charge to recover the additional cost required to meet the Nevada Portfolio Standard under Rate Schedule GS-4-NG.
08-0300203/05/2008Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to expand and upgrade the existing Harry Allen Generation Facility by installing combined cycle power generation units and accessory structures to be known as the Harry Allen Combined Cycle Plant to be located at the Apex Industrial Park in Clark County, Nevada.
08-0204303/06/2008Application of Sierra Pacific Power Company to establish a new Deferred Energy Accounting Adjustment Rate, recover settlement costs related to the Western Energy Crisis, implement a new Temporary Renewable Energy Development Charge, and establish a rate to recover the costs of the Solar Program, Wind Demonstration Program, and Waterpower Demonstration Program.
08-0204203/06/2008Application of Nevada Power Company to establish a new Deferred Energy Accounting Adjustment Rate, implement a new Temporary Renewable Energy Development Charge, and establish a rate to recover the costs of the Solar Program, Wind Demonstration Program, and Waterpower Demonstration Program.
08-0202702/20/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 479-E to modify the Statement of Rates related to Schedule IS-2 - Interruptible Irrigation Rate.
08-0202302/15/2008Application of Nevada Power Company to adjust the Base Tariff Energy Rates effective April 1, 2008.
08-0202202/15/2008Application of Sierra Pacific Power Company to adjust the Base Tariff Energy Rates effective April 1, 2008.
08-0201302/08/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 476-E to reflect an increase in the point-to-point transmission rates for Bonneville Power Administration pursuant to Schedule No. CSPP Short-Term Rates, Cogeneration and Small Power Production.
08-0201202/08/2008Advice Letter No. 370 of Nevada Power Company to file avoided short term cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule QF-Short Term.
08-0200302/01/2008Application of Nevada Power Company for approval of the sixth amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan and approval of the Ormat Settlement Agreement.
08-0200202/01/2008Application of Sierra Pacific Power Company for approval of the first amendment to the Action Plan of the 2008 - 2027 Integrated Resource Plan and approval of the Ormat Settlement Agreement.
08-0102101/29/2008Request by Sierra Pacific Power Company to revise Schedule IS-2, Interruptible Irrigation Service, of its Electric Tariff No. 1.
08-0101601/25/2008Application of Eureka Moly, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct approximately 24.3 miles of 230 kV transmission line from the Machacek Substation to the Mount Hope Substation to be located in Eureka County, Nevada.
07-1202312/19/2007Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct transmission facilities for the Northwest Substation 230/138 kV Autotransformer Upgrade Project to be located in the northwest Las Vegas Valley, Nevada.
07-1202012/14/2007Application of Nevada Power Company for approval of the fifth amendment to the Action Plan of the 2007-2026 Integrated Resource Plan as it relates to revisions to its Demand Side Management Plan and new agreements with Las Vegas Cogeneration Limited Partnership and Dynegy Power Marketing, Inc.
07-1201612/12/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 474-E to revise Tariff No. 1-B, Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
07-1201512/12/2007Application of Nevada Power Company filed under Advice Letter No. 368 to revise Tariff No. 1-B, Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
07-1200112/03/2007Application of Sierra Pacific Power Company for authority to begin to recover the costs of constructing the new Tracy Combined Cycle Unit and other plant additions and costs of service through an increase of its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
07-1102111/15/2007Application of Sierra Pacific Power Company to adjust the Base Tariff Energy Rates effective January 1, 2008.
07-1102011/15/2007Application of Nevada Power Company to adjust the Base Tariff Energy Rates effective January 1, 2008.
07-0901309/18/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 472-E to revise Electric Tariff No. 1 to introduce Schedule GS-4-New Generation and to modify existing Incremental Pricing Schedule No. IP.
07-0901009/17/2007Application of Silver Springs Mobile Home Park to withdraw $2,379.44 from the service charge account for reimbursement of expenses incurred to repair and upgrade the electrical system.
07-0900509/17/2007Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Arden Substation Expansion Project consisting of the relocation of the Arden-Magnolia, Arden-Bighorn, and Arden-Avera 230 kV transmission lines to be located in the southwest Las Vegas Valley, Nevada.
07-0802008/20/2007Application of Toquop Energy, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a 750 MW pulverized coal-fired electric generation facility and associated facilities including a 31 mile rail line, a well field in the Tule Desert, an underground 13 mile water pipeline and a new transmission substation to be located in Lincoln County, Nevada.
07-0801808/15/2007Application of Sierra Pacific Power Company to adjust the Base Tariff Energy Rates effective October 1, 2007.
07-0801708/15/2007Application of Nevada Power Company to adjust the Base Tariff Energy Rates effective October 1, 2007.
07-0801608/16/2007Application of Nevada Power Company for approval of its annual Demand Side Management Update Report as it relates to the three-year Action Plan of its 2007-2026 Integrated Resource Plan.
07-0800808/08/2007Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct at the Clark Generating Station a new 230 kV switch station onto the new peaking Generator Block No. 1 to interconnect to the existing Faulkner-Winterwood 230 kV transmission line to be located in the central Las Vegas Valley, Nevada.
07-0800708/08/2007Application of Meadows Park LLC to withdraw $16,750.84 from the electric service charge fund for reimbursement of expenses incurred to repair the electrical system.
07-0702307/25/2007Complaint. Energy Control Systems Inc. vs. Sierra Pacific Resources, Sierra Pacific Power Company, and Nevada Power Company for resolution of a dispute concerning Rule 16, Service Connections, Meters and Customer's Facilities.
07-0702207/25/2007Application of Silver Springs Mobile Home Park to withdraw $2,379.44 from the service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
07-0702007/23/2007Petition of Northern Nevada Industrial Electric Users to open an investigatory docket into interstate pipeline reservation cost allocation for determination of Sierra Pacific Power Company's base tariff energy rate.
07-0701707/18/2007Application of Nevada Power Company filed under Advice Letter No. 366 to revise Tariff No. 1-B, Electric Line Extensions Rule No. 9 to include Line Extension Allowance and Master Planned Community refunding for the Large Residential Service.
07-0701607/18/2007Notice of Excess Energy (UK) Limited of self-certification of a qualifying facility under the Public Utilities Regulatory Policy Act (PURPA) in accordance with the Federal Energy Regulatory Commission (FERC) requirements.
07-0701307/16/2007Application of Nevada Power Company for approval of the fourth amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan and its annual Energy Supply Plan Update.
07-0701107/16/2007Application of Fairview Mobile Manor to withdraw $18,815.91 from the service charge account for reimbursement of expenses incurred to repair and upgrade the electrical system.
07-0604906/29/2007Application of Sierra Pacific Power Company for approval of its 2008 to 2027 Integrated Resource Plan.
07-0604406/28/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 470-E to revise Tariff No. 1, Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
07-0604306/28/2007Application of Nevada Power Company filed under Advice Letter No. 365 to revise Tariff No. 1-B, Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
07-0604106/28/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 468-E to revise Electric Tariff No. 1 to change the term "Customer Charge" to "Basic Service Charge" to provide a clearer understanding of the term.
07-0604006/28/2007Application of Nevada Power Company filed under Advice Letter No. 363 to revise Tariff No. 1-B to change the term "Customer Charge" to "Basic Service Charge" to provide a clearer understanding of the term.
07-0603906/27/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 469-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87 to adjust rates for long-term cogeneration and small power production energy and capacity rates.
07-0603506/22/2007Application of Nevada Power Company for authority to amend certificate CPC 613 Sub 8 to expand its service territory to provide service to an area contiguous to its existing service territory and the Silverhawk Generating Station in Clark County, Nevada.
07-0603406/22/2007Application of Boulder City Trailer Park to withdraw $10,000.00 from the service charge account for reimbursement of expenses incurred to upgrade the electric distribution system.
07-0603306/21/2007Application of Sierra Pacific Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a new 345 kV transmission line from the existing East Tracy Substation to a new Emma Substation and to upgrade both substations located in Storey County, Nevada.
07-0601106/08/2007Application of Great Basin Transmission, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Harry Allen to Thirtymile Project, a 500 kV electrical transmission facility and ancillary facilities to be located within Clark County, Lincoln County, Nye County and White Pine County, Nevada.
07-0600206/01/2007Application of Nevada Power Company for Approval of Amendment No. 1 to the Special Contract for the Provision of Distribution-Only Service to the Las Vegas Valley Water District and the Colorado River Commission.
07-0600106/01/2007Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Centennial/Hualapai Substation consisting of a 230/12 kV, 100 MVA distribution substation and approximately one and one-half miles of a double-circuit 230 kV overhead transmission line to be located in northwest Las Vegas Valley, Nevada.
07-0502805/25/2007Petition of Nevada Power Company for approval of Amendment No. 1 to the Special Contract for the Provision of Distribution-Only Service to the Las Vegas Valley Water District and the Colorado River Commission.
07-0502205/18/2007Application of Nevada Power Company filed under Advice Letter No. 361 to replace Schedule ORS-LM, Optional Residential Service - Load Management with Schedule OLM, Optional Load Management which will be applicable to all customers who participate in the Air Conditioning Load Management program and in conjunction with the residential and non-residential rate schedules.
07-0500705/09/2007Application of Nevada Power Company filed under Advice Letter No. 360 to submit its Cogeneration and Small Power Production - Qualifying Facilities Schedule QF-Short Term, with no change in rates, in accordance with NAC 704.8783 which requires electric utilities to file their avoided short-term cost rates for purchases from Qualifying Facilities.
07-0500605/09/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 467-E to revise Schedule No. CSPP Short-Term Rates, Cogeneration and Small Power Production to reflect an increase in the point-to-point transmission rates for PacifiCorp and Bonneville Power Administrative, in accordance with NAC 704.8783 which requires electric utilities to file their avoided short-term cost rates for purchases from Qualifying Facilities.
07-0403004/30/2007Petition of LVE Energy Partners, LLC for a Declaratory Order or in the alternative for an Advisory Opinion that the Central Energy Facilities associated with the Echelon Place are not subject to regulation by the Commission.
07-0402804/25/2007Implementation of the January 25, 2006 District Court Order for review of Sierra Pacific Power Company's Pinon Pine project expenditures.
07-0402204/19/2007Application of Kietzke Manor Mobile Home Park to withdraw $4,067.08 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
07-0401904/12/2007Joint application of Nevada Power Company and Sierra Pacific Power Company for approval of the sale and purchase of portfolio energy credits between the companies and approval to account for additional portfolio energy credits earned from commercial energy efficiency measures.
07-0301003/12/2007Application of Nevada Power Company filed under Advice Letter No. 359 to revise Tariff No. 1-B to adjust the quarterly surcharge reflecting revised franchise tax rates.
07-0300503/07/2007Application of Sierra Pacific Power Company for authority to issue secured and unsecured long-term debt securities in an aggregate amount not to exceed $1.72 billion through the period ending December 31, 2009.
07-0300403/07/2007Application of Nevada Power Company for authority to issue secured and unsecured long-term debt securities in an aggregate amount not to exceed $3.91 billion through the period ending December 31, 2009.
07-0203803/07/2007Application of Valley Electric Association for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Stirling Mountain to Northwest 230 kV Transmission Line Project consisting of approximately 36.7 miles of new overhead 230 kV transmission line to be located in unincorporated areas in Clark and Nye Counties, Nevada.
07-0201502/09/2007Application of Nevada Power Company for approval of the third amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to two renewable power purchase agreements.
07-0200902/08/2007Application of Nevada Power Company filed under Advice Letter No. 358 to revise Tariff No. 1-B to move the Nellis Air Force Base customer from the Large General Service - Extra Large rate schedule to the Large General Service - 3 rate schedule.
07-0200202/02/2007Application of Smokey Ridge Mobile Home Park to withdraw up to $3,773.81 from the service charge account for reimbursement of expenses incurred to repair and maintain the electrical system and to close the account.
07-0200102/02/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 466-E to revise Electric Tariff No. 1 to modify Interruptible Irrigation Service Schedule IS-2 in Compliance with the Order issued in Docket Nos. 05-10003 and 05-10004.
07-0103801/31/2007Application of Valley Electric Association for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Stirling to Northwest 230 kV Transmission Project to be located in southern Nevada.
07-0103601/24/2007Application of Sierra Pacific Power Company for approval of the fourteenth amendment to the Action Plan of the 2005 - 2024 Integrated Resource Plan as it relates to renewable power purchase agreements.
07-0103501/24/2007Application of Nevada Power Company for approval of the second amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to renewable power purchase agreements, a new renewable energy program and environmental upgrades to the Clark Generation Station.
07-0103301/29/2007Application of Reliant Energy Wholesale Generation, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a 26-mile 500 kV transmission line from the Reliant Energy Bighorn Electric Generating Station to the Eldorado Substation and modifications to both substations, located in southern Nevada.
07-0103101/22/2007Application of Villa Sierra Mobile Home Park to withdraw $6,737.32 from the service charge account for reimbursement of expenses incurred to repair and improve the electrical system.
07-0102301/17/2007Application of Nevada Power Company for authority to recover costs incurred to achieve final resolution of claims arising out of the Western Energy Crisis.
07-0102201/16/2007Application of Nevada Power Company to establish a new Deferred Energy Accounting Adjustment rate for Period 6 and to reset the Base Tariff Energy Rate and the Temporary Renewable Energy Development Charge for collection of projected future energy costs.
07-0101901/11/2007Application of Cottonwood Mobile Home Park, Inc. to withdraw $2,867.39 from the service charge account for reimbursement of expenses incurred to repair the electrical system.
07-0100901/08/2007Application of Sierra Pacific Power Company for approval of the fourteenth amendment to the Action Plan of the 2005 - 2024 Integrated Resource Plan as it relates to renewable power purchase agreements.
07-0100801/08/2007Application of Nevada Power Company for approval of the second amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to renewable power purchase agreements, a new renewable energy program and environmental upgrades to the Clark Generation Station.
07-0100601/04/2007Application of Nevada Power Company filed under Advice Letter No. 356 to revise Tariff No. 1-B to adjust the quarterly surcharge reflecting revised franchise tax rates.
07-0100201/03/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 465-E to revise Tariff No. 1, Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
07-0100101/12/2007Application of Nevada Power Company filed under Advice Letter No. 355 pertaining to Tariff No. 1-B, Electric Line Extensions Rule No. 9 to inform the Commission that the new interest rate for customer deposits has not changed the tax liability factor for advances.
06-1202012/15/2006Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Valley Electric Interconnection project consisting of a 230 kV breaker with protective relaying equipment, approximately 1,000 feet of underground cable, 3-phase gas-insulated 230kV bus and approximately 6 miles of 230 kV line to be located in northwest Las Vegas Valley, Clark County, Nevada.
06-1201812/13/2006Petition of the Attorney General's Bureau of Consumer Protection to amend NAC 704.150, including but not limited to the computation of carrying charges on deferred energy balances and a revision for the accumulated deferred income tax offset.
06-1201112/11/2006Application of Silver Star Properties, LLC to withdraw $2,556.41 from the service charge account for the Sierra Vista Mobile Home Park for reimbursement of expenses incurred to repair and maintain the electrical system.
06-1200212/01/2006Application of Sierra Pacific Power Company for authority to recover deferred legal and settlement costs incurred to resolve claims arising from the Western Energy Crisis.
06-1200112/01/2006Application of Sierra Pacific Power Company to establish a new Deferred Energy Accounting Adjustment rate for Period 6, to reset the Base Tariff Energy Rate and to reset the Temporary Renewable Energy Development Charge.
06-1104012/04/2006Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Sinatra Substation which consists of a 230/138 kV substation, 230 kV transmission line structures and a 230 kV Arden Substation expansion to be located in the central Las Vegas Valley along the Las Vegas Strip in Nevada.
06-1103511/29/2006Implementation of the October 25, 2006 District Court Order to determine an appropriate rate schedule allowing Nevada Power Company recovery of the $180 million Merrill Lynch-type contract adjustment.
06-1103311/28/2006Application of Nevada Power Company filed under Advice Letter 354 to revise Tariff No. 1-B to eliminate the Customer Specific Facilities Charge for Nellis Air Force Base because the service location has been taken over by a private contractor.
06-1103111/22/2006Application of Meadows Trailer Park to withdraw $12,464.86 from the service charge account for reimbursement of expenses incurred to repair and improve the electrical system.
06-1102311/17/2006Application of Nevada Power Company for approval of new and revised depreciation and amortization rates.
06-1102211/17/2006Application of Nevada Power Company for authority to increase its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
06-1101511/09/2006Application of Sierra Pacific Power Company for approval of a long-term service agreement with Newmont USA Ltd. d/b/a Newmont Mining Corporation under Electric Tariff No. 1, Large Transmission Service Schedule No. GS-4.
06-1002510/18/2006Application of Nevada Power Company filed under Advice Letter No. 353 to revise Tariff No. 1-B to adjust the quarterly surcharge reflecting revised franchise tax rates.
06-1002110/13/2006Application of Nevada Power Company for approval of the first amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to five renewable power purchase agreements.
06-0902409/20/2006Application of Sierra Pacific Power Company filed under Advice Letter No. 463-E to modify Bills for Service Rule No. 5 and Discontinuance, Termination, Restoration, and Refusal of Service Rule No. 6 in accordance with the Commission rescinding the Order issued November 7, 2005 in Docket No. 05-3005.
06-0902309/20/2006Application of Nevada Power Company filed under Advice Letter No. 351 to modify Bills for Service Rule No. 5 and Discontinuance, Termination, Restoration, and Refusal of Service Rule No. 6 in accordance with the Commission rescinding the Order issued November 7, 2005 in Docket No. 05-3005.
06-0900309/01/2006Application of Gentry Manor Mobile Home Park to withdraw $9,000.00 from the tenant service charge account for reimbursement of expenses incurred to redesign and upgrade the electrical system.
06-0802608/18/2006Petition of Nevada Power Company for a Declaratory Order or in the alternative an Advisory Opinion concerning various aspects of the fuel supply requirements in its contract with Saguaro Power Company.
06-0802008/15/2006Application of Sierra Pacific Power Company for approval of its annual Demand Side Management Report as it relates to the three-year Action Plan of its 2005 - 2024 Integrated Resource Plan.
06-0801008/08/2006Application of Nevada Power Company filed under Advice Letter No. 350 to establish Wireless Communication Service Schedule WCS for wireless technology industries that require electric service to operate radio repeaters or other facilities.
06-0800908/08/2006Application of Sierra Pacific Power Company filed under Advice Letter No. 462-E to establish Wireless Communication Service Schedule WCS for wireless technology industries that require electric service to operate radio repeaters or other facilities.
06-0800308/02/2006Application of Nevada Power Company under the provisions of the Utility Environmental Protection Act for a permit to construct a 500/320/138 kV substation, the associated substation facilities and the modification of the existing kV transmission lines through and out of the Thunderbird Substation site located in the northeast Las Vegas valley area in the state of Nevada.
06-0800208/01/2006Application of Nevada Power Company for authority to establish a new Temporary Renewable Energy Development charge and to reduce the currently effective Base Tariff Energy Rate by an equivalent amount.
06-0800108/01/2006Application of Sierra Pacific Power Company for authority to establish a new Temporary Renewable Energy Development charge and to reduce the currently effective Base Tariff Energy Rate by an equivalent amount.
06-0702707/28/2006Petition of Nevada Power Company for a Declaratory Order or in the alternative an Advisory Opinion concerning various aspects of the fuel supply requirements in its contract with Las Vegas Cogen.
06-0702607/28/2006Application of Placer Turquoise Ridge Inc. as Operator of Turquoise Ridge Joint Venture to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
06-0701007/14/2006Application of Sierra Pacific Power Company for approval of the thirteenth amendment to the Action Plan of the 2005 - 2024 Integrated Resource Plan, for approval of the Energy Supply Plan Update for 2007 and for a determination that the elements of the Energy Supply Plan are prudent.
06-0605106/30/2006Application of Nevada Power Company for approval of its 2007-2026 Integrated Resource Plan.
06-0605006/30/2006Application of Sierra Pacific Power Company filed under Advice Letter No. 460-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87 to adjust rates for long-term cogeneration and small power production energy and capacity rates.
06-0604006/27/2006Pe