Return

Search by
Docket Number



Dockets By Company

All Dockets

Annual Reports

Electric Dockets

Gas Dockets

Incident Report Dockets

Investigations and Rulemakings

Mobile Home Parks

Rail Safety Dockets

Renewable Energy Dockets

Telecommunications Dockets

Water/Wastewater Dockets


Showing: Active Electric Dockets           Click to view: Completed Electric Dockets
 Dkt No.Date FiledDescription
View19-0800108/01/2019Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021.
View19-0701807/25/2019Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Trout Canyon Substation consisting of a new 230 kV substation, appurtenant 230 kV transmission line, and associated facilities to be located approximately 10 miles southwest of Pahrump in Clark County, Nevada.
View19-0701407/17/2019Joint Petition of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy to establish a regulatory asset and to defer costs associated with the expense and capital spending to implement Senate Bill 329 (2019).
View19-0700407/01/2019Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2019 Combined Annual Electric Demand Side Management Update Report as it relates to the Action Plan of their 2019-2038 Joint Integrated Resource Plan.
View19-0605006/28/2019Show Cause Proceeding to determine why Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy should not be administratively fined pursuant to NRS 703.380 and examining other potential remedies to address the funding shortfall for energy storage incentives.
View19-0603906/24/2019Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the third amendment to its 2018 Joint Integrated Resource Plan to update and modify the renewable portion of the Supply-Side Action Plan and the Transmission Action Plan.
View19-0600206/03/2019Application of Sierra Pacific Power Company d/b/a NV Energy for authority to adjust its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View19-0503205/23/2019Monthly reports by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy demonstrating the amount of total incentive funds expended and reserved for all programs funded under NRS 701B.005 pursuant to the Order issued in Docket No. 18-02002.
View19-0502705/20/2019Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their Undergrounding Management Plan.
View19-0501205/03/2019Application of Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct to expand the existing West Tracy Substation located in Storey County, Nevada.
View19-0501105/03/2019Application of Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct a new water equalization pond at the Tracy Generating Station located in Storey County, Nevada.
View19-0501005/03/2019Application of Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct a 230/69 kV auto bank and associated facilities at the Bighorn Substation located in Clark County, Nevada.
View19-0500305/01/2019Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the second amendment to its 2018 Joint Integrated Resource Plan to update and modify the load forecast, the Demand-Side Management Action Plan, the generation portion of the Supply-Side Action Plan, and the Transmission Action Plan.
View19-0500205/01/2019Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval to reallocate costs of the One Nevada Transmission Line pursuant to the Order issued in Docket No. 18-06003.
View19-0402905/02/2019Application of Kensington Land Lease Community, LLC d/b/a Kensington Community to withdraw $105,116.00 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View19-0402204/23/2019Application of Two Blackbirds Hospitality Management LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View19-0400304/01/2019Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the first amendment to its 2019-2038 Triennial Integrated Resource Plan to include a Distributed Resources Plan.
View19-0200202/08/2019Application of Air Liquide Hydrogen Energy U.S. LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View19-0100901/02/2019Reports from electric and gas utilities operating in Nevada of transactions and calculations affecting the deferred energy accounts pursuant to NAC 704.195 for calendar year 2019.
View19-0100401/02/2019Annual Reports for calendar year 2018 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987.
View18-1201912/27/2018Application of Las Vegas Resort Holdings, LLC d/b/a SLS Las Vegas to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-1103911/28/2018Amended Application of Boyd Gaming Corporation to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-1003410/31/2018Amended Application of MSG Las Vegas, LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-1003010/29/2018Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Carpenter Canyon Substation, consisting of a 230 kV substation and associated facilities, to interconnect an existing 230 kV transmission line with the ARES Nevada LLC Regulation Energy Management project to be located east of Pahrump in Nye County, Nevada.
View18-0901609/26/2018Application of Sierra Pacific Power Company d/b/a NV Energy for authority to establish debt issuance authorizations based on a debt ceiling of $1,600.0 million.
View18-0901509/25/2018Application of Georgia-Pacific Gypsum LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-0900309/07/2018Application of LV Stadium Events Company, LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-0600906/06/2018Application of Fulcrum Sierra BioFuels, LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-0600306/01/2018Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2019-2038 Triennial Integrated Resource Plan and 2019-2021 Energy Supply Plan.
View18-0100401/02/2018Annual Reports for calendar year 2017 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987.
View17-1201812/27/2017Notice by Hydrostor A-CAES USA Inc., under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an advanced compressed air energy storage facility to be located approximately 10 miles outside of Ely in White Pine County, Nevada.
View17-0701607/14/2017Notice by Southern California Public Power Authority, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Apex Transmission Line consisting of approximately 10 to 14 miles of 500 kV transmission line and associated facilities to be located in Clark County, Nevada.
View17-0600406/05/2017Application of Nevada Power Company d/b/a NV Energy for approval of new and revised depreciation and amortization rates for its electric and common accounts.
View17-0600306/05/2017Application of Nevada Power Company d/b/a NV Energy for authority to adjust its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View17-0501405/15/2017Application of Peppermill Casinos Inc. d/b/a Peppermill Resort Spa Casino to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View16-0902309/30/2016Application of Switch Ltd. to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View16-0700407/01/2016Application of Nevada Power Company d/b/a NV Energy for authority to restate $1,277.5 million of existing long term debt authority and issue new refinancing authority of $1,323.2 million.
View16-0601706/14/2016Notice by TransCanyon, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct approximately 213 miles of cross-tie 500 kV transmission line connecting the existing Robinson Summit and Mona/Clover substations and associated facilities to be located in White Pine County, Nevada.
View15-0300103/02/2015Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of an Indefinite Joint Dispatch Agreement governing transactions utilizing the One Nevada Transmission Line.
View14-0901509/22/2014Petition of the Regulatory Operations Staff for an Order directing Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy to file requested information with the Commission regarding the advanced metering infrastructure.
View12-1202912/26/2012Amended Application of Toquop Power Holdings, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct a 1,100 MW natural gas-fired power generation plant, natural gas and transmission interconnection lines, and associated facilities to be located near Mesquite in Lincoln and Clark Counties, Nevada.
View12-0802308/22/2012Application of Moapa Solar, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct a 7.5 mile 230 kV overhead transmission line to the Harry Allen Substation and a 1.5 mile 500 kV overhead transmission line to connect a solar facility located on the Moapa River Indian Reservation to the existing Crystal Valley and Harry Allen Substations located in Clark County, Nevada.
View11-0500205/06/2011Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct approximately 138 miles of new overhead 230 kV, 345 kV, and/or 500 kV electric transmission lines and associated facilities to be located in Nye and Clark Counties, Nevada.
View09-1100511/04/2009Application of TransWest Express LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the TransWest Express Transmission Project consisting of a 600 kV DC transmission line running from central Wyoming to southern Nevada and associated facilities.