 Dkt No.Date FiledDescription
View16-0900109/01/2016Application of Nevada Power Company d/b/a NV Energy for acceptance of its Energy Supply Plan Update for 2017-2018.
View16-0805208/30/2016Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 586-E to revise Electric Tariff No. 1 to modify Economic Development Rate Rider Schedule EDRR.
View16-0805108/30/2016Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 467 to revise Tariff No. 1-B to modify Economic Development Rate Rider Schedule EDRR.
View16-0802708/15/2016Application of Nevada Power Company d/b/a NV Energy for approval of the second amendment to its 2016-2035 Integrated Resource Plan and 2016-2018 Action Plan to include the acquisition of the South Point Energy Center.
View16-0802608/15/2016Application of Nevada Power Company d/b/a NV Energy for approval of the second amendment to its 2014 Emissions Reduction and Capacity Replacement Plan as it relates to a new renewable energy purchased power agreement and the retirement of Reid Gardner Unit 4.
View16-0801308/05/2016Donald Kaplan vs. Sierra Pacific Power Company d/b/a NV Energy. Complaint regarding billing dispute on high electric usage.
View16-0702907/27/2016Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 585-E to revise Electric Tariff No. 1 to modify Net Metering Rider-A Schedule NMR-A to establish separate rates for grandfathered private generation customers.
View16-0702807/27/2016Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 466 to revise Tariff No. 1-B to modify Net Metering Rider-A Schedule NMR-A to establish separate rates for grandfathered private generation customers.
View16-0701907/13/2016Petition of Southern California Edison Company for an Advisory Opinion or Declaratory Order that a proposed replacement transmission tower constitutes a "like facility" for the purposes of NRS 704.865(1).
View16-0700707/01/2016Application of Nevada Power Company d/b/a NV Energy for approval of its 2016 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2016-2035 Integrated Resource Plan.
View16-0700407/01/2016Application of Nevada Power Company d/b/a NV Energy for authority to restate $1,277.5 million of existing long term debt authority and issue new refinancing authority of $1,323.2 million.
View16-0700107/01/2016Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its 2017-2036 Triennial Integrated Resource Plan and 2017-2019 Energy Supply Plan.
View16-0601706/14/2016Notice by TransCanyon, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct approximately 213 miles of cross-tie 500 kV transmission line connecting the existing Robinson Summit and Mona/Clover substations and associated facilities to be located in White Pine County, Nevada.
View16-0600806/06/2016Application of Sierra Pacific Power Company d/b/a NV Energy for approval of new and revised depreciation and amortization rates for its electric operations.
View16-0600606/06/2016Application of Sierra Pacific Power Company d/b/a NV Energy for authority to adjust its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View16-0402905/25/2016Application of Cottonwood Mobile Home Park, Inc. to withdraw $6,623.83 from the tenant service charge account for reimbursement of expenses incurred for calendar year 2015 federal income taxes and to repair and maintain the electrical system.
View16-0400404/01/2016Filing by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of annual report on the quality of service metrics in compliance with the Order issued in Docket No. 15-06064.
View16-0100401/04/2016Annual Reports for calendar year 2015 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987.
View15-1100411/03/2015Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 577-E to revise Electric Tariff No. 1 to establish an Optional Flexible Payment Program.
View15-1100311/03/2015Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 459 to revise Tariff No. 1-B to establish an Optional Flexible Payment Program.
View15-0704207/31/2015Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a cost-of-service study and net metering tariffs.
View15-0704107/31/2015Application of Nevada Power Company d/b/a NV Energy for approval of a cost-of-service study and net metering tariffs.
View15-0604106/24/2015Application of Sierra Pacific Power Company d/b/a NV Energy for authority to restate $698.25 million of existing long term debt authority and issue new refinancing authority of $450 million.
View15-0501705/12/2015Application of MGM Resorts International to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View15-0500605/08/2015Application of Wynn Las Vegas, LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View15-0500205/08/2015Application of Las Vegas Sands Corp. to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View15-0300103/02/2015Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of an Indefinite Joint Dispatch Agreement governing transactions utilizing the One Nevada Transmission Line.
View14-1100711/14/2014Application of Switch Ltd. to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View14-1000410/02/2014Notice by Sierra Pacific Power Company d/b/a NV Energy of an application to a federal agency for approval to construct the Hycroft 345 kV Transmission Line Project consisting of the expansion of the existing Oreana Substation, construction of a new substation at the Hycroft mine site, approximately 57 miles of 345 kV transmission line, and associated facilities to be located approximately 55 miles west of Winnemucca in Humboldt and Pershing Counties, Nevada.
View14-0901509/22/2014Petition of the Regulatory Operations Staff for an Order directing Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy to file requested information with the Commission regarding the advanced metering infrastructure.
View14-0402404/16/2014Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of amendments to Energy Supply Plans to reflect participation in the energy imbalance market.
View14-0102401/29/2014Show Cause Proceeding to determine why Valley Electric Association, Inc. ("VEA") should not be assessed an administrative fine for constructing a new 5.3 mile, 138 kV transmission line and associated facilities prior to obtaining Commission approval required by the 1963 agreement entered into between Nevada Power Company and VEA’s predecessor, the Amargosa Valley Cooperative, Inc., as adopted by the Commission in its Order dated August 18, 1964, regarding CPC 524 Sub 1.
View13-0702107/17/2013Joint Application of Nevada Power Company d/b/a NV Energy, Sierra Pacific Power Company d/b/a NV Energy (referenced together as “NV Energy, Inc.”) and MidAmerican Energy Holdings Company (“MidAmerican”) for approval of a merger of NV Energy, Inc. with MidAmerican.
View13-0600406/03/2013Application of Sierra Pacific Power Company d/b/a NV Energy for approval of new and revised depreciation rates for its electric and common accounts.
View13-0600206/03/2013Application of Sierra Pacific Power Company d/b/a NV Energy for authority to adjust its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View12-1202912/26/2012Amended Application of Toquop Power Holdings, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct a 1,100 MW natural gas-fired power generation plant, natural gas and transmission interconnection lines, and associated facilities to be located near Mesquite in Lincoln and Clark Counties, Nevada.
View12-1000510/01/2012Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 538-E to revise Definitions Rule No. 1 and Electric Line Extensions Rule No. 9.
View12-1000410/01/2012Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 423 to revise Definitions Rule No. 1 and Electric Line Extensions Rule No. 9.
View12-0802308/22/2012Application of Moapa Solar, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct a 7.5 mile 230 kV overhead transmission line to the Harry Allen Substation and a 1.5 mile 500 kV overhead transmission line to connect a solar facility located on the Moapa River Indian Reservation to the existing Crystal Valley and Harry Allen Substations located in Clark County, Nevada.
View11-0500205/06/2011Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct approximately 138 miles of new overhead 230 kV, 345 kV, and/or 500 kV electric transmission lines and associated facilities to be located in Nye and Clark Counties, Nevada.
View09-1100511/04/2009Application of TransWest Express LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the TransWest Express Transmission Project consisting of a 600 kV DC transmission line running from central Wyoming to southern Nevada and associated facilities.
View08-1201012/05/2008Amended Application of Great Basin Transmission, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Harry Allen to El Dorado Project consisting of a 500 kV electrical transmission line approximately 60 miles long and related facilities to be located in Clark County, Nevada.