Electric Dockets           Closed Dockets
 Dkt No.Date FiledDescription
View14-1200612/03/2014Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 566-E to revise Electric Line Extensions Rule No. 9 to adjust applicable tax liability factors.
View14-1200512/03/2014Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 445 to revise Electric Line Extensions Rule No. 9 to adjust applicable tax liability factors.
View14-1200412/03/2014Joint Petition of the Regulatory Operations Staff and Shade Tree Village Mobile Home Park ("Shade Tree") requesting the Commission accept a stipulation regarding Shade Tree’s violations of NRS 704.940 and NAC 704.983.
View14-1101211/14/2014Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 14-04 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective January 1, 2015.
View14-1101111/14/2014Nevada Power Company d/b/a NV Energy filed Notice No. 14-04 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective January 1, 2015.
View14-1100711/14/2014Application of Switch Ltd. to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View14-1003010/30/2014Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 562-E to revise Interruptible Irrigation Service Schedule No. IS-2 to increase the IS-2 rate, clarify Special Conditions 2, 3, 6, 7, 8 and 13, and correct typographical errors.
View14-1002910/30/2014Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 442 to revise Interruptible Agricultural Irrigation Water Pumping Schedule No. IAIWP to increase the IAIWP rate, clarify Special Conditions 5, 6, 9 and 10, and correct typographical errors.
View14-1000510/07/2014Application of Cottonwood Mobile Home Park, Inc. to withdraw $2,175.00 from the tenant service charge account for reimbursement of expenses incurred for tree removal around power lines.
View14-1000410/02/2014Notice by Sierra Pacific Power Company d/b/a NV Energy of an application to a federal agency for approval to construct the Hycroft 345 kV Transmission Line Project consisting of the expansion of the existing Oreana Substation, construction of a new substation at the Hycroft mine site, approximately 57 miles of 345 kV transmission line, and associated facilities to be located approximately 55 miles west of Winnemucca in Humboldt and Pershing Counties, Nevada.
View14-0902209/26/2014Show Cause Proceeding to determine whether administrative fines should be imposed upon landlords of mobile home parks identified as having failed to timely submit acceptable annual reports for calendar year 2013.
View14-0901509/22/2014Petition of the Regulatory Operations Staff for an Order directing Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy to file requested information with the Commission regarding the advanced metering infrastructure.
View14-0900609/11/2014Show Cause Proceeding to determine why Shady Acres Mobile Home Park should not be found to have violated NRS 704.940(1)(a) and NAC 704.985(1)(a), be fined for such violation and be required to return overcharges to its residents.
View14-0802308/29/2014Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its Energy Supply Plan Update for 2015-2016.
View14-0801708/20/2014Application of Cottonwood Mobile Home Park, Inc. to withdraw $4,028.70 from the tenant service charge account for reimbursement of expenses incurred for calendar year 2013 federal income taxes and to repair and maintain the electrical system.
View14-0801208/15/2014Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 14-03 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective October 1, 2014.
View14-0801108/15/2014Nevada Power Company d/b/a NV Energy filed Notice No. 14-03 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective October 1, 2014.
View14-0703607/31/2014Application of Carefree Country Mobile Home Park to withdraw $84,117.38 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical and gas systems.
View14-0702607/15/2014Alex Jacobson vs. Nevada Power Company d/b/a NV Energy ("NV Energy"). Complaint regarding damages and claims denied by NV Energy.
View14-0702207/09/2014Petition of the Regulatory Operations Staff for an Order to Show Cause why Shady Acres Mobile Home Park and owners should not be ordered to cease and desist from violating NRS 704.940(1)(a), to return overcharges to tenants for electric charges and electric service, and be fined for violation of NRS 704.940(1)(a) and NAC 704.985(1)(a).
View14-0701907/03/2014Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 430 to submit short-term avoided cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule QF - Short Term and for approval of the use of Powerdex as the hourly price index for qualifying facilities and to eliminate shaping of the daily index price for the Mead/Marketplace markets.
View14-0701807/03/2014Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 548-E to submit short-term avoided cost rates for purchases from Qualifying Facilities pursuant to Schedule CSPP - Short-Term and for approval of the use of Powerdex as the hourly price index for qualifying facilities and to eliminate shaping of the daily index price and the transmission adder for the California-Oregon Border markets.
View14-0701407/02/2014Application of Nevada Power Company d/b/a NV Energy for authority to restate $1.148 billion of existing long term debt authority and issue new refinancing authority of $130 million.
View14-0700807/01/2014Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its 2014 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2014-2033 Integrated Resource Plan.
View14-0700707/01/2014Application of Nevada Power Company d/b/a NV Energy for approval of its 2014 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2013-2032 Integrated Resource Plan.
View14-0604606/27/2014Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 441 to revise Tariff No. 1-B to modify Schedules RS-TOU-E and RS-CPP to allow for early opt out of the Nevada Dynamic Pricing Trial.
View14-0604506/27/2014Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 561-E to revise Electric Tariff No. 1 to modify Schedules D-1-TOU-E and D-1-CPP to allow for early opt out of the Nevada Dynamic Pricing Trial.
View14-0604206/26/2014Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 559-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87, to adjust rates for long-term cogeneration and small power production energy and capacity rates.
View14-0603106/19/2014Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 440 to establish NV GreenEnergy Rider Schedule No. NGR as a voluntary green energy pricing program for LGS-1 and larger commercial customers.
View14-0602706/16/2014Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 560-E to revise Electric Tariff No. 1 to introduce three new optional time-of-use rate schedules available to eligible High Off-Peak Use and GS-2 customers.
View14-0602206/16/2014Application of Nevada Power Company d/b/a NV Energy for approval of the second amendment to the 2013-2032 Integrated Resource Plan and Action Plan as it relates to a new 500 kV/230 kV autotransformer at the existing Harry Allen Substation.
View14-0600606/04/2014Duane K. Wingate vs. Nevada Power Company d/b/a NV Energy. Complaint regarding a dispute over the time frame for the installation of a net meter and the corresponding bills for service.
View14-0600306/04/2014Filing by Las Vegas Cogeneration Limited Partnership of annual report in compliance with the Order issued in Docket No. 91-2013.
View14-0600106/03/2014Anna Robles-Smith vs. Nevada Power Company d/b/a NV Energy. Complaint regarding the calculation of back billing charges.
View14-0504305/29/2014Application of Gentry Manor Mobile Home Park to withdraw $5,000.00 from the tenant service charge account for reimbursement of expenses incurred to repair and improve the electrical system previously approved in Docket 06-09003.
View14-0503505/22/2014Gale Gast vs. Nevada Power Company d/b/a NV Energy. Complaint regarding overcharges for electrical service improvement.
View14-0502405/15/2014Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 14-02 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective July 1, 2014.
View14-0502305/15/2014Nevada Power Company d/b/a NV Energy filed Notice No. 14-02 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective July 1, 2014.
View14-0500505/02/2014Petition of Sierra Pacific Power Company d/b/a NV Energy for cost recovery for the Advanced Service Delivery Project and Nevada Dynamic Pricing Trial pursuant to the Order issued in Docket Nos. 13-06002, 13-06003, and 13-06004.
View14-0500405/02/2014Application of Nevada Power Company d/b/a NV Energy for authority to increase its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View14-0500305/01/2014Application of Nevada Power Company d/b/a NV Energy for approval of the first amendment to the 2013-2032 Integrated Resource Plan and the Energy Supply Plan Update for 2015 to include an initial emissions reduction and capacity replacement plan.
View14-0403004/21/2014Notice by American Capital Energy - Searchlight Solar, LLC of filing Certification of Qualifying Facility Status for Small Power Production Form 556 with the Federal Energy Regulatory Commission.
View14-0402704/17/2014Fred Voltz vs. Sierra Pacific Power Company d/b/a NV Energy. Complaint regarding NV Energy’s Outage Reporting process.
View14-0402604/17/2014Fred Voltz vs. Sierra Pacific Power Company d/b/a NV Energy. Complaint regarding NV Energy’s Chief Executive Officer Position.
View14-0402404/16/2014Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of amendments to Energy Supply Plans to reflect participation in the energy imbalance market.
View14-0401304/08/2014Gabor Vass vs. Nevada Power Company d/b/a NV Energy. Complaint regarding improper billing for actual usage.
View14-0400904/04/2014PH Metro, LLC ("PH Metro") vs. Nevada Power Company d/b/a NV Energy ("NPC"). Complaint regarding a failure by NPC to provide a meaningful account of the cost overruns incurred by NPC in providing electric service to the 1078 bed Clark County Detention Facility developed by PH Metro during 2009.
View14-0302603/28/2014Petition of the Attorney General’s Bureau of Consumer Protection to open an investigatory docket regarding whether separate customer classes of service for net metering customers should be established and to consolidate the investigatory docket with the upcoming Nevada Power Company d/b/a NV Energy’s general rate case.
View14-0302303/28/2014Filing by Sierra Pacific Power Company d/b/a NV Energy of annual report on the quality of service metrics in compliance with the Orders issued in Docket Nos. 04-7009 and 05-10005.
View14-0302203/28/2014Filing by Nevada Power Company d/b/a NV Energy of annual report on the quality of service metrics in compliance with the Order issued in Docket No. 04-7009.
View14-0301703/25/2014Filing by Sierra Pacific Power Company d/b/a NV Energy of annual report in compliance with the Order issued in Docket No. 11-02015.
View14-0301403/21/2014Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 555-E to revise Electric Tariff No. 1 to implement the Economic Development Electric Rate Rider Program set forth in Assembly Bill 239.
View14-0301303/21/2014Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 435 to revise Tariff No. 1-B to implement the Economic Development Electric Rate Rider Program set forth in Assembly Bill 239.
View14-0301003/19/2014Lorrie Cusick vs. Sierra Pacific Power Company d/b/a NV Energy. Complaint regarding the increase to the basic service charge and notice to customers.
View14-0204502/28/2014Notice by Nevada Power Company d/b/a NV Energy of its intent to file an application for adjustment in electric rates.
View14-0204102/28/2014Application of Sierra Pacific Power Company d/b/a NV Energy for approval of fuel and purchased power expenses and to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rate, reset the base Energy Efficiency Program Rates and base Energy Efficiency Implementation Rates, reset the Energy Efficiency Program and Energy Efficiency Implementation Amortization Rates, and refund the total amount of Energy Efficiency Implementation Rate revenue received in 2013, including carrying charges.
View14-0204002/28/2014Application of Nevada Power Company d/b/a NV Energy for approval of fuel and purchased power expenses and to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rate, reset the base Energy Efficiency Program Rates and base Energy Efficiency Implementation Rates, reset the Energy Efficiency Program and Energy Efficiency Implementation Amortization Rates, and refund the total amount of Energy Efficiency Implementation Rate revenue received in 2013, including carrying charges.
View14-0203302/24/2014Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 557-E to revise Miscellaneous Charges Schedule No. MC to revise the third party convenience fee charges and the maximum payment amounts for third party payment services and to include kiosks as an additional payment option for all classes of customers.
View14-0203202/24/2014Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 437 to revise Miscellaneous Charges Schedule No. MC to revise the third party convenience fee charges and the maximum payment amounts for third party payment services and to reduce the fees charged for kiosk payments for all classes of customers.
View14-0203002/13/2014Notice by Solar Star NAFB, LLC of filing Certification of Qualifying Facility Status for Small Power Production Form 556 with the Federal Energy Regulatory Commission.
View14-0202602/14/2014Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 14-01 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective April 1, 2014.
View14-0202502/14/2014Nevada Power Company d/b/a NV Energy filed Notice No. 14-01 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective April 1, 2014.
View14-0202002/12/2014Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 558-E to revise Net Metering Rider Schedule No. NMR pursuant to Ordering Paragraph 3 of the December 3, 2013, Declaratory Order issued in Docket No. 13-05055, and Assembly Bill 428 (2013).
View14-0201902/12/2014Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 438 to revise Net Metering Rider Schedule No. NMR pursuant to Ordering Paragraph 3 of the December 3, 2013, Declaratory Order issued in Docket No. 13-05055, and Assembly Bill 428 (2013).
View14-0201402/18/2014Retroactive application of Meadows Trailer Park LLC. to withdraw $2,486.25 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View14-0201302/18/2014Retroactive application of Pair A Dice Mobile Home Park LLC. to withdraw $21,376.87 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View14-0200702/03/2014Application of Tolas Mobile Home Park to withdraw $5,865.67 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View14-0103201/31/2014Application of ORNI 39 LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct approximately .4 mile of 230 kV overhead transmission line and associated facilities, including a new 48 MW geothermal energy facility, to be located in Lander County, Nevada.
View14-0102401/29/2014Show Cause Proceeding to determine why Valley Electric Association, Inc. (“VEA”) should not be assessed an administrative fine for constructing a new 5.3 mile, 138 kV transmission line and associated facilities prior to obtaining Commission approval required by the 1963 agreement entered into between Nevada Power Company and VEA’s predecessor, the Amargosa Valley Cooperative, Inc., as adopted by the Commission in its Order dated August 18, 1964, regarding CPC 524 Sub 1.
View14-0102101/28/2014Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 556-E to revise Electric Tariff No. 1 to remove Special Condition 4 from Non-Standard Metering Option (“NSMO”) Rider Residential Service Schedule NSMO-1 and to revise Non-Standard Metering Option Rider Residential Service Schedule NSMO-1 and Non-Standard Metering Option Rider Non-Residential Service Schedule NSMO-2 to make the trial non-standard metering option riders permanent service offerings.
View14-0102001/28/2014Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 436 to revise Tariff No. 1-B to remove Special Condition 4 from Non-Standard Metering Option (“NSMO”) Rider Residential Service Schedule NSMO-1 and to revise Non-Standard Metering Option Rider Residential Service Schedule NSMO-1 and Non-Standard Metering Option Rider Non-Residential Service Schedule NSMO-2 to make the trial non-standard metering option riders permanent service offerings.
View14-0101601/27/2014Application of Penoyer Valley Electric Company for authority to transfer electrical distribution system to Lincoln County Power District No. 1 and to cancel certificate CPC 828.
View14-0100401/02/2014Annual Reports for calendar year 2013 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987.
View14-0100201/02/2014Annual Reports for calendar year 2013 submitted by Electric, Natural Gas, LPG, Geothermal, Alternative Sellers, and Railroad companies operating in Nevada pursuant to NRS 703.191 and NAC 704.225.
View13-1204512/30/2013Investigation into whether Valley Electric Association, Inc. (“VEA”) should be assessed an administrative fine for constructing a new 5.3 mile, 138 kV transmission line and associated facilities (the “Innovation Project”) prior to obtaining Commission approval to proceed with the Innovation Project as required by the 1963 agreement entered into between Nevada Power Company and VEA’s predecessor, the Amargosa Valley Cooperative, Inc.
View13-1202312/24/2013Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 550-E for approval of a Portfolio Charge to be applicable to Newmont Mining Corporation under Rate Schedule GS-4-NG for calendar year 2014 to recover the additional costs required to meet the Nevada Portfolio Standard.
View13-1202212/19/2013Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 552-E to revise Electric Line Extensions Rule No. 9 to adjust applicable tax liability factors.
View13-1200512/06/2013Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 433 to revise Electric Line Extensions Rule No. 9 to adjust applicable tax liability factors.
View13-1200312/06/2013Application of Kietzke Manor Mobile Home Park to withdraw $1,752.21 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View13-1102511/19/2013BBC Las Vegas LLC and Robert Eichelberger vs. Nevada Power Company d/b/a NV Energy. Complaint regarding BBC Las Vegas LLC migrating from the General Service rate schedule to the Large General Service-1 rate schedule.
View13-1102211/15/2013Application of Penoyer Valley Electric Company to voluntarily discontinue electrical service conducted under certificate CPC 828.
View13-1101711/18/2013Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 13-04 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective January 1, 2014.
View13-1101611/15/2013Nevada Power Company d/b/a NV Energy filed Notice No. 13-04 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective January 1, 2014.
View13-1101511/15/2013Complaint. Ovation MM, Inc., and its affiliated companies, Stephanie Apts S P E I LLC, Asset L A LLC, Wigwam-Parvin LP, Duck Creek Apts LLC, B-R Ovation LP, Pacific Willows LLC, Jeffreys Apts LLC, S W Ranch Apts LLC, Lone Mountain Apts I LP, Arbors Park Run LLC, Spring Mountain Apts I LP, Thunder Road Development LLC and Russell Apts LLC vs. Nevada Power Company d/b/a NV Energy concerning current billing practices and Petition for declaratory relief.
View13-1100711/08/2013Petition of Nevada Power Company d/b/a NV Energy ("Nevada Power") requesting a Commission Order that provides for the following: (1) A determination, pursuant to Nevada Revised Statutes 704.7821, that the Third Amendment to the Power Purchase Agreement between Nevada Power and ORNI39, LLC, dated November 7, 2013, is just and reasonable; (2) Confirmation regarding the statutory consequence of a finding of justness and reasonableness; and (3) Deviation from the requirement that Nevada Power seek approval of the Third Amendment to the Power Purchase Agreement with ORNI39, LLC through the Integrated Resource Planning process.
View13-1100411/07/2013Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 551-E to revise Electric Line Extensions Rule No. 9.
View13-1100311/07/2013Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 432 to revise Electric Line Extensions Rule No. 9.
View13-1001210/07/2013Complaint. Bonanza Springs Suites, LLC; Boulder Manor Suites, LLC; Super Suites, LLC; Casa Suites, LLC; Checkmate Suites, LLC; Coliseum Suites, LLC; Craig Suites, LLC; Paradise Suites, LLC; Sahara Suites, LLC; St. Louis Suites, LLC; and DC Suites, LLC vs. Nevada Power Company d/b/a NV Energy concerning customer class identification, customer class billing, and refunds for billing errors.
View13-1000410/02/2013Application of Cottonwood Mobile Home Park, Inc. to withdraw $2,619.48 from the electric service charge account for reimbursement of expenses incurred for power line clearance.
View13-1000210/01/2013Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 549-E to revise Interruptible Irrigation Service Schedule No. IS-2 to increase the IS-2 rate.
View13-1000110/01/2013Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 431 to revise Interruptible Agricultural Irrigation Water Pumping Schedule No. IAIWP to increase the IAIWP rate.
View13-0902409/27/2013Application of Green Acres Mobilehome Park to withdraw $3,405.31 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system and to close the account.
View13-0902309/25/2013Complaint. Bonanza LV Holdings, LLC; Boulder LV Holdings, LLC; Yo Eleven, LLC; Charleston Suites, LLC; Deckow LV Holdings, LLC; Craig LV Holdings, LLC; Casa LV Holdings, LLC; Paradise LV Holdings, LLC; Sahara LV Holdings, LLC; St. Louis LV Holdings, LLC; Swenson LV Holdings, LLC; Twain DE, LLC; Hop Over, LLC; and Fremont LV Holdings, LLC vs. Nevada Power Company d/b/a NV Energy concerning customer class identification, customer class billing, and deposit issues.
View13-0802408/30/2013Application of Nevada Power Company d/b/a NV Energy for approval of its Energy Supply Plan Update for 2014-2015.
View13-0801808/22/2013Reports from electric and gas utilities operating in Nevada of transactions and calculations affecting the deferred energy accounts pursuant to NAC 704.195.
View13-0801308/15/2013Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 13-03 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective October 1, 2013.
View13-0801208/15/2013Nevada Power Company d/b/a NV Energy filed Notice No. 13-03 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective October 1, 2013.
View13-0800808/12/2013Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 547-E to revise Electric Tariff No. 1 to allow non-residential customers the ability to choose a non-standard meter under Trial Non-Standard Metering Option (“NMSO”) Rider Non-Residential Service Schedule NSMO-2.
View13-0800708/12/2013Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 429 to revise Tariff No. 1-B to allow non-residential customers the ability to choose a non-standard meter under Trial Non-Standard Metering Option (“NMSO”) Rider Non-Residential Service Schedule NSMO-2.
View13-0703707/31/2013Joint Petition of Howard Hughes Properties, Inc. and Howard Hughes Company, LLC requesting deviation from Nevada Power Company d/b/a NV Energy’s Rule No. 9, Section C.7 to allow for a fifteen year contract term for the Summerlin Village 13 Area 1 and the Summerlin Village 23B Master Planned Community Umbrella Agreements.
View13-0703107/26/2013Show Cause Proceeding to determine why TKMAD, LLC d/b/a Jopa Mobile Home Park, and/or its predecessor in interest JOPA LLC a/k/a JOPA MHP LLC, should not be found to have violated NRS 704.940(5)(a) and 704.940(10), be fined for such violation, and be ordered to return funds to the electric tenant service charge account.
View13-0702907/25/2013Show Cause Proceeding to determine why landlords of mobile home parks that have not timely submitted acceptable annual reports for calendar year 2012 should not have administrative fines imposed on each one of them.
View13-0702507/18/2013Filing by Las Vegas Cogeneration Limited Partnership of annual report in compliance with the Order issued in Docket No. 91-2013.
View13-0702107/17/2013Joint Application of Nevada Power Company d/b/a NV Energy, Sierra Pacific Power Company d/b/a NV Energy (referenced together as “NV Energy, Inc.”) and MidAmerican Energy Holdings Company (“MidAmerican”) for approval of a merger of NV Energy, Inc. with MidAmerican.
View13-0701507/12/2013Petition of Valley Electric Association, Inc. ("VEA") for an Order approving construction of additional reliability interconnection with the United States Department of Energy’s Mercury Switching Center located at the Nevada National Security Site or a Declaratory Order finding that the additional reliability interconnection does not require Commission approval.
View13-0700607/01/2013Application of Nevada Power Company d/b/a NV Energy for approval of the Distribution Only Service Agreement with the City of North Las Vegas and the Colorado River Commission of Nevada.
View13-0700507/01/2013Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its 2014-2033 Triennial Integrated Resource Plan and 2014-2016 Energy Supply Plan.
View13-0700207/01/2013Application of Nevada Power Company d/b/a NV Energy for approval of its 2013 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2013-2032 Integrated Resource Plan.
View13-0604706/25/2013Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 546-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87, to adjust rates for long-term cogeneration and small power production energy and capacity rates.
View13-0601006/06/2013Associated Anesthesiologists of Reno vs. Sierra Pacific Power Company d/b/a NV Energy. Complaint regarding Associated Anesthesiologists of Reno, a non-residential customer, requesting a non-standard metering option like the smart meter opt-out trial program offered to residential customers.
View13-0600406/03/2013Application of Sierra Pacific Power Company d/b/a NV Energy for approval of new and revised depreciation rates for its electric and common accounts.
View13-0600206/03/2013Application of Sierra Pacific Power Company d/b/a NV Energy for authority to adjust its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View13-0505705/31/2013Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for authority to restate $1.846 billion of existing long term debt authority and issue new refinancing authority of $705 million, or, in the alternative, to restate $1.148 billion of existing long term debt authority and issue new refinancing authority of $255 million.
View13-0505605/31/2013Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval to consolidate the utilities into a single jurisdictional utility, to transfer and modify Certificates of Public Convenience and Necessity to reflect the consolidated utility’s new legal name, NV Energy Operating Company, and to consolidate generation assets.
View13-0505505/30/2013Petition of Nevada Controls, LLC for an Advisory Opinion regarding current practices by NV Energy for the net metering for waterpower as defined in NRS 704.771(b).
View13-0503505/22/2013Petition of the Regulatory Operations Staff for an order to appear and show cause why TKMAD, LLC d/b/a Jopa Mobile Home Park, and/or its predecessor in interest JOPA LLC a/k/a JOPA MHP LLC, should not be found to have violated NRS 704.940(5)(a) and 704.940(10), be fined for such violation, and be ordered to return funds to the electric tenant service charge account.
View13-0503405/22/2013Petition of the Regulatory Operations Staff for an order requiring the landlords of mobile home parks that have not timely submitted acceptable annual reports for calendar year 2012 to appear and show cause why administrative fines should not be imposed on each one of them.
View13-0502605/15/2013Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 13-02 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective July 1, 2013.
View13-0502505/15/2013Nevada Power Company d/b/a NV Energy filed Notice No. 13-02 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective July 1, 2013.
View13-0402104/11/2013Petition of the Regulatory Operations Staff for an Order to Show Cause why Rainbow Trust d/b/a Deluxe Mobile Home Park should not be found to have violated NRS 704.940(5)(a), be fined for such violation, and be ordered to return funds to the electric tenant service charge account.
View13-0402004/11/2013Petition of San Diego Gas & Electric Company ("SDG&E") for a Declaratory Order that SDG&E is not subject to Commission regulation or jurisdiction for providing station power to the Desert Star Energy Center from SDG&E's generating facilities through the California Independent System Operator.
View13-0401804/11/2013Retroactive application of Deluxe Mobile Home Park to withdraw $15,334.90 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View13-0400704/03/2013Notice by Sierra Pacific Power Company d/b/a NV Energy of its intent to file an application for adjustment in electric rates.
View13-0303703/29/2013Filing by Nevada Power Company d/b/a NV Energy of annual report on the quality of service metrics in compliance with the Order issued in Docket No. 04-7009.
View13-0303603/29/2013Filing by Sierra Pacific Power Company d/b/a NV Energy of annual report on the quality of service metrics in compliance with the Orders issued in Docket Nos. 04-7009 and 05-10005.
View13-0301703/15/2013Petition of Fish Springs Ranch, LLC filed in accordance with Second Judicial District Court order seeking relief under the General Service Agreement and Line Extension Agreement entered into with Sierra Pacific Power Company d/b/a NV Energy (“SPPC”) and Rule 9 tariff of SPPC relating to the Fort Sage Substation.
View13-0300403/01/2013Application of Sierra Pacific Power Company d/b/a NV Energy for approval of fuel and purchased power expenses and to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rate, reset the base Energy Efficiency Program Rates and base Energy Efficiency Implementation Rates, and reset the Energy Efficiency Program and Energy Efficiency Implementation Amortization Rates.
View13-0300303/01/2013Application of Nevada Power Company d/b/a NV Energy for approval of fuel and purchased power expenses and to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rate, reset the base Energy Efficiency Program Rates and base Energy Efficiency Implementation Rates, and reset the Energy Efficiency Program and Energy Efficiency Implementation Amortization Rates.
View13-0202902/25/2013Petition of the Attorney General’s Bureau of Consumer Protection to open a rulemaking docket to amend NAC 704.9524 to require that an electric utility that files an application for lost sales compensation pursuant to NRS 704.785 be required to present evidence, as part of the application, regarding its achieved rate of return as of the date of filing the application.
View13-0202302/21/2013Nevada Power Company d/b/a NV Energy quarterly status reports on qualifying facilities as required by the Order issued in Docket No. 89-1072.
View13-0201902/15/2013Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 13-01 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective April 1, 2013.
View13-0201802/15/2013Nevada Power Company d/b/a NV Energy filed Notice No. 13-01 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective April 1, 2013.
View13-0102601/28/2013Petition of the Regulatory Operations Staff for an order to show cause why REMSX, LLC. d/b/a Brookwood Mobile Home Park should not be ordered to cease and desist from violating NRS 704.940(1)(a), to return overcharges to tenants for electric service, and be fined for violation of NRS 704.940(1)(a) and NAC 704.985(1) through (2).
View13-0102401/24/2013Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 543-E to submit short-term avoided cost rates for purchases from Qualifying Facilities pursuant to Schedule CSPP - Short-Term.
View13-0102301/25/2013Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 427 to submit short-term avoided cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule QF - Short Term.
View13-0102101/18/2013Complaint. Nevada Power Company d/b/a NV Energy ("Nevada Power") vs. Valley Electric Association, Inc. for contemplating to operate as a public utility without a Certificate of Public Convenience and Necessity within Nevada Power’s exclusive territory, for interfering with Nevada Power’s system, for entering into an agreement that would duplicate service in Nevada Power’s defined service territory, and for providing service to non-members of its association without revising its operations to conform to Nevada law as a fully regulated public utility.
View13-0102001/18/2013Petition of Nevada Power Company d/b/a NV Energy (“Nevada Power”) for a Declaratory Order that the U.S. Department of Energy is required to comply with NRS 704B as a condition of ceasing to take retail electric service from Nevada Power at the Nevada National Security Site.
View13-0101701/15/2013Application of Silver Springs Mobile Home Park to withdraw $720.20 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View13-0101001/09/2013Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 426 to revise Miscellaneous Charges Schedule No. MC to include kiosks as an additional payment option for all classes of customers.
View13-0100401/02/2013Annual Reports for calendar year 2012 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987.
View13-0100201/02/2013Annual Reports for calendar year 2012 submitted by Electric, Natural Gas, LPG, Geothermal, Alternative Sellers, and Railroad companies operating in Nevada pursuant to NRS 703.191 and NAC 704.225.
View12-1202912/26/2012Amended Application of Toquop Power Holdings, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct a 1,100 MW natural gas-fired power generation plant, natural gas and transmission interconnection lines, and associated facilities to be located near Mesquite in Lincoln and Clark Counties, Nevada.
View12-1200912/19/2012Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 542-E to revise Electric Line Extensions Rule No. 9 to adjust applicable tax liability factors.
View12-1200812/19/2012Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 425 to revise Electric Line Extensions Rule No. 9 to adjust applicable tax liability factors.
View12-1104111/28/2012Application of Green Acres Mobilehome Park to withdraw $3,017.00 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View12-1102811/16/2012Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 421 to replace Optional Load Management Schedule OLM with Optional Load Management and Automation Services Rider Schedule OLM-AS to support and supplement the Residential and Small Commercial Demand Response program.
View12-1102511/15/2012Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 12-04 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective January 1, 2013.
View12-1102411/15/2012Nevada Power Company d/b/a NV Energy filed Notice No. 12-04 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective January 1, 2013.
View12-1102311/15/2012Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 541-E to establish Schedule NV GreenEnergy Rider for a voluntary green energy pricing program.
View12-1100511/05/2012Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 539-E for approval of a Portfolio Charge to be applicable to Newmont Mining Corporation under Rate Schedule GS-4-NG for calendar year 2013 to recover the additional costs required to meet the Nevada Portfolio Standard.
View12-1100411/01/2012Application of Silver Springs Mobile Home Park to withdraw $4,529.08 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View12-1100311/01/2012Application of Dayton Valley Mobile Home Park to withdraw $4,156.41 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View12-1002710/23/2012Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 537-E to revise Interruptible Irrigation Service Schedule No. IS-2 to increase the IS-2 rate.
View12-1002610/23/2012Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 422 to revise Interruptible Agricultural Irrigation Water Pumping Schedule No. IAIWP to increase the IAIWP rate.
View12-1002110/18/2012Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 540-E to revise Electric Tariff No. 1 to modify tariffs related to the Nevada Dynamic Pricing Trial and eliminate Schedules GS-1-TOU-E, GS-1-CPP, DM-1-CPP, and DM-1-TOU-E.
View12-1002010/18/2012Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 424 to revise Tariff No. 1-B to modify tariffs related to the Nevada Dynamic Pricing Trial and eliminate Schedules GS-TOU-E, GS-CPP, RM-CPP, and RM-TOU-E.
View12-1001110/09/2012Petition of Switch Communications Group L.L.C. for a Declaratory Order regarding the scope and application of Nevada Power Company d/b/a NV Energy’s Rule No. 18.
View12-1000510/01/2012Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 538-E to revise Definitions Rule No. 1 and Electric Line Extensions Rule No. 9.
View12-1000410/01/2012Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 423 to revise Definitions Rule No. 1 and Electric Line Extensions Rule No. 9.
View12-0901809/25/2012Lauri Kopish vs. Nevada Power Company d/b/a NV Energy. Complaint regarding billing dispute.
View12-0901609/24/2012Christopher Brewer vs. Nevada Power Company d/b/a NV Energy. Complaint regarding billing dispute.
View12-0802308/22/2012Application of Moapa Solar, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct a 7.5 mile 230 kV overhead transmission line to the Harry Allen Substation and a 1.5 mile 500 kV overhead transmission line to connect a solar facility located on the Moapa River Indian Reservation to the existing Crystal Valley and Harry Allen Substations located in Clark County, Nevada.
View12-0801508/15/2012Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 12-03 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective October 1, 2012.
View12-0801408/15/2012Nevada Power Company d/b/a NV Energy filed Notice No. 12-03 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective October 1, 2012.
View12-0801308/15/2012Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 536-E to revise Net Metering Rider Schedule No. NMR, Definitions Rule No. 1, and Interconnection Agreement for Net Metering pursuant to Assembly Bill 359 and Senate Bill 59.
View12-0801208/15/2012Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 420 to revise Net Metering Rider Schedule No. NMR, Definitions Rule No. 1, and Interconnection Agreement for Net Metering pursuant to Assembly Bill 359 and Senate Bill 59.
View12-0801008/13/2012Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its Energy Supply Plan Update for 2013.
View12-0800908/13/2012Application of Sierra Pacific Power Company d/b/a NV Energy for approval of the second amendment to the Action Plan of the 2011-2030 Integrated Resource Plan as it relates to a new base load forecast, generating plant investments and retirements, and transmission projects.
View12-0700507/19/2012Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 419 to revise Retail Power Exchange Schedule RPE to modify the minimum term of qualified retail power exchanges.
View12-0700207/16/2012Application of Sierra Pacific Power Company d/b/a NV Energy for authority to issue new refinancing authority of $250 million and to restate $698.25 million of existing long term debt authority.
View12-0605306/29/2012Application of Nevada Power Company d/b/a NV Energy for approval of its 2013-2032 Triennial Integrated Resource Plan and 2013-2015 Energy Supply Plan.
View12-0605206/29/2012Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its 2012 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2011-2030 Integrated Resource Plan.
View12-0604206/25/2012Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 535-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87, to adjust rates for long-term cogeneration and small power production energy and capacity rates.
View12-0602406/08/2012Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 534-E to revise Electric Line Extensions Rule No. 9 to adjust applicable tax liability factors.
View12-0602306/08/2012Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 418 to revise Electric Line Extensions Rule No. 9 to adjust applicable tax liability factors.
View12-0600606/08/2012Petition of Thomas Mitchell requesting that the confidential pricing information contained in the contract between Nevada Power Company d/b/a NV Energy and Energenic (FKA CC Landfill Energy LLC) in Docket No. 09-08020 be made a part of the public record.
View12-0503105/23/2012Sonia Miller vs. Nevada Power Company d/b/a NV Energy. Complaint regarding high bills.
View12-0502205/15/2012Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 12-02 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective July 1, 2012.
View12-0502105/15/2012Nevada Power Company d/b/a NV Energy filed Notice No. 12-02 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective July 1, 2012.
View12-0500705/17/2012Application of Kietzke Manor Mobile Home Park to withdraw $1,834.44 from the tenant service charge account for reimbursement of expenses incurred to replace tenant electrical meter and pedestal.
View12-0500305/01/2012Joint Application of Sierra Pacific Power Company d/b/a NV Energy and Nevada Power Company d/b/a NV Energy for authority to establish and implement three separate trial non-standard metering option riders pursuant to the Order issued in Docket No. 11-10007.
View12-0500205/01/2012Petition of the Regulatory Operations Staff to open an investigatory docket regarding the potential conversion of master meter natural gas and electric systems owned and operated by Frontier Mobile Home Park to individual meters and systems owned and operated by Southwest Gas Corporation and Sierra Pacific Power Company d/b/a NV Energy.
View12-0400104/02/2012Application of Kietzke Manor Mobile Home Park to withdraw $1834.44 from the tenant service charge account for reimbursement of expenses incurred to replace tenant electrical meter and pedestal.
View12-0303804/04/2012Report of Sierra Pacific Power Company d/b/a NV Energy on the progress of its Action Plan relative to its 2011-2030 Integrated Resource Plan.
View12-0303403/28/2012Application of Gentry Manor Mobile Home Park to withdraw $4,000.00 from the tenant service charge account for reimbursement of expenses incurred to repair and improve the electrical system previously approved in Docket 06-09003 and to replace tenant electrical meters.
View12-0303303/28/2012Application of Gentry Place Mobile Home Park to withdraw $1,823.88 from the tenant service charge account for reimbursement of expenses incurred to replace all tenant electrical meters.
View12-0303203/26/2012Walter Dowling vs. Nevada Power Company d/b/a NV Energy. Complaint regarding billing concerns on rental properties.
View12-0302503/19/2012Petition of Nevada Power Company d/b/a NV Energy requesting a Declaratory Order for authority to establish a regulatory account to allocate a portion of the value of a transaction involving the sale of communication towers to its customers.
View12-0301603/16/2012Petition of Sierra Pacific Power Company d/b/a NV Energy ("SPPC") requesting a deviation from NAC 704.9503 to allow SPPC to acquire the Gonder and Machacek 230 kV substation yards from Mt. Wheeler Power, Inc. without filing an amendment to its Integrated Resource Plan.
View12-0300503/01/2012Application of Sierra Pacific Power Company d/b/a NV Energy for approval of fuel and purchased power expenses and to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rate, reset the base Energy Efficiency Program Rates and base Energy Efficiency Implementation Rates, and reset the Energy Efficiency Program and Energy Efficiency Implementation Amortization Rates.
View12-0300403/01/2012Application of Nevada Power Company d/b/a NV Energy for approval of fuel and purchased power expenses and to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rate, reset the base Energy Efficiency Program Rates and base Energy Efficiency Implementation Rates, and reset the Energy Efficiency Program and Energy Efficiency Implementation Amortization Rates.
View12-0201002/15/2012Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 12-01 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective April 1, 2012.
View12-0200902/17/2012Nevada Power Company d/b/a NV Energy filed Notice No. 12-01 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective April 1, 2012.
View12-0200202/02/2012Petition of Southern California Edison Company for an Advisory Opinion or Declaratory Order regarding the applicability of NRS 704.860(2)(c) to a utility transmission facility located within an incorporated city but subject to a federal right-of-way grant.
View12-0102201/24/2012Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 531-E to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Schedule CSPP - Short-Term.
View12-0102101/24/2012Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 415 to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule QF - Short Term.
View12-0101401/13/2012Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 530-E to revise Interruptible Irrigation Service Schedule No. IS-2 to implement the IS-2 Customer Load Controller Self-Inspection Program and to adopt new notification requirements for IS-2 customers.
View12-0100701/06/2012Notice by Sierra Pacific Power Company d/b/a NV Energy of elimination of surcharge collected from Washoe County customers for costs of undergrounding the Tracy to Sugarloaf transmission line.
View11-1202712/23/2011Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 414 to revise Electric Line Extensions Rule No. 9 to adjust applicable tax liability factors.
View11-1202112/21/2011Application of Sierra Pacific Power Company d/b/a NV Energy for authority to amend certificate CPC 685 Sub 19 to expand its electric service territory to include an area of approximately 176 square miles that is contiguous with its existing service territory in Elko County, Nevada.
View11-1201112/12/2011Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 527-E to revise Electric Line Extensions Rule No. 9 to adjust applicable tax liability factors.
View11-1101211/17/2011Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 11-04 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective January 1, 2012.
View11-1101111/17/2011Nevada Power Company d/b/a NV Energy filed Notice No. 11-04 to adjust the Base Tariff Energy Rates effective January 1, 2012.
View11-1100711/04/2011Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 528-E for approval of a Portfolio Charge to be applicable to Newmont Mining Corporation under Rate Schedule GS-4-NG for calendar year 2012 to recover the additional costs required to meet the Nevada Portfolio Standard.
View11-1100311/01/2011Report of Nevada Power Company d/b/a NV Energy on the progress of its Action Plan relative to its 2010-2029 Integrated Resource Plan.
View11-1001810/14/2011Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 526-E to revise Interruptible Irrigation Service Schedule No. IS-2 to decrease the IS-2 rate and to remove the Peak Period Non-Curtailment Penalty rate pursuant to the Order issued in Docket No. 07-09009.
View11-1001710/14/2011Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 413 to revise Interruptible Agricultural Irrigation Water Pumping Schedule No. IAIWP to decrease the IAIWP rate and to remove the Peak Period Non-Curtailment Penalty rate pursuant to the Order issued in Docket No. 07-09009.
View11-1000810/06/2011Application of Nevada Power Company d/b/a NV Energy for authority to implement quarterly Deferred Energy Accounting Adjustments.
View11-0901909/26/2011Application of Nevada Power Company d/b/a NV Energy for approval of the Distribution Only Service Agreement with the Clark County Water Reclamation District and the Colorado River Commission.
View11-0901109/14/2011Application of Villa Sierra Mobile Home Park to withdraw $5,037.65 from the tenant service charge account for reimbursement of expenses incurred to replace all tenant electric meter pedestals and related wiring and to close the account.
View11-0900409/01/2011Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its Energy Supply Plan Update for 2012-2013.
View11-0900309/01/2011Application of Nevada Power Company d/b/a NV Energy for approval of its Energy Supply Plan Update for 2012.
View11-0802008/30/2011Application of Green Acres Mobilehome Park to withdraw $4,252.74 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View11-0801108/19/2011Application of Nevada Power Company d/b/a NV Energy for approval of the second amendment to the Action Plan of the 2010-2029 Integrated Resource Plan as it relates to a new base load forecast and retirement of the Sunrise 1 and Sunrise 2 Generating Units in 2011.
View11-0801008/19/2011Application of Sierra Pacific Power Company d/b/a NV Energy for approval of the first amendment to the Action Plan of the 2011-2030 Integrated Resource Plan as it relates to a new base load forecast, a long-term renewable energy contract, and an amendment to a related power purchase agreement.
View11-0800908/22/2011Application of Boulder City Trailer Park to withdraw $19,000.00 from the electric service charge account for reimbursement of expenses incurred to repair and maintain the electric distribution system previously approved in Docket 07-06034.
View11-0800708/17/2011Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 11-03 to adjust the Base Tariff Energy Rates effective October 1, 2011.
View11-0800608/15/2011Nevada Power Company d/b/a NV Energy filed Notice No. 11-03 to adjust the Base Tariff Energy Rates effective October 1, 2011.
View11-0702707/22/2011Application of Nevada Power Company d/b/a NV Energy for approval of its 2011 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2010-2029 Integrated Resource Plan.
View11-0702607/22/2011Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its 2011 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2011-2030 Integrated Resource Plan.
View11-0702307/28/2011Application of Cottonwood Mobile Home Park, Inc. to withdraw $15,586.10 from the electric service charge fund for reimbursement of expenses incurred for power line clearance.
View11-0701207/14/2011Application of Sierra Pacific Power Company d/b/a NV Energy for authority to implement quarterly Deferred Energy Accounting Adjustments for its electric division.
View11-0700407/05/2011Petition of Unique Infrastructure Group, LLC ("UIG") for an Advisory Opinion or Declaratory Order regarding the applicability of NRS 704B to UIG’s tenants located within the service territory of Sierra Pacific Power Company d/b/a NV Energy ("SPPC") but not customers of SPPC.
View11-0601806/21/2011Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 525-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87, to adjust rates for long-term cogeneration and small power production energy and capacity rates.
View11-0600906/14/2011Notice by Sierra Pacific Power Company d/b/a NV Energy of extension for surcharge collected from Washoe County customers for costs of undergrounding the Tracy to Sugarloaf transmission line pursuant to the Order issued in Docket 07-12001.
View11-0600806/06/2011Application of Sierra Pacific Power Company d/b/a NV Energy for a determination of the reasonableness of the Ely Energy Center project development costs and for authority to reclassify those costs from a deferred debit to a regulatory asset with an appropriate carrying charge.
View11-0600706/06/2011Application of Nevada Power Company d/b/a NV Energy for approval of new and revised depreciation and amortization rates for its electric operations.
View11-0600606/06/2011Application of Nevada Power Company d/b/a NV Energy for authority to increase its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View11-0600506/21/2011Application of Sierra Vista Mobile Home Park to withdraw $3,391.90 from the electric service charge account for reimbursement of expenses incurred to repair the electrical system previously approved in Docket 09-10015.
View11-0502605/31/2011Application of Cottonwood Mobile Home Park, Inc. to withdraw $9,853.59 from the electric service charge fund for reimbursement of expenses incurred for federal income taxes for calendar year 2010 and for power line clearance.
View11-0501205/13/2011Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 11-02 to adjust the Base Tariff Energy Rates effective July 1, 2011.
View11-0501105/13/2011Nevada Power Company d/b/a NV Energy filed Notice No. 11-02 to adjust the Base Tariff Energy Rates effective July 1, 2011.
View11-0500905/10/2011Petition of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for an Order permitting deviation from NAC 704.9503(1) to delay filing amendments to Resource Planning Action Plans for the transmission facilities required to access renewable energy zones as part of the Renewable Transmission Initiative.
View11-0500805/09/2011Application of Kensington Mobile Home Park Community, LLC to withdraw $1,165.97 from the electric service charge fund for reimbursement of expenses incurred to repair and upgrade the electrical system and to withdraw $3,900.00 from the water service charge fund for reimbursement of expenses incurred to repair and upgrade the water system.
View11-0500205/06/2011Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct approximately 138 miles of new overhead 230 kV, 345 kV, and/or 500 kV electric transmission lines and associated facilities to be located in Nye and Clark Counties, Nevada.
View11-0401404/21/2011Application of Ormat Nevada, Inc. (amended to name ORNI 39, LLC as the applicant), under the provisions of the Utility Environmental Protection Act, for a permit to construct approximately nine miles of 230 kV transmission line and associated facilities to connect the new McGinness Hills geothermal generating facility to Sierra Pacific Power Company d/b/a NV Energy’s Frontier Substation located northeast of Austin in Lander County, Nevada.
View11-0401004/08/2011Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 403-E to revise Definitions Rule No. 1, Establishment, Maintenance, and Reestablishment of Credit Rule No. 12, and Customer Deposits Rule No. 13 to define and separate specific rules governing credit and deposits for residential customers and non-residential customers.
View11-0400904/08/2011Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 515-E to revise Definitions Rule No. 1, Establishment, Maintenance, and Reestablishment of Credit Rule No. 12, and Customer Deposits Rule No. 13 to define and separate specific rules governing credit and deposits for residential customers and non-residential customers.
View11-0400704/05/2011Application of Nevada Power Company d/b/a NV Energy for approval of the Distribution Only Service Agreement with the City of Henderson and the Colorado River Commission.
View11-0400504/06/2011Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 411 to close Residential and General Service Private Area Lighting Schedules RS-PAL and GS-PAL to new installations.
View11-0303203/29/2011John Miletich vs. Nevada Power Company d/b/a NV Energy. Complaint concerning formulas shown on electric bill.
View11-0301403/11/2011Application of Nevada Power Company d/b/a NV Energy for approval of the first amendment to the Action Plan of the 2010-2029 Integrated Resource Plan as it relates to three new renewable energy contracts, four existing renewable energy contract amendments, and three new renewable portfolio-credit-only contracts.
View11-0300403/01/2011Application of Sierra Pacific Power Company d/b/a NV Energy to establish a new Deferred Energy Accounting Adjustment Rate, reset the Temporary Renewable Energy Development Charge, reset all components of the Renewable Energy Program Rates, reset the base Energy Efficiency Program Rates and base Energy Efficiency Implementation Rates, and establish Energy Efficiency Program and Energy Efficiency Implementation amortization rates.
View11-0300303/01/2011Application of Nevada Power Company d/b/a NV Energy to establish a new Deferred Energy Accounting Adjustment Rate, reset the Temporary Renewable Energy Development Charge, reset all components of the Renewable Energy Program Rates, reset the base Energy Efficiency Program Rates and base Energy Efficiency Implementation Rates, and establish Energy Efficiency Program and Energy Efficiency Implementation amortization rates.
View11-0202302/28/2011Application of Kietzke Manor Mobile Home Park to withdraw $1,767.62 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View11-0201302/18/2011Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 409 to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule QF - Short Term.
View11-0201202/18/2011Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 522-E to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Schedule CSPP - Short-Term.
View11-0200802/15/2011Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 11-01 to adjust the Base Tariff Energy Rates effective April 1, 2011.
View11-0200702/15/2011Nevada Power Company d/b/a NV Energy filed Notice No. 11-01 to adjust the Base Tariff Energy Rates effective April 1, 2011.
View11-0101801/31/2011Application of Wells Rural Electric Company for authority to amend certificate CPC 412 Sub 10 to expand its service territory to include three sections of land adjacent to its existing service territory in Elko County, Nevada.
View11-0101301/11/2011Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 520-E to revise Definitions Rule No. 1 to add a definition for billing multiplier and language clarifying that rounding is used in the calculation of customer bills in compliance with the Order issued in Docket 10-04010.
View11-0101201/11/2011Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 407 to revise Definitions Rule No. 1 to add a definition for billing multiplier and language clarifying that rounding is used in the calculation of customer bills.
View11-0100902/04/2011Application of Raft River Rural Electric Cooperative, Inc. for authority to amend certificate CPC 680 Sub 3 to reduce its service territory to exclude three sections of land in Elko County, Nevada.
View10-1202412/30/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 521-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View10-1202312/30/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 408 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View10-1200712/03/2010Petition of Nevada Power Company d/b/a NV Energy to establish a regulatory asset related to the Harry Allen Combined Cycle addition to record foregone return, depreciation expense, and incremental operating and maintenance expenses.
View10-1200612/20/2010Application of Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Bighorn Substation Interconnection Project consisting of a 230 kV dead-end transmission structure, approximately 300 feet of 230 kV transmission line, a 230 kV circuit breaker, and associated facilities to be located within and outside of the existing Bighorn 230 kV Substation in Clark County, Nevada.
View10-1102111/18/2010Ray and Traci Marx vs. Nevada Power Company d/b/a NV Energy. Complaint regarding the cost charged to the customer for connection of permanent service as well as the upgrade of the current transformer to the customer's residence.
View10-1101911/15/2010Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 10-04 to adjust the Base Tariff Energy Rates effective January 1, 2011.
View10-1101811/15/2010Nevada Power Company d/b/a NV Energy filed Notice No. 10-04 to adjust the Base Tariff Energy Rates effective January 1, 2011.
View10-1101211/10/2010Application of Cottonwood Mobile Home Park, Inc. to withdraw $4,296.39 from the electric service charge fund for reimbursement of expenses incurred for power line clearance.
View10-1101111/08/2010Sierra Pacific Power Company d/b/a NV Energy filed an accident report of an incident resulting in a fatality that occurred on November 7, 2010 when a vehicle struck a power pole in Winnemucca, Nevada.
View10-1003510/28/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 405 to revise Interruptible Agricultural Irrigation Water Pumping Schedule No. IAIWP to increase the IAIWP rate and decrease the Non-Curtailment Peak rate.
View10-1003110/26/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 517-E to revise Interruptible Irrigation Service Schedule No. IS-2 to increase the IS-2 rate and decrease the Non-Curtailment Peak rate.
View10-1002910/26/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 519-E for approval of a Portfolio Charge to be applicable to Newmont Mining Corporation under Rate Schedule GS-4-NG for calendar year 2011 to recover the additional costs required to meet the Nevada Portfolio Standard.
View10-1002510/25/2010Application of Sierra Pacific Power Company d/b/a NV Energy to establish interim base energy efficiency program rates and base energy efficiency implementation rates pursuant to NRS 704.785 and the Order issued in Docket No. 09-07016.
View10-1002410/25/2010Application of Nevada Power Company d/b/a NV Energy to establish interim base energy efficiency program rates and base energy efficiency implementation rates pursuant to NRS 704.785 and the Order issued in Docket No. 09-07016.
View10-1001510/12/2010Petition of Nevada Power Company d/b/a NV Energy ("NPC") for a Declaratory Order that pursuant to the Order issued in Docket No. 06-06007 MGM Mirage ("MGM") is obligated to pay a proportionate share of the cost incurred by NPC to serve portions of MGM’s Project CityCenter through NPC owned facilities at the Sinatra Substation.
View10-1001310/20/2010Petition of the International Brotherhood of Electrical Workers Local No. 1245 to open an investigatory docket regarding the workforce staffing and planning of Sierra Pacific Power Company d/b/a NV Energy.
View10-0902609/29/2010Application of Sierra Pacific Power Company d/b/a NV Energy for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Anaconda Moly 230 kV Substation Expansion Project consisting of a 230kV transmission line and associated facilities to interconnect the 180 MW Crescent Dunes Solar Energy Project to the existing Anaconda Moly Substation located in Nye County, Nevada.
View10-0900309/01/2010Application of Nevada Power Company d/b/a NV Energy for approval of its Energy Supply Plan Update for 2011-2012.
View10-0802308/26/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 514-E to revise Large Transmission Service Schedule GS-4 to remove Special Condition 13 listing customers who established a level of utility investment under a previous version of the schedule.
View10-0801508/18/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 513-E to revise the Statement of Rates and approve the proposed rates and additions to tariff sheets required to implement the Nevada Dynamic Pricing Trial under the Advanced Service Delivery initiative.
View10-0801408/18/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 402 to revise the Statement of Rates and approve the proposed rates and additions to tariff sheets required to implement the Nevada Dynamic Pricing Trial under the Advanced Service Delivery initiative.
View10-0800908/13/2010Nevada Power Company d/b/a NV Energy filed Notice No. 10-03 to adjust the Base Tariff Energy Rates effective October 1, 2010.
View10-0800808/13/2010Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 10-03 to adjust the Base Tariff Energy Rates effective October 1, 2010.
View10-0800608/12/2010Application of Nevada Power Company d/b/a NV Energy for approval of its 2010 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2010-2029 Integrated Resource Plan.
View10-0701607/19/2010Nevada Power Company d/b/a NV Energy filed an accident report of an incident not witnessed resulting in a fatality that occurred on July 13, 2010 when a person employed by a third party contractor engaged in conveyor belt systems maintenance possibly caught his arm in a moving coal conveyer in the coal yard at the Reid Gardner Power generating facility in Moapa, Nevada.
View10-0701007/12/2010Application of Gentry Manor Mobile Home Park to withdraw $3,000.00 from the service charge fund for reimbursement of expenses incurred to repair and improve the electrical system.
View10-0700807/06/2010Nevada Power Company d/b/a NV Energy filed an accident report of an incident resulting in a fatality that occurred on July 4, 2010 when a vehicle struck a steel utility pole at 3649 Losee Road in North Las Vegas, Nevada.
View10-0700607/02/2010Application of Nevada Power Company d/b/a NV Energy for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Harry Allen 345/230 kV Autotransformer Substation Upgrade Project which consists of a new 345/230 kV autotransformer, three new 345kV circuit breakers, a new 230 kV circuit breaker, 345 kV bus work, and associated protection and metering equipment to be located within the existing Harry Allen Substation in Clark County, Nevada.
View10-0700307/01/2010Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its 2011-2030 Triennial Integrated Resource Plan.
View10-0604006/30/2010Application of Nevada Power Company d/b/a NV Energy for authority to issue secured and unsecured long-term debt securities in an aggregate amount not to exceed $1.65 billion through the period ending December 31, 2013.
View10-0603706/29/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 512-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87, to adjust rates for long-term cogeneration and small power production energy and capacity rates.
View10-0602106/16/2010Joint Petition of Nevada Tri Partners, LLC and Toll Bros., Inc. for an Order extending the terms of Rule 9 Line Extension Agreements with Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy.
View10-0601806/16/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 401 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View10-0601706/16/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 511-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View10-0601606/14/2010Application of Cottonwood Mobile Home Park, Inc. to withdraw $2,233.24 from the electric service charge fund for reimbursement of expenses incurred for federal income taxes for calendar year 2009 and plastic pad lock seals for electric meters.
View10-0600306/01/2010Application of Sierra Pacific Power Company d/b/a NV Energy for approval of new and revised depreciation and amortization rates for its electric operations.
View10-0600106/01/2010Application of Sierra Pacific Power Company d/b/a NV Energy for authority to increase its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View10-0502105/20/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 399 to revise Miscellaneous Charges Schedule No. MC to reduce the third party convenience fee charges for residential customers and separate the fee structure into differing residential and commercial fees.
View10-0501905/21/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 509-E to revise Miscellaneous Charges Schedule No. MC to reduce the third party convenience fee charges for residential customers and separate the fee structure into differing residential and commercial fees.
View10-0501506/01/2010Joint Petition of Shell Energy North America (US), L.P. ("Shell Energy") and the Barrick Mines for a Declaratory Order or Advisory Opinion regarding the appropriate portfolio standards applicable to Shell Energy or any successor new electric resource provider for the Barrick Mines pursuant to the Order issued in Docket No. 10-03029.
View10-0501305/21/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 400 to revise Large General Service-3 Schedule LGS-3 to reflect the Contributed Investment by Clark County Water Reclamation District for three new substations.
View10-0501205/14/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 508-E to revise the Statement of Rates and approve the proposed rates and changes to tariff sheets required to implement the Nevada Dynamic Pricing Trial under the Advanced Service Delivery initiative.
View10-0501105/14/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 398 to revise the Statement of Rates and approve the proposed rates and changes to tariff sheets required to implement the Nevada Dynamic Pricing Trial under the Advanced Service Delivery initiative.
View10-0501005/14/2010Nevada Power Company d/b/a NV Energy filed Notice No. 10-02 to adjust the Base Tariff Energy Rates effective July 1, 2010.
View10-0500805/14/2010Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 10-02 to adjust the Base Tariff Energy Rates effective July 1, 2010.
View10-0402705/05/2010Application of Southern California Edison Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Eldorado-Ivanpah Transmission Project consisting of a 220 kV transmission line and associated upgrades to the Eldorado Substation to connect the new Ivanpah Substation in California to the existing Eldorado Substation located near Boulder City in Clark County, Nevada.
View10-0401404/21/2010Petition of OPOWER, Inc. for an Advisory Opinion or a Declaratory Order permitting behavior-based energy efficiency programs to count as an energy efficiency measure as defined in NRS 704.7802.
View10-0401104/16/2010Complaint. Clark County School District vs. Nevada Power Company d/b/a NV Energy concerning the collection of franchise fees.
View10-0400304/01/2010Petition of Sierra Pacific Power Company d/b/a NV Energy for approval of a Long-Term Service Agreement with Queenstake Resources USA under its Rate Schedule No. GS-4.
View10-0302803/25/2010Petition of Nevada National Guard requesting approval to exceed the Solar Energy Systems Incentive Program’s ("Solar Generations") generating capacity limit for a school facility and to submit an application to participate in the Solar Generations program with four 100 kilowatt solar facilities, and to transfer the Solar Generations application filed for the United States Property and Fiscal Office to the Combined Support Maintenance Shop.
View10-0302603/24/2010Petition of Southwest Energy Efficiency Project requesting the Commission apply to Lawrence Berkeley National Laboratory to conduct a study of potential incentives for NV Energy’s energy efficiency and conservation programs.
View10-0302403/19/2010Status update by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of the Solar Program pursuant to the regulations adopted in Docket No. 09-07014.
View10-0302303/18/2010Application of Sierra Pacific Power Company d/b/a NV Energy for approval of the eighth amendment to the Action Plan of the 2008-2027 Integrated Resource Plan as it relates to the addition of an Advanced Service Delivery project and a Demand Response program to its Demand Side Plan, the postponement of the proposed Ely Energy Center indefinitely, two long-term Related Purchase Power Agreements, participation in the ON Line project, and other matters related thereto.
View10-0302203/18/2010Petition of Nevada Power Company d/b/a NV Energy requesting a determination under NRS 704.7821 that the terms and conditions of five renewable power purchase agreements are just and reasonable and allowing a limited deviation from the requirements of NAC 704.8885.
View10-0301003/03/2010Second amended application of Amargosa Valley Solar I, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Amargosa Solar Power Project consisting of a 536 MW solar thermal plant, related electric and water transmission facilities, wastewater septic system, and associated facilities to be located approximately 80 miles northwest of Las Vegas in Nye County, Nevada.
View10-0300603/01/2010Petition of Nevada Power Company d/b/a NV Energy to offset the Deferred Energy Accounting Adjustment credit balance against the Deferred Base Tariff General Rate debit balance.
View10-0300403/01/2010Application of Sierra Pacific Power Company d/b/a NV Energy to refund deferred energy costs, establish a new Deferred Energy Accounting Adjustment Rate, reset the Temporary Renewable Energy Development Charge, and reset the Renewable Energy Program Rate.
View10-0300303/01/2010Application of Nevada Power Company d/b/a NV Energy to refund deferred energy costs, establish a new Deferred Energy Accounting Adjustment Rate, reset the Temporary Renewable Energy Development Charge, reset the Renewable Energy Program Rate, recover costs of incentives paid to customers in the air conditioning load management program, and other matters related thereto.
View10-0202602/17/2010Petition of Nevada Power Company d/b/a NV Energy requesting to extend the amortization period for the Western Energy Crisis Amortization rate by one month.
View10-0201802/12/2010Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 10-01 to adjust the Base Tariff Energy Rates effective April 1, 2010.
View10-0201702/12/2010Nevada Power Company d/b/a NV Energy filed Notice No. 10-01 to adjust the Base Tariff Energy Rates effective April 1, 2010.
View10-0201202/05/2010Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 506-E to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Schedule CSPP - Short-Term.
View10-0201102/05/2010Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 395 to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule QF-Short Term.
View10-0201002/05/2010Petition of Sierra Pacific Power Company d/b/a NV Energy ("SPPC") for an Order permitting deviation from NAC 704.8885(1), 704.9113 and 704.9512(1)(a) regarding a short-term energy and portfolio energy credit transaction between SPPC and Idaho Power Company.
View10-0200902/04/2010Application of Nevada Power Company d/b/a NV Energy for approval of its 2010-2029 Triennial Integrated Resource Plan.
View10-0101401/20/2010Petition of Nevada Power Company d/b/a NV Energy for approval of the Settlement Agreement and the Large Project Service Agreement with Clark County on behalf of its Department of Aviation including provisions that deviate from Rule No. 9 and the Order issued in Docket No. 06-06007.
View10-0100901/12/2010Application of Nevada Power Company d/b/a NV Energy for authority to amend certificate CPC 613 Sub 10 to expand its service territory to include a 48 square mile area that is contiguous with its existing service territory in Clark County, Nevada.
View09-1202012/29/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 505-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View09-1201912/29/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 394 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View09-1201812/31/2009Application of Fairview Mobile Manor to withdraw $4,248.24 from the service charge account for reimbursement of expenses incurred to repair and upgrade the electrical system.
View09-1200212/02/2009Application of Sierra Pacific Power Company d/b/a NV Energy for approval of disposition of Kings Beach Generation Facility and additional requests relating to proposed transaction.
View09-1101911/13/2009Nevada Power Company d/b/a NV Energy filed Notice No. 09-04 to adjust the Base Tariff Energy Rates effective January 1, 2010.
View09-1101711/13/2009Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 09-04 to adjust the Base Tariff Energy Rates effective January 1, 2010.
View09-1101611/13/2009Sierra Pacific Power Company d/b/a NV Energy filed an accident report of an incident resulting in a fatality that occurred on October 31, 2009 when a pickup truck struck a power pole at Vista Boulevard and Alpland Lane in Sparks, Nevada.
View09-1101311/09/2009Application of Kietzke Manor Mobile Home Park to withdraw $1,783.94 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View09-1101111/09/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter 392 for approval of General Service Hybrid Electric Vehicle Recharge Rider - Time-of-Use Schedule GSHEVRR - TOU in compliance with the Order issued in Docket No. 08-12002.
View09-1100511/04/2009Application of TransWest Express, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the TransWest Express Transmission Project consisting of a 600 kV DC transmission line running from central Wyoming to southern Nevada and associated facilities, with the transmission line entering the state north of Mesquite and terminating southwest of Boulder City, Nevada.
View09-1100311/02/2009Petition of Nevada Power Company d/b/a NV Energy ("NPC") for an Advisory Opinion or an Order permitting deviation from NAC 704.8885(1), 704.9113 and 704.9512(1)(a) regarding a specific short-term energy and Portfolio Energy Credit transaction between NPC and PacifiCorp.
View09-1100211/02/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 393 to revise Interruptible Agricultural Irrigation Water Pumping Schedule No. IAIWP to increase the IAIWP rate and decrease the Peak Penalty rate.
View09-1002310/20/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 391 to revise Electric Line Extensions Rule No. 9 to remove the Economic Stimulus calculation reflecting an increase to the tax factor for distribution depreciable property and transmission depreciable property.
View09-1002210/20/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 504-E to revise Electric Line Extensions Rule No. 9 to remove the Economic Stimulus calculation reflecting an increase to the tax factor for distribution depreciable property and transmission depreciable property.
View09-1001510/14/2009Application of Sierra Vista Mobile Home Park to withdraw $15,000.00 from the service charge fund for reimbursement of expenses incurred to remove trees encroaching utility services and for repairs to the electrical system.
View09-1000710/05/2009Application of Southern California Edison Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Eldorado-Ivanpah Transmission Project to connect the new Ivanpah Substation to its existing Eldorado Substation located in Boulder City, Nevada.
View09-1000610/05/2009Application of Cottonwood Mobile Home Park, Inc. to withdraw $2,035.00 from the electric service charge fund for reimbursement of expenses incurred for federal income taxes for calendar years 2002 through 2007.
View09-0902009/17/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 503-E to revise Interruptible Irrigation Service Schedule No. IS-2 to increase the IS-2 rate and decrease the Peak Penalty rate.
View09-0900109/01/2009Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its Energy Supply Plan Update for 2010.
View09-0803108/27/2009Application of Nevada Power Company d/b/a NV Energy for approval of the Distribution-Only Service Agreement with the City of Las Vegas and the Colorado River Commission.
View09-0802008/14/2009Application of Nevada Power Company d/b/a NV Energy for approval of the twelfth amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to three new renewable power purchase agreements, a related PV integration and intermittency study, a settlement agreement and related amendments to existing purchased power agreements with Ormat Nevada and various Ormat subsidiaries, and the 2010 Interim Demand Side Plan.
View09-0801808/14/2009Application of Sierra Pacific Power Company d/b/a NV Energy for approval of the seventh amendment to the Action Plan of the 2008 - 2027 Integrated Resource Plan as it relates to a settlement agreement and related amendments to existing purchased power agreements with Ormat Nevada and various Ormat subsidiaries.
View09-0801708/14/2009Application of Sierra Pacific Power Company d/b/a NV Energy for approval of its 2009 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2008-2027 Integrated Resource Plan.
View09-0801508/12/2009Nevada Power Company d/b/a NV Energy filed Notice No. 09-03 to adjust the Base Tariff Energy Rates effective October 1, 2009.
View09-0801308/12/2009Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 09-03 to adjust the Base Tariff Energy Rates effective October 1, 2009.
View09-0702407/31/2009Application of Sierra Pacific Power Company d/b/a NV Energy for authority to issue $255 million of new long-term debt securities, new refinancing authority of $348.25 million, authority to restate $845 million of existing authority, and to rescind $300 million in contingent authority related to the Ely Energy Center.
View09-0701007/10/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 502-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87, to adjust rates for long-term cogeneration and small power production energy and capacity rates.
View09-0700707/01/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 501-E for approval of a Portfolio Charge to be applicable to Newmont Mining Corporation taking service under Rate Schedule GS-4-NG to recover the additional cost required to meet the Nevada Portfolio Standard.
View09-0700507/01/2009Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy requesting the Commission accept their portfolio optimization strategy for 2010-2012, and make a predetermination that their strategy is prudent.
View09-0700312/18/2009Application of Nevada Power Company d/b/a NV Energy for approval of the Energy Supply Plan component of its triennial Integrated Resource Plan for the period 2010-2029.
View09-0603606/30/2009Application of Boulder City Trailer Park to withdraw $15,000.00 from the service charge account for reimbursement of expenses incurred to repair and maintain the electric distribution system.
View09-0602506/23/2009Application of Gentry Manor Mobile Home Park to withdraw $2,500.00 from the service charge fund for reimbursement of expenses incurred to repair and improve the electrical system.
View09-0602206/19/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 390 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View09-0602106/19/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 500-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View09-0601506/15/2009Application of Sierra Pacific Power Company d/b/a NV Energy and Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct the One Nevada Transmission Line Project consisting of an expansion of the existing Falcon Substation, the new Robinson Summit Substation, approximately 235 miles of new 500 kV transmission line from the new Robinson Summit Substation to the existing Harry Allen Substation, and associated facilities to be located in White Pine, Lincoln, Nye, Clark, and Eureka Counties, Nevada.
View09-0601206/11/2009Report of Nevada Power Company d/b/a NV Energy ("NPC") regarding the physical gas supply for NPC's generating fleet in compliance with the Order issued in Docket No. 08-08030.
View09-0600806/08/2009Application of Cottonwood Mobile Home Park, Inc. to withdraw $834.65 from the service charge fund for reimbursement of expenses incurred to repair and maintain the electrical system.
View09-0503405/21/2009Application of Green Acres Mobilehome Park to withdraw $4,725.07 from the meter service fee account for reimbursement of expenses incurred to repair and maintain the electrical system.
View09-0502905/21/2009Application of PacifiCorp d/b/a Rocky Mountain Power for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Energy Gateway South Transmission Project consisting of approximately 77 miles of 500 kV transmission line and ancillary facilities to be located in Clark and Lincoln Counties, Nevada.
View09-0502505/15/2009Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 09-02 to adjust the Base Tariff Energy Rates effective July 1, 2009.
View09-0502305/15/2009Nevada Power Company d/b/a NV Energy filed Notice No. 09-02 to adjust the Base Tariff Energy Rates effective July 1, 2009.
View09-0500605/04/2009Application of Cottonwood Mobile Home Park, Inc. to withdraw $834.65 from the service charge fund for reimbursement of expenses incurred to repair and improve the electrical system.
View09-0402305/06/2009Application of Cozy Trailer Park to withdraw $1,472.35 from the service charge fund for reimbursement of expenses incurred to repair and improve the electrical system and to close the account.
View09-0402104/29/2009Regulatory Operations Staff of the Public Utilities Commission filed an accident report from Nevada Power Company d/b/a NV Energy of an incident resulting in a fatality that occurred on April 19, 2009 involving a pickup truck traveling half on the sidewalk and half on the street that struck a steel transmission pole at 4200 Block of East Russell Road in Las Vegas, Nevada.
View09-0400704/21/2009Application of Sierra Pacific Power Company d/b/a NV Energy for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Ft. Sage Transmission Line Project consisting of approximately 49.6 miles of 345 kV transmission line between the Ft. Sage Substation and the East Tracy Substation and associated facilities to be located in Washoe and Storey Counties, Nevada.
View09-0303204/07/2009Application of Meadows Trailer Park to withdraw $10,011.20 from the service charge fund for reimbursement of expenses incurred to repair and improve the electrical system.
View09-0303003/27/2009Report of Sierra Pacific Power Company d/b/a NV Energy on the progress of its Action Plan relative to its 2008-2027 Integrated Resource Plan.
View09-0302503/26/2009Petition of the Regulatory Operations Staff for an Order requiring Westcom, Inc. to Appear and Show Cause why it should not be assessed a civil penalty for violation of the provisions of Chapter 455 of the Nevada Revised Statutes.
View09-0302003/25/2009Petition of the Regulatory Operations Staff for an Order requiring Western States Contracting, Inc. to Appear and Show Cause why it should not be assessed a civil penalty for violation of the provisions of Chapter 455 of the Nevada Revised Statutes.
View09-0301103/10/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 382 to revise Net Metering Rider Schedule No. NMR and Generating Facility Interconnection Rule No. 15 in compliance with the Order issued in Docket No. 07-06024.
View09-0301003/10/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 492-E to revise Net Metering Rider Schedule No. NMR and Generating Facility Interconnection Rule No. 15 in compliance with the Order issued in Docket No. 07-06024.
View09-0300803/10/2009Joint Petition of Nevada Power Company d/b/a NV Energy ("NPC") and Sierra Pacific Power Company d/b/a NV Energy ("SPPC") for a Declaratory Order granting waivers of Commission-ordered requirements to provide certain engineering, construction, and cost estimates, certain cost analyses, and impact updates related to the proposed Ely Energy Center as part of NPC's 2009 Integrated Resource Plan ("IRP") and amendment to be filed by SPPC to its IRP.
View09-0300603/09/2009Application of Sierra Pacific Power Company d/b/a NV Energy for approval of the sixth amendment to the Action Plan of the 2008-2027 Integrated Resource Plan for authority to construct the One Nevada Transmission Line; approval of its updated fuel and purchased power forecasts and load forecast; and other matters related thereto.
View09-0300503/09/2009Application of Nevada Power Company d/b/a NV Energy for approval of the eleventh amendment to the Action Plan of the 2007-2026 Integrated Resource Plan for authority to construct the One Nevada Transmission Line; enter into a long-term power purchase agreement; approval of its updated fuel and purchased power forecasts and load forecast; and other matters related thereto.
View09-0203003/02/2009Application of Sierra Pacific Power Company d/b/a NV Energy to establish a new Deferred Energy Accounting Adjustment Rate, to reset the Temporary Renewable Energy Development Charge, and to reset all of the components of the Renewable Energy Program Rates.
View09-0202902/27/2009Application of Nevada Power Company d/b/a NV Energy to establish a new Deferred Energy Accounting Adjustment Rate, to reset the Temporary Renewable Energy Development Charge, to reset all of the components of the Renewable Energy Program Rates, and to recover costs of incentives paid to customers participating in the air conditioning load management program.
View09-0202202/24/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 389 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View09-0202102/24/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 499-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View09-0201902/20/2009Application of Gentry Place Mobile Home Park to withdraw $2,514.27 from the service charge fund for reimbursement of expenses incurred to repair the electrical system.
View09-0201602/13/2009Nevada Power Company d/b/a NV Energy filed Notice No. 09-01 to adjust the Base Tariff Energy Rates effective April 1, 2009.
View09-0201502/13/2009Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 09-01 to adjust the Base Tariff Energy Rates effective April 1, 2009.
View09-0200802/04/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 496-E to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule CSPP-Short Term Rates.
View09-0200702/04/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 386 to submit avoided short term cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule QF-Short Term.
View09-0200502/03/2009Application of Sierra Pacific Power Company d/b/a NV Energy for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Fallon 230 kV Source Project consisting of a 230 kV transmission line approximately 19.4 miles long and the new Greenwave Substation, Carson Lake Switching Station and Pony Express Switching Station to be located in Churchill County, Nevada.
View09-0200302/02/2009Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 497-E to revise Electric Tariff No. 1 to temporarily suspend the collection of the Renewable Energy Program Rate effective April 1, 2009 until the Commission resets the rate in its 2009 Annual Deferred Energy Accounting Adjustment proceeding.
View09-0200202/02/2009Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 387 to revise Tariff No. 1-B to temporarily suspend the collection of the Renewable Energy Program Rate effective April 1, 2009 until the Commission resets the rate in its 2009 Annual Deferred Energy Accounting Adjustment proceeding.
View09-0101601/20/2009Application of Sierra Pacific Power Company d/b/a NV Energy for approval of the fifth amendment to the Action Plan of the 2008 - 2027 Integrated Resource Plan as it relates to an amendment to the WSPP Confirmation with Newmont Nevada Energy Investment LLC and an amendment to the existing renewable power purchase agreements and associated portfolio credits with Homestretch Geothermal.
View09-0101501/21/2009Application of Nevada Power Company d/b/a NV Energy for approval of the tenth amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to amendments to renewable power purchase agreements with NGP Blue Mountain I LLC, Enel Salt Wells, LLC, and Enel Stillwater, LLC, and an amendment to the solar renewable energy credit purchase agreement with SunPower Corporation.
View09-0100601/08/2009Application of Nevada Power Company d/b/a NV Energy for authority under the provisions of the Utility Environmental Protection Act for a permit to construct approximately 0.5 miles of 500kV transmission line interconnecting the Harry Allen Generating Station with the Harry Allen Substation and associated interconnection facilities to be located in Clark County, Nevada.
View08-1202812/30/2008Report of Sierra Pacific Power Company d/b/a NV Energy on the North Valmy Generating Station Northern Coal Plant Expansion filed in compliance with the Order issued in Docket Nos. 08-05014 and 08-05015.
View08-1202512/31/2008Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 495-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View08-1202412/31/2008Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 385 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View08-1202101/07/2009Application of Nevada Power Company d/b/a NV Energy for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Laughlin Substation Transmission Project which consists of a 500 kV transmission line at and between the Laughlin Substation and the Mohave Generating Station and associated facilities to be located in Clark County, Nevada.
View08-1201512/19/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 494-E to close Outdoor Lighting Service Schedule No. OLS to new installations.
View08-1201412/18/2008Application of Vulcan Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Yerington to Las Vegas Transmission Line Project consisting of a 500 kV transmission line approximately 347 miles long and ancillary facilities, to be located in Lyon, Mineral, Esmeralda, Nye, and Clark Counties, Nevada.
View08-1201012/05/2008Application of Great Basin Transmission, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Southern Nevada Intertie Project consisting of a 500 kV electrical transmission line approximately 60 miles long and related facilities to be located in Clark County, Nevada.
View08-1200412/03/2008Application of Nevada Power Company filed under Advice Letter No. 383 to revise its Large General Service-3 Schedule LGS-3 to set the investment amount by which the Facility Charge is calculated for the MGM Block A portion of the Project City Center development.
View08-1200212/01/2008Application of Nevada Power Company for authority to increase its annual revenue requirement for general rates charged to all classes of customers to recover costs of acquiring the Bighorn Power Plant, constructing the Clark Peakers, environmental retrofits, and other generating, transmission, and distribution plant additions; to reflect changes in cost of service; and for relief properly related thereto.
View08-1102611/26/2008Application of Green Acres Mobilehome Park to withdraw $2,942.03 from the meter service fee account for reimbursement of expenses incurred to repair and maintain the electrical system.
View08-1101511/14/2008Sierra Pacific Power Company filed Notice No. 08-04 to adjust the Base Tariff Energy Rates effective January 1, 2009.
View08-1101411/14/2008Nevada Power Company filed Notice No. 08-04 to adjust the Base Tariff Energy Rates effective January 1, 2009.
View08-1101311/14/2008Application of Nevada Power Company filed under Advice Letter No. 380 to rename Schedule AIWP, Agricultural Irrigation Water Pumping, to Schedule IAIWP, Interruptible Agricultural Irrigation Water Pumping, to establish the 2009 rate for service and modify Schedule IAIWP to the terms and conditions of service of Schedule IS-2 of Sierra Pacific Power Company.
View08-1100211/03/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 491-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View08-1100111/03/2008Application of Nevada Power Company filed under Advice Letter No. 379 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View08-1004310/30/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 490-E to revise the Statement of Rates and Interruptible Irrigation Service Schedule No. IS-2 to increase the IS-2 rate and establish the Peak Period Non-Curtailment Penalty rate.
View08-1004010/29/2008Application of Nevada Power Company filed under Advice Letter No. 378 to revise Electric Line Extensions Rule No. 9 to clarify the calculation of refunds to Master Planned Communities.
View08-1003010/22/2008Bob Abelew vs. Sierra Pacific Power Company. Complaint regarding line extension costs.
View08-1002910/20/2008Application of Nevada Power Company for an order authorizing modification of its 2007 financing authority to issue $1.25 billion of new long-term debt securities, to allow new refinancing authority of $192.5 million, to restate $1.578 billion of existing authority, to rescind $1.0 billion in contingent authority related to the Ely Energy Center, and additional authority related thereto.
View08-1002710/20/2008Petition of Sierra Pacific Power Company to amend CPC 685 Sub 18 to reflect the addition of fictitious ("d/b/a") name NV Energy for its electrical services.
View08-1002610/20/2008Petition of Nevada Power Company to amend CPC 613 Sub 9 to reflect the addition of fictitious ("d/b/a") name NV Energy.
View08-1001910/13/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 489-E to revise Electric Tariff No. 1 to reflect the addition of fictitious (d/b/a) name "NV Energy" to the tariffs the company will be using to bill its customers.
View08-1001810/13/2008Application of Nevada Power Company filed under Advice Letter No. 377 to revise Electric Tariff No. 1 to reflect the addition of fictitious (d/b/a) name "NV Energy" to the tariffs the company will be using to bill its customers.
View08-1001610/10/2008Application of Cottonwood Mobile Home Park, Inc. to withdraw $5,145.40 from the service charge fund for reimbursement of expenses incurred to repair the electrical system and to remove and or trim trees around the power lines.
View08-1001410/13/2008Notice by Sierra Pacific Power Company that it has begun doing business as Sierra Pacific Power Company d/b/a NV Energy and Advice Letter No. 489-E to reflect new d/b/a on tariff sheets pertaining to rates charged to customers.
View08-1001310/13/2008Notice by Nevada Power Company that it has begun doing business as Nevada Power Company d/b/a NV Energy and Advice Letter No. 377 to reflect new d/b/a on tariff sheets pertaining to rates charged to customers.
View08-0901209/17/2008Application of Nevada Power Company filed under Advice Letter No. 376 to revise Tariff No. 1-B to clarify guarantee language for Schedule Nos. TRS-TOU Trial Residential Service - Time-of-Use, TRM-TOU Trial Residential Service - Multi-Family - Time-of-Use, and TLRS-TOU Trial Large Residential Service - Time-of-Use.
View08-0901109/17/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 488-E to revise Electric Tariff No. 1 to include a guarantee for Schedule Nos. OD-1-TOU Optional Domestic Service - Time-of-Use Experimental and ODM-1-TOU Optional Domestic Service Multi-Family - Time-of-Use Experimental.
View08-0900209/03/2008Application of Cottonwood Mobile Home Park, Inc. to withdraw $4,643.69 from the service charge fund for reimbursement of expenses incurred to repair the electrical system and to trim trees around the power lines.
View08-0803108/29/2008Application of Sierra Pacific Power Company for approval of its Energy Supply Plan Update for 2009-2010.
View08-0803008/29/2008Application of Nevada Power Company for approval of its Energy Supply Plan Update for 2009.
View08-0802508/25/2008Application of Trailerdale Trailer Park to withdraw $4,866.00 from the service charge fund for reimbursement of expenses incurred to repair the electrical system.
View08-0801908/18/2008Application of Sierra Pacific Power Company for approval of the fourth amendment to the Action Plan of the 2008 - 2027 Integrated Resource Plan as it relates to the Carson Lake Geothermal Power Project.
View08-0801808/18/2008Application of Nevada Power Company for approval of the ninth amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to the Carson Lake Geothermal Power Project.
View08-0801508/15/2008Sierra Pacific Power Company filed Notice No. 08-03 to adjust the Base Tariff Energy Rates effective October 1, 2008.
View08-0801408/15/2008Nevada Power Company filed Notice No. 08-03 to adjust the Base Tariff Energy Rates effective October 1, 2008.
View08-0801208/15/2008Application of Sierra Pacific Power Company for approval of its 2008 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2008-2027 Integrated Resource Plan.
View08-0801108/15/2008Application of Nevada Power Company for approval of its 2008 Annual Demand Side Management Update Report as it relates to the Action Plan of its 2007-2026 Integrated Resource Plan.
View08-0800708/11/2008Regulatory Operations Staff of the Public Utilities Commission filed an accident report from Nevada Power Company of an incident resulting in a fatality that occurred on August 6, 2008 involving a car traveling at a high rate of speed that struck a steel transmission pole at 9550 W. Cheyenne in Las Vegas, Nevada.
View08-0800208/01/2008Report of Nevada Power Company on its Life Span Analysis Process filed in compliance with the Order issued in Docket Nos. 06-11022 and 06-11023.
View08-0702107/28/2008Application of Nevada Power Company filed under Advice Letter No. 375 to terminate the collection of the Deferred Energy Accounting Adjustments for Periods 5 and 6 and the Solar Energy Demonstration Program rates pursuant to the Order issued in Docket No. 07-01022.
View08-0701707/29/2008Application of Vulcan Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct 263 miles of 500 kV transmission line from the California-Nevada border north to a point where the line would divide into two 500 kV lines and continue north, one to terminate near Fernley and the other near Salt Wells, and 15 miles of 230 kV transmission line from Salt Wells to the Dixie Valley corridor crossing lands in Churchill, Lyon, Mineral, and Washoe Counties, Nevada.
View08-0701207/14/2008Application of Nevada Power Company filed under Advice Letter No. 374 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View08-0701007/14/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 485-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View08-0700507/09/2008Application of Sierra Pacific Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Blackhawk Substation and Transmission Line Project which consists of a new 345 kV substation, 17 miles of new 345 kV transmission lines, and associated substation facilities at the existing East Tracy Substation located in Storey County, Nevada.
View08-0700107/01/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 487-E to revise Electric Tariff No. 1 to terminate the collection of the deferred energy account adjustment rate in compliance with the Order issued in Docket 06-12001.
View08-0603206/30/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 486-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87, to adjust rates for long-term cogeneration and small power production energy and capacity rates.
View08-0600606/03/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 484-E to modify the Statement of Rates related to Schedule IS-2 - Interruptible Irrigation Rate to provide continuity between the tariff sheet accepted in Docket No. 08-02022, effective April 1, 2008, and the tariff sheet accepted in Docket No. 08-02027, effective March 1, 2008.
View08-0501605/22/2008Application of Sierra Vista Mobile Home Park to withdraw $2,747.00 from the service charge fund for reimbursement of expenses incurred to repair the electrical system.
View08-0501505/21/2008Application of Sierra Pacific Power Company for approval of the third amendment to the Action Plan of the 2008 - 2027 Integrated Resource Plan for authorization to modify the schedule and development budget for the Ely Energy Center.
View08-0501405/21/2008Application of Nevada Power Company for approval of the eighth amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan for authorization to modify the schedule and development budget for the Ely Energy Center, acquire the Bighorn Power Plant, construct a combined cycle facility at the existing Harry Allen site, construct two transmission projects, and increase its Gas Supply Portfolio.
View08-0500605/15/2008Application of Nevada Power Company to adjust the Base Tariff Energy Rates effective July 1, 2008.
View08-0500405/15/2008Application of Sierra Pacific Power Company to adjust the Base Tariff Energy Rates effective July 1, 2008.
View08-0404104/30/2008Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct supporting structures for one future 230 kV transmission line approximately 2.29 miles in length and approximately 2,700 feet of underground conduit as part of the Collman Substation Project to be located in Clark County, Nevada.
View08-0403804/28/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 483-E to modify the Interruptible Irrigation Rate Schedule No. IS-2 to reflect the new Peak Period Non-Curtailment Penalty.
View08-0403304/21/2008Application of Holbrook Station LLC to withdraw $1,770.00 from the service charge fund for reimbursement of expenses incurred to repair the electrical system.
View08-0403204/21/2008Joint application of Nevada Power Company and Sierra Pacific Power Company for approval of the sale and purchase of portfolio energy credits between the companies.
View08-0403104/21/2008Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a 230/138 kV transformer interconnection and associated facilities at the existing McDonald Substation located in Clark County, Nevada.
View08-0400404/02/2008Application of Nevada Power Company for approval of Amendment No. 2 to the Special Contract for the Provision of Distribution-Only Service to the Las Vegas Valley Water District and the Colorado River Commission.
View08-0400104/01/2008Report of Nevada Power Company on the progress of its Action Plan relative to its 2007-2026 Integrated Resource Plan.
View08-0303503/27/2008Application of Sierra Pacific Power Company for approval of the second amendment to the Action Plan of the 2008 - 2027 Integrated Resource Plan as it relates to a renewable energy agreement, continued funding of CO2 research, and a revised load forecast.
View08-0303403/26/2008Application of Nevada Power Company for approval of the seventh amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to the construction of two new renewable energy projects, revisions to its Transmission Plan, and other matters related thereto.
View08-0303003/21/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 482-E to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View08-0302803/21/2008Application of Nevada Power Company filed under Advice Letter No. 373 to revise Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View08-0302503/18/2008Application of Barrick Gold U.S. Inc., operator of Cortez Joint Venture d/b/a Cortez Gold Mines, to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View08-0301503/10/2008Application of Nevada Power Company filed under Advice Letter No. 372 to revise Definitions Rule No. 1 to add the definition of abnormal risk.
View08-0301303/10/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 481-E to revise its electric tariff Definitions Rule No. 1 to modify the definition of abnormal risk.
View08-0300803/07/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 478-E for approval of a Portfolio Charge to recover the additional cost required to meet the Nevada Portfolio Standard under Rate Schedule GS-4-NG.
View08-0300203/05/2008Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to expand and upgrade the existing Harry Allen Generation Facility by installing combined cycle power generation units and accessory structures to be known as the Harry Allen Combined Cycle Plant to be located at the Apex Industrial Park in Clark County, Nevada.
View08-0204303/06/2008Application of Sierra Pacific Power Company to establish a new Deferred Energy Accounting Adjustment Rate, recover settlement costs related to the Western Energy Crisis, implement a new Temporary Renewable Energy Development Charge, and establish a rate to recover the costs of the Solar Program, Wind Demonstration Program, and Waterpower Demonstration Program.
View08-0204203/06/2008Application of Nevada Power Company to establish a new Deferred Energy Accounting Adjustment Rate, implement a new Temporary Renewable Energy Development Charge, and establish a rate to recover the costs of the Solar Program, Wind Demonstration Program, and Waterpower Demonstration Program.
View08-0202702/20/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 479-E to modify the Statement of Rates related to Schedule IS-2 - Interruptible Irrigation Rate.
View08-0202302/15/2008Application of Nevada Power Company to adjust the Base Tariff Energy Rates effective April 1, 2008.
View08-0202202/15/2008Application of Sierra Pacific Power Company to adjust the Base Tariff Energy Rates effective April 1, 2008.
View08-0201302/08/2008Application of Sierra Pacific Power Company filed under Advice Letter No. 476-E to reflect an increase in the point-to-point transmission rates for Bonneville Power Administration pursuant to Schedule No. CSPP Short-Term Rates, Cogeneration and Small Power Production.
View08-0201202/08/2008Advice Letter No. 370 of Nevada Power Company to file avoided short term cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule QF-Short Term.
View08-0200302/01/2008Application of Nevada Power Company for approval of the sixth amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan and approval of the Ormat Settlement Agreement.
View08-0200202/01/2008Application of Sierra Pacific Power Company for approval of the first amendment to the Action Plan of the 2008 - 2027 Integrated Resource Plan and approval of the Ormat Settlement Agreement.
View08-0102101/29/2008Request by Sierra Pacific Power Company to revise Schedule IS-2, Interruptible Irrigation Service, of its Electric Tariff No. 1.
View08-0101601/25/2008Application of Eureka Moly, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct approximately 24.3 miles of 230 kV transmission line from the Machacek Substation to the Mount Hope Substation to be located in Eureka County, Nevada.
View07-1202312/19/2007Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct transmission facilities for the Northwest Substation 230/138 kV Autotransformer Upgrade Project to be located in the northwest Las Vegas Valley, Nevada.
View07-1202012/14/2007Application of Nevada Power Company for approval of the fifth amendment to the Action Plan of the 2007-2026 Integrated Resource Plan as it relates to revisions to its Demand Side Management Plan and new agreements with Las Vegas Cogeneration Limited Partnership and Dynegy Power Marketing, Inc.
View07-1201612/12/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 474-E to revise Tariff No. 1-B, Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View07-1201512/12/2007Application of Nevada Power Company filed under Advice Letter No. 368 to revise Tariff No. 1-B, Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View07-1200112/03/2007Application of Sierra Pacific Power Company for authority to begin to recover the costs of constructing the new Tracy Combined Cycle Unit and other plant additions and costs of service through an increase of its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View07-1102111/15/2007Application of Sierra Pacific Power Company to adjust the Base Tariff Energy Rates effective January 1, 2008.
View07-1102011/15/2007Application of Nevada Power Company to adjust the Base Tariff Energy Rates effective January 1, 2008.
View07-0901309/18/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 472-E to revise Electric Tariff No. 1 to introduce Schedule GS-4-New Generation and to modify existing Incremental Pricing Schedule No. IP.
View07-0901009/17/2007Application of Silver Springs Mobile Home Park to withdraw $2,379.44 from the service charge account for reimbursement of expenses incurred to repair and upgrade the electrical system.
View07-0900509/17/2007Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Arden Substation Expansion Project consisting of the relocation of the Arden-Magnolia, Arden-Bighorn, and Arden-Avera 230 kV transmission lines to be located in the southwest Las Vegas Valley, Nevada.
View07-0802008/20/2007Application of Toquop Energy, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a 750 MW pulverized coal-fired electric generation facility and associated facilities including a 31 mile rail line, a well field in the Tule Desert, an underground 13 mile water pipeline and a new transmission substation to be located in Lincoln County, Nevada.
View07-0801808/15/2007Application of Sierra Pacific Power Company to adjust the Base Tariff Energy Rates effective October 1, 2007.
View07-0801708/15/2007Application of Nevada Power Company to adjust the Base Tariff Energy Rates effective October 1, 2007.
View07-0801608/16/2007Application of Nevada Power Company for approval of its annual Demand Side Management Update Report as it relates to the three-year Action Plan of its 2007-2026 Integrated Resource Plan.
View07-0800808/08/2007Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct at the Clark Generating Station a new 230 kV switch station onto the new peaking Generator Block No. 1 to interconnect to the existing Faulkner-Winterwood 230 kV transmission line to be located in the central Las Vegas Valley, Nevada.
View07-0800708/08/2007Application of Meadows Park LLC to withdraw $16,750.84 from the electric service charge fund for reimbursement of expenses incurred to repair the electrical system.
View07-0702307/25/2007Complaint. Energy Control Systems Inc. vs. Sierra Pacific Resources, Sierra Pacific Power Company, and Nevada Power Company for resolution of a dispute concerning Rule 16, Service Connections, Meters and Customer's Facilities.
View07-0702207/25/2007Application of Silver Springs Mobile Home Park to withdraw $2,379.44 from the service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View07-0702007/23/2007Petition of Northern Nevada Industrial Electric Users to open an investigatory docket into interstate pipeline reservation cost allocation for determination of Sierra Pacific Power Company's base tariff energy rate.
View07-0701707/18/2007Application of Nevada Power Company filed under Advice Letter No. 366 to revise Tariff No. 1-B, Electric Line Extensions Rule No. 9 to include Line Extension Allowance and Master Planned Community refunding for the Large Residential Service.
View07-0701607/18/2007Notice of Excess Energy (UK) Limited of self-certification of a qualifying facility under the Public Utilities Regulatory Policy Act (PURPA) in accordance with the Federal Energy Regulatory Commission (FERC) requirements.
View07-0701307/16/2007Application of Nevada Power Company for approval of the fourth amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan and its annual Energy Supply Plan Update.
View07-0701107/16/2007Application of Fairview Mobile Manor to withdraw $18,815.91 from the service charge account for reimbursement of expenses incurred to repair and upgrade the electrical system.
View07-0604906/29/2007Application of Sierra Pacific Power Company for approval of its 2008 to 2027 Integrated Resource Plan.
View07-0604406/28/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 470-E to revise Tariff No. 1, Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View07-0604306/28/2007Application of Nevada Power Company filed under Advice Letter No. 365 to revise Tariff No. 1-B, Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View07-0604106/28/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 468-E to revise Electric Tariff No. 1 to change the term "Customer Charge" to "Basic Service Charge" to provide a clearer understanding of the term.
View07-0604006/28/2007Application of Nevada Power Company filed under Advice Letter No. 363 to revise Tariff No. 1-B to change the term "Customer Charge" to "Basic Service Charge" to provide a clearer understanding of the term.
View07-0603906/27/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 469-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87 to adjust rates for long-term cogeneration and small power production energy and capacity rates.
View07-0603506/22/2007Application of Nevada Power Company for authority to amend certificate CPC 613 Sub 8 to expand its service territory to provide service to an area contiguous to its existing service territory and the Silverhawk Generating Station in Clark County, Nevada.
View07-0603406/22/2007Application of Boulder City Trailer Park to withdraw $10,000.00 from the service charge account for reimbursement of expenses incurred to upgrade the electric distribution system.
View07-0603306/21/2007Application of Sierra Pacific Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a new 345 kV transmission line from the existing East Tracy Substation to a new Emma Substation and to upgrade both substations located in Storey County, Nevada.
View07-0601106/08/2007Application of Great Basin Transmission, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Harry Allen to Thirtymile Project, a 500 kV electrical transmission facility and ancillary facilities to be located within Clark County, Lincoln County, Nye County and White Pine County, Nevada.
View07-0600206/01/2007Application of Nevada Power Company for Approval of Amendment No. 1 to the Special Contract for the Provision of Distribution-Only Service to the Las Vegas Valley Water District and the Colorado River Commission.
View07-0600106/01/2007Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Centennial/Hualapai Substation consisting of a 230/12 kV, 100 MVA distribution substation and approximately one and one-half miles of a double-circuit 230 kV overhead transmission line to be located in northwest Las Vegas Valley, Nevada.
View07-0502805/25/2007Petition of Nevada Power Company for approval of Amendment No. 1 to the Special Contract for the Provision of Distribution-Only Service to the Las Vegas Valley Water District and the Colorado River Commission.
View07-0502205/18/2007Application of Nevada Power Company filed under Advice Letter No. 361 to replace Schedule ORS-LM, Optional Residential Service - Load Management with Schedule OLM, Optional Load Management which will be applicable to all customers who participate in the Air Conditioning Load Management program and in conjunction with the residential and non-residential rate schedules.
View07-0500705/09/2007Application of Nevada Power Company filed under Advice Letter No. 360 to submit its Cogeneration and Small Power Production - Qualifying Facilities Schedule QF-Short Term, with no change in rates, in accordance with NAC 704.8783 which requires electric utilities to file their avoided short-term cost rates for purchases from Qualifying Facilities.
View07-0500605/09/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 467-E to revise Schedule No. CSPP Short-Term Rates, Cogeneration and Small Power Production to reflect an increase in the point-to-point transmission rates for PacifiCorp and Bonneville Power Administrative, in accordance with NAC 704.8783 which requires electric utilities to file their avoided short-term cost rates for purchases from Qualifying Facilities.
View07-0403004/30/2007Petition of LVE Energy Partners, LLC for a Declaratory Order or in the alternative for an Advisory Opinion that the Central Energy Facilities associated with the Echelon Place are not subject to regulation by the Commission.
View07-0402804/25/2007Implementation of the January 25, 2006 District Court Order for review of Sierra Pacific Power Company's Pinon Pine project expenditures.
View07-0402204/19/2007Application of Kietzke Manor Mobile Home Park to withdraw $4,067.08 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View07-0401904/12/2007Joint application of Nevada Power Company and Sierra Pacific Power Company for approval of the sale and purchase of portfolio energy credits between the companies and approval to account for additional portfolio energy credits earned from commercial energy efficiency measures.
View07-0301003/12/2007Application of Nevada Power Company filed under Advice Letter No. 359 to revise Tariff No. 1-B to adjust the quarterly surcharge reflecting revised franchise tax rates.
View07-0300503/07/2007Application of Sierra Pacific Power Company for authority to issue secured and unsecured long-term debt securities in an aggregate amount not to exceed $1.72 billion through the period ending December 31, 2009.
View07-0300403/07/2007Application of Nevada Power Company for authority to issue secured and unsecured long-term debt securities in an aggregate amount not to exceed $3.91 billion through the period ending December 31, 2009.
View07-0203803/07/2007Application of Valley Electric Association for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Stirling Mountain to Northwest 230 kV Transmission Line Project consisting of approximately 36.7 miles of new overhead 230 kV transmission line to be located in unincorporated areas in Clark and Nye Counties, Nevada.
View07-0201502/09/2007Application of Nevada Power Company for approval of the third amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to two renewable power purchase agreements.
View07-0200902/08/2007Application of Nevada Power Company filed under Advice Letter No. 358 to revise Tariff No. 1-B to move the Nellis Air Force Base customer from the Large General Service - Extra Large rate schedule to the Large General Service - 3 rate schedule.
View07-0200202/02/2007Application of Smokey Ridge Mobile Home Park to withdraw up to $3,773.81 from the service charge account for reimbursement of expenses incurred to repair and maintain the electrical system and to close the account.
View07-0200102/02/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 466-E to revise Electric Tariff No. 1 to modify Interruptible Irrigation Service Schedule IS-2 in Compliance with the Order issued in Docket Nos. 05-10003 and 05-10004.
View07-0103801/31/2007Application of Valley Electric Association for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Stirling to Northwest 230 kV Transmission Project to be located in southern Nevada.
View07-0103601/24/2007Application of Sierra Pacific Power Company for approval of the fourteenth amendment to the Action Plan of the 2005 - 2024 Integrated Resource Plan as it relates to renewable power purchase agreements.
View07-0103501/24/2007Application of Nevada Power Company for approval of the second amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to renewable power purchase agreements, a new renewable energy program and environmental upgrades to the Clark Generation Station.
View07-0103301/29/2007Application of Reliant Energy Wholesale Generation, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a 26-mile 500 kV transmission line from the Reliant Energy Bighorn Electric Generating Station to the Eldorado Substation and modifications to both substations, located in southern Nevada.
View07-0103101/22/2007Application of Villa Sierra Mobile Home Park to withdraw $6,737.32 from the service charge account for reimbursement of expenses incurred to repair and improve the electrical system.
View07-0102301/17/2007Application of Nevada Power Company for authority to recover costs incurred to achieve final resolution of claims arising out of the Western Energy Crisis.
View07-0102201/16/2007Application of Nevada Power Company to establish a new Deferred Energy Accounting Adjustment rate for Period 6 and to reset the Base Tariff Energy Rate and the Temporary Renewable Energy Development Charge for collection of projected future energy costs.
View07-0101901/11/2007Application of Cottonwood Mobile Home Park, Inc. to withdraw $2,867.39 from the service charge account for reimbursement of expenses incurred to repair the electrical system.
View07-0100901/08/2007Application of Sierra Pacific Power Company for approval of the fourteenth amendment to the Action Plan of the 2005 - 2024 Integrated Resource Plan as it relates to renewable power purchase agreements.
View07-0100801/08/2007Application of Nevada Power Company for approval of the second amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to renewable power purchase agreements, a new renewable energy program and environmental upgrades to the Clark Generation Station.
View07-0100601/04/2007Application of Nevada Power Company filed under Advice Letter No. 356 to revise Tariff No. 1-B to adjust the quarterly surcharge reflecting revised franchise tax rates.
View07-0100201/03/2007Application of Sierra Pacific Power Company filed under Advice Letter No. 465-E to revise Tariff No. 1, Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View07-0100101/12/2007Application of Nevada Power Company filed under Advice Letter No. 355 pertaining to Tariff No. 1-B, Electric Line Extensions Rule No. 9 to inform the Commission that the new interest rate for customer deposits has not changed the tax liability factor for advances.
View06-1202012/15/2006Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Valley Electric Interconnection project consisting of a 230 kV breaker with protective relaying equipment, approximately 1,000 feet of underground cable, 3-phase gas-insulated 230kV bus and approximately 6 miles of 230 kV line to be located in northwest Las Vegas Valley, Clark County, Nevada.
View06-1201812/13/2006Petition of the Attorney General's Bureau of Consumer Protection to amend NAC 704.150, including but not limited to the computation of carrying charges on deferred energy balances and a revision for the accumulated deferred income tax offset.
View06-1201112/11/2006Application of Silver Star Properties, LLC to withdraw $2,556.41 from the service charge account for the Sierra Vista Mobile Home Park for reimbursement of expenses incurred to repair and maintain the electrical system.
View06-1200212/01/2006Application of Sierra Pacific Power Company for authority to recover deferred legal and settlement costs incurred to resolve claims arising from the Western Energy Crisis.
View06-1200112/01/2006Application of Sierra Pacific Power Company to establish a new Deferred Energy Accounting Adjustment rate for Period 6, to reset the Base Tariff Energy Rate and to reset the Temporary Renewable Energy Development Charge.
View06-1104012/04/2006Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Sinatra Substation which consists of a 230/138 kV substation, 230 kV transmission line structures and a 230 kV Arden Substation expansion to be located in the central Las Vegas Valley along the Las Vegas Strip in Nevada.
View06-1103511/29/2006Implementation of the October 25, 2006 District Court Order to determine an appropriate rate schedule allowing Nevada Power Company recovery of the $180 million Merrill Lynch-type contract adjustment.
View06-1103311/28/2006Application of Nevada Power Company filed under Advice Letter 354 to revise Tariff No. 1-B to eliminate the Customer Specific Facilities Charge for Nellis Air Force Base because the service location has been taken over by a private contractor.
View06-1103111/22/2006Application of Meadows Trailer Park to withdraw $12,464.86 from the service charge account for reimbursement of expenses incurred to repair and improve the electrical system.
View06-1102311/17/2006Application of Nevada Power Company for approval of new and revised depreciation and amortization rates.
View06-1102211/17/2006Application of Nevada Power Company for authority to increase its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View06-1101511/09/2006Application of Sierra Pacific Power Company for approval of a long-term service agreement with Newmont USA Ltd. d/b/a Newmont Mining Corporation under Electric Tariff No. 1, Large Transmission Service Schedule No. GS-4.
View06-1002510/18/2006Application of Nevada Power Company filed under Advice Letter No. 353 to revise Tariff No. 1-B to adjust the quarterly surcharge reflecting revised franchise tax rates.
View06-1002110/13/2006Application of Nevada Power Company for approval of the first amendment to the Action Plan of the 2007 - 2026 Integrated Resource Plan as it relates to five renewable power purchase agreements.
View06-0902409/20/2006Application of Sierra Pacific Power Company filed under Advice Letter No. 463-E to modify Bills for Service Rule No. 5 and Discontinuance, Termination, Restoration, and Refusal of Service Rule No. 6 in accordance with the Commission rescinding the Order issued November 7, 2005 in Docket No. 05-3005.
View06-0902309/20/2006Application of Nevada Power Company filed under Advice Letter No. 351 to modify Bills for Service Rule No. 5 and Discontinuance, Termination, Restoration, and Refusal of Service Rule No. 6 in accordance with the Commission rescinding the Order issued November 7, 2005 in Docket No. 05-3005.
View06-0900309/01/2006Application of Gentry Manor Mobile Home Park to withdraw $9,000.00 from the tenant service charge account for reimbursement of expenses incurred to redesign and upgrade the electrical system.
View06-0802608/18/2006Petition of Nevada Power Company for a Declaratory Order or in the alternative an Advisory Opinion concerning various aspects of the fuel supply requirements in its contract with Saguaro Power Company.
View06-0802008/15/2006Application of Sierra Pacific Power Company for approval of its annual Demand Side Management Report as it relates to the three-year Action Plan of its 2005 - 2024 Integrated Resource Plan.
View06-0801008/08/2006Application of Nevada Power Company filed under Advice Letter No. 350 to establish Wireless Communication Service Schedule WCS for wireless technology industries that require electric service to operate radio repeaters or other facilities.
View06-0800908/08/2006Application of Sierra Pacific Power Company filed under Advice Letter No. 462-E to establish Wireless Communication Service Schedule WCS for wireless technology industries that require electric service to operate radio repeaters or other facilities.
View06-0800308/02/2006Application of Nevada Power Company under the provisions of the Utility Environmental Protection Act for a permit to construct a 500/320/138 kV substation, the associated substation facilities and the modification of the existing kV transmission lines through and out of the Thunderbird Substation site located in the northeast Las Vegas valley area in the state of Nevada.
View06-0800208/01/2006Application of Nevada Power Company for authority to establish a new Temporary Renewable Energy Development charge and to reduce the currently effective Base Tariff Energy Rate by an equivalent amount.
View06-0800108/01/2006Application of Sierra Pacific Power Company for authority to establish a new Temporary Renewable Energy Development charge and to reduce the currently effective Base Tariff Energy Rate by an equivalent amount.
View06-0702707/28/2006Petition of Nevada Power Company for a Declaratory Order or in the alternative an Advisory Opinion concerning various aspects of the fuel supply requirements in its contract with Las Vegas Cogen.
View06-0702607/28/2006Application of Placer Turquoise Ridge Inc. as Operator of Turquoise Ridge Joint Venture to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
View06-0701007/14/2006Application of Sierra Pacific Power Company for approval of the thirteenth amendment to the Action Plan of the 2005 - 2024 Integrated Resource Plan, for approval of the Energy Supply Plan Update for 2007 and for a determination that the elements of the Energy Supply Plan are prudent.
View06-0605106/30/2006Application of Nevada Power Company for approval of its 2007-2026 Integrated Resource Plan.
View06-0605006/30/2006Application of Sierra Pacific Power Company filed under Advice Letter No. 460-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87 to adjust rates for long-term cogeneration and small power production energy and capacity rates.
View06-0604006/27/2006Petition of the Nevada AFL-CIO to open an investigatory docket regarding the information provided to the Commission to obtain approval of the Action Plans of Nevada Power Company and Sierra Pacific Power Company as to the Solargenix solar power plant project.
View06-0603106/16/2006Application of Sierra Pacific Power Company filed under Advice Letter No. 459-E to revise Tariff No. 1, Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View06-0603006/16/2006Application of Nevada Power Company filed under Advice Letter No. 347 to revise Tariff No. 1-B, Electric Line Extensions Rule No. 9 to adjust the rate used in the taxability of the line extension calculations.
View06-0602206/14/2006Application of Nevada Power Company filed under Advice Letter No. 346 to revise Tariff No. 1-B to adjust the quarterly surcharge reflecting revised franchise tax rates.
View06-0601306/07/2006Application of Nevada Power Company filed under Advice Letter No. 345 to revise Definitions Rule No. 1 to eliminate confusion with the term demand.
View06-0601206/07/2006Application of Sierra Pacific Power Company filed under Advice Letter No. 458-E to revise Definitions Rule No. 1 to eliminate confusion with the term demand.
View06-0601106/06/2006Application of Nevada Power Company filed under the provisions of the Utility Environmental Protection Act for a permit to construct a double circuit 500 kV transmission line, a 230 kV transmission line, replace a 69 kV transmission line with a 230 kV transmission line, and to construct new 500 kV and 230 kV substations at the Sunrise Generating Plant to be located within unincorporated Clark County and the City of Henderson, Nevada.
View06-0600806/05/2006Application of Nevada Power Company and Sierra Pacific Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a coal fired electric generating plant located in unincorporated White Pine County, facilities associated with the plant, 500 kV and 345 kV transmission lines in White Pine, Lincoln and Clark Counties, a new substation in White Pine County, and the expansion of the Harry Allen substation in Clark County.
View06-0600706/05/2006Application of Nevada Power Company for approval of an electric line extension and service contract with MGM Mirage Design Group.
View06-0600606/05/2006Application of Nevada Power Company filed under Advice Letter No. 344 to revise Tariff No. 1-B to move the MGM Grand/Theme Park customer from Schedule LGS-X to Schedule LGS-3 at the customer's request.
View06-0504005/31/2006Application of Sierra Pacific Power Company for approval of the twelfth amendment to the Action Plan of the 2005 - 2024 Integrated Resource Plan as it relates to the long-term firm renewable power purchase agreement with ORNI 14 LLC for the Galena No. 3 Geothermal Power Project and for approval of the imputed debt mitigation.
View06-0503805/26/2006Application of Nevada Power Company filed under Advice Letter No. 343 to revise Tariff No. 1-B to adjust the customer specific facilities charge for Circus Circus Properties under rate Schedule LGS-X Large General Service - Extra Large.
View06-0503405/24/2006Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct 230 kV overhead transmission lines and related structures located in unincorporated Clark County to connect the existing Magnolia-Merchant 230 kV transmission line with a planned substation to be sited within the City of Henderson, Nevada.
View06-0500905/04/2006Application of Cottonwood Mobile Home Park, Inc. to withdraw $1,303.42 from the electric tenant service charge account for reimbursement of expenses incurred to repair and upgrade the electrical system.
View06-0500805/04/2006Application of Cottonwood Mobile Home Park, Inc. to withdraw $654.02 from the electric tenant service charge account for reimbursement of expenses incurred to repair and upgrade the electrical system.
View06-0403104/25/2006Application of Nevada Power Company for approval of the twelfth amendment to the Action Plan of the 2003 - 2022 Integrated Resource Plan as it relates to the purchase agreement for portfolio energy credits from Beowawe, LLC.
View06-0403004/25/2006Application of Sierra Pacific Power Company for approval of the eleventh amendment to the Action Plan of the 2005 - 2024 Integrated Resource Plan as it relates to the purchase agreement for portfolio energy credits from the City of Sparks.
View06-0401804/11/2006Application of Sierra Pacific Power Company for approval of the tenth amendment to the Action Plan of its 2005-2024 Integrated Resource Plan as it relates to Demand Side Management.
View06-0401204/12/2006Application of Nevada Power Company filed under Advice Letter No. 342 to revise Tariff No. 1-B to adjust the quarterly surcharge reflecting revised franchise tax rates.
View06-0400504/03/2006Joint application of Nevada Power Company ("NPC") and Sierra Pacific Power Company ("SPPC") for approval of the sale and purchase of portfolio energy credits from SPPC to NPC.
View06-0303803/31/2006Application of Nevada Power Company for approval of the eleventh amendment to the Action Plan of its 2003-2022 Integrated Resource Plan as it relates to Demand Side Management.
View06-0302803/21/2006Application of Sierra Pacific Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a new 345 kV transmission line and a 345 kV to 25 kV electric substation and four new 345 kV transmission structures and the removal of three existing 345 kV structures along the existing Alturas 345 kV transmission line in Washoe County, Nevada.
View06-0302303/15/2006Petition of MGM Mirage for a declaratory order or an advisory opinion that neither it nor Project CITYCENTER is a public utility and that providing electric power, cooling services, space or water heating services and surplus waste heat to MGM owned facilities, third party owned facilities or leased facilities are exempt from regulation by the Commission.
View06-0301803/10/2006Filing of Sierra Pacific Power Company for acceptance of its Action Plan Progress Report to its three-year Action Plan relative to its 2005-2024 Integrated Resource Plan.
View06-0301703/10/2006Application of Nevada Power Company for approval of the Distribution Only Service Agreement with the Las Vegas Valley Water District and the Colorado River Commission.
View06-0300403/10/2006Application of Silver Springs Mobile Home Park to withdraw $5,671.39 from the service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View06-0204002/28/2006Petition of Macquarie District Energy, Inc. for a declaratory order or an advisory opinion that neither it nor Northwind Aladdin, LLC is a public utility and that providing chilled water, heated water and emergency back-up electric power to a new condominium project as well as to the Aladdin Hotel and Casino and the Desert Passage shopping center fall outside the jurisdiction of the Commission.
View06-0203702/22/2006Notification from Jack Maliugani, former owner of Dayton Valley Mobile Home Park, that a check in the amount of $3,522.80 which was the balance in the service charge account was mailed to Staff Counsel to forward to the new owners for deposit.
View06-0203202/22/2006Application of White Pine Energy Associates, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct electrical generation facilities and ancillary facilities to be known as the White Pine Energy Station with a capacity of up to 1,600 MW as well as one 500 kV substation and interconnection facilities, one 500 kV transmission line traversing 35 miles, and two parallel 500 kV transmission spur lines traversing between 2.5 and 6 miles to be located in White Pine County, Nevada.
View06-0202002/03/2006Application of Lone Pine Mobile Home Park to withdraw $26,071.23 from the tenant service charge account established by the previous owners, close the account and use the monies to reimburse past tenants.
View06-0200902/06/2006Application of King's Row Trailer Park to withdraw $75,594.77 from its service charge account for reimbursement of expenses incurred to upgrade and repair the electrical system.
View06-0104101/31/2006Application of Sierra Pacific Power Company filed under Advice Letter No. 457-E to submit Schedule No. CSPP, Short-Term Rates, Cogeneration and Small Power Production, with no change in rates in accordance with NAC 704.8783 which requires electric utilities to file their avoided short-term cost rates for purchases from Qualifying Facilities.
View06-0104001/31/2006Application of Nevada Power Company filed under Advice Letter No. 341 to submit its Cogeneration and Small Power Production - Qualifying Facilities Schedule QF-Short Term, with no change in rates, in accordance with NAC 704.8783 which requires electric utilities to file their avoided short-term cost rates for purchases from Qualifying Facilities.
View06-0103501/25/2006Application of Nevada Power Company filed under Advice Letter No. 340 to revise Tariff No. 1-B to adjust the quarterly surcharge reflecting revised franchise tax rates.
View06-0102701/20/2006Application of Nevada Power Company for approval of the tenth amendment to the Action Plan of its 2003 and 2022 Integrated Resource Plan requesting approval of the acquisition of land and land rights for future construction of transmission expansion, and related accounting treatment.
View06-0101801/17/2006Application of Nevada Power Company for authority to issue secured or unsecured long-term debt securities in an aggregate amount not to exceed $200,000,000 through the period ending December 31, 2006.
View06-0101701/17/2006Application of Nevada Power Company to delay establishing a new temporary renewable energy development ("TRED") charge.
View06-0101601/17/2006Application of Nevada Power Company to establish a new DEAA5 rate to collect deferred energy costs and to reset the Base Tariff Energy Rate for collection of projected future energy costs.
View05-901709/12/2005Application of Nevada Power Company for approval of the Energy Supply Plan Update for year 2006 of the Action Plan of its 2003-2022 Integrated Resource Plan.
View05-901609/12/2005Application of Sierra Pacific Power Company for approval of the Energy Supply Plan Update for years 2006 and 2007 of the Action Plan of its 2005-2024 Integrated Resource Plan.
View05-901509/13/2005Application of Sierra Pacific Power Company filed under Advice Letter No. 451-E to revise the Interclass Rate Rebalancing Rate paid by Barrick Goldstrike for Distribution Only Service.
View05-900809/07/2005Application of Nevada Power Company filed under Advice Letter No. 333 to revise Tariff No. 1-B to modify Bills for Service Rule No. 5; Discontinuance, Restoration and Refusal of Service Rule No. 6; and Deposits Rule No. 13 to comply with the Consumer Bill of Rights regulations as amended in Docket Nos. 01-3015 and 05-3005.
View05-900709/07/2005Application of Sierra Pacific Power Company filed under Advice Letter No. 450-E to revise Electric Tariff No. 1 to modify Bills for Service Rule No. 5; Discontinuance, Restoration and Refusal of Service Rule No. 6; and Deposits Rule No. 13 to comply with the Consumer Bill of Rights regulations as amended in Docket Nos. 01-3015 and 05-3005.
View05-802008/15/2005Application of Nevada Power Company for approval of the ninth amendment to the Action Plan of its 2003 and 2022 Integrated Resource Plan requesting approval of its annual Demand Side Management Plan.
View05-801908/15/2005Application of Sierra Pacific Power Company for approval of the ninth amendment to the Action Plan of its 2005 and 2024 Integrated Resource Plan requesting approval of its annual Demand Side Management Plan.
View05-801708/16/2005Application of Silver Star Properties, LLC to withdraw $5,886.95 from the service charge account for the Sierra Vista Mobile Home Park for reimbursement of expenses incurred to repair and maintain the electrical system.
View05-801208/10/2005Application of King's Row Trailer Park to withdraw $5,354.69 from its service charge account for reimbursement of expenses incurred to repair the electrical system.
View05-800408/01/2005Application of Sierra Pacific Power Company for approval of the eighth amendment to the Action Plan of its 2005-2024 Integrated Resource Plan to approve construction of the Tracy Combined Cycle Project, its designation as a Critical Facility and the proposed incentive mechanism for ratemaking purposes.
View05-705407/25/2005Application of Sierra Pacific Power Company filed under Advice Letter No. 449-E to revise Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87, to adjust rates for long-term cogeneration and small power production energy and capacity rates.
View05-702807/19/2005Application of Town of Ione Company for authority to operate as a public utility providing electrical service in Ione, Nevada.
View05-700807/06/2005Application of Nevada Power Company filed under Advice Letter No. 332 to revise Tariff No. 1-B to adjust the quarterly surcharge reflecting revised franchise tax rates.
View05-700307/01/2005Application of Sierra Pacific Power Company for authority to update its electric Base Tariff Energy Rate to reflect anticipated fuel and purchased power costs.
View05-604006/29/2005Application of Nevada Power Company ("NPC") for authority to establish a regulatory asset account for retirement and decommissioning costs for Units 1, 2 and 3 of the Clark Generating Station; to record the costs of the interim power purchase agreement as fuel and purchased power costs; and to flow through its income statement certain incremental and decremental costs associated with NPC’s new Lenzie and Silverhawk generating plants, the retirement of Units 1, 2, and 3 of the Clark Generating Station, and the closure of the Mohave Generating Station.
View05-603906/29/2005Application of Nevada Power Company for authority to issue secured long-term debt securities in an aggregate amount not to exceed $210,000,000 through the period ending December 31, 2006.
View05-603806/29/2005Application of Nevada Power Company for approval of the eighth amendment to the Action Plan of its 2003-2022 Integrated Resource Plan to approve the acquisition of a 75 percent interest in the Silverhawk Power Plant; the related interim power purchase agreement; and cost recovery for the retirement and decommissioning of Units 1, 2 and 3 of the Clark Generating System.
View05-602806/17/2005Application of Sierra Pacific Power Company for approval of the seventh amendment to the Action Plan of its 2005-2024 Integrated Resource Plan to approve Amendment No. 1 to a previously-approved long-term energy contract for non-firm solar-powered electric energy and the associated renewable energy credits.
View05-602706/17/2005Application of Nevada Power Company for approval of the seventh amendment to the Action Plan of its 2003-2022 Integrated Resource Plan to approve Amendment No. 1 to a previously-approved long-term energy contract for non-firm solar-powered electric energy and the associated renewable energy credits.
View05-602606/17/2005Joint application of Nevada Power Company and Sierra Pacific Power Company for approval of the Amended and Restated Temporary Renewable Energy Development Trust Agreements.
View05-602006/15/2005Application of Sierra Pacific Power Company filed under Advice Letter No. 447-E to revise Tariff No. 1, Electric Line Extensions Rule No. 9, to adjust the rate used in the taxability of the line extension calculations.
View05-601906/15/2005Application of Nevada Power Company filed under Advice Letter No. 331 to revise Tariff No. 1-B, Electric Line Extensions Rule No. 9, to adjust the rate used in the taxability of the line extension calculations.
View05-601006/09/2005Application of Sierra Pacific Power Company and Nevada Power Company for approval of a payment processing agreement with a third party credit services company that charges customers a fee for payments of utility bills by credit card.
View05-600306/02/2005Application of Nevada Power Company for authority to reset the electric Base Tariff Energy Rate for collection of projected future energy costs.
View05-502905/26/2005Application of Lone Pine Mobile Home Park to withdraw $4,650.00 from its service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View05-501605/17/2005Application of Sierra Pacific Power Company for approval of the sixth amendment to the Action Plan of its 2005-2024 Integrated Resource Plan for the installation of renewable energy generation on company-owned buildings and to provide incentives for the installation of high-efficiency air conditioning for residential conservation.
View05-501005/12/2005Application of Sierra Pacific Power Company for approval of the fifth amendment to the Action Plan of its 2005-2024 Integrated Resource Plan and for approval of two long-term power purchase agreements for renewable energy and renewable energy credits.
View05-500205/02/2005Application of Nevada Power Company filed under Advice Letter No. 329 to revise Public Street Lighting and Traffic Control Service Schedule SL to correct the kilowatthour usage to show monthly usage rather than annual usage to match the usage shown on the tariff with the usage shown on the customers' bill.
View05-401504/18/2005Application of Nevada Power Company for approval of the sixth amendment to the Action Plan of its 2003-2022 Integrated Resource Plan to authorize long term power exchange.
View05-401404/18/2005Application of Nevada Power Company ("NPC") filed under Advice Letter No. 328 to implement Retail Power Exchange Schedule No. RPE to facilitate a retail power exchange transaction between NPC and a customer who is currently served or could be served by the Colorado River Commission pursuant to NRS 704.787.
View05-400804/08/2005Joint Petition of Nevada Power Company and Sierra Pacific Power Company for a declaratory order relating to the treatment of costs of undergrounding transmission lines pursuant to mandates issued by local governments.
View05-303203/28/2005Application of Charleston Trailer Park to withdraw $2,488.53 from its service charge account for reimbursement of expenses incurred to repair and maintain the electrical system and to close the account.
View05-302703/22/2005Notification from the Bureau of Consumer Protection ("BCP") of the agreement between BCP and Nevada Power Company regarding the El Paso Natural Gas Settlement and disbursement methodology.
View05-302203/21/2005Application of Nevada Power Company filed under Advice Letter No. 327 to revise Tariff No. 1-B to adjust the quarterly surcharge reflecting revised franchise tax rates.
View05-301603/10/2005Filing of Nevada Power Company for acceptance of its Action Plan Progress Report to its three-year Action Plan relative to its 2003-2022 Integrated Resource Plan.
View05-300203/01/2005Petition of Macquarie District Energy, Inc. for a declaratory order or in the alternative an advisory opinion that it is not a public utility and that its activities fall outside the jurisdiction of the Commission.
View05-203002/24/2005Incident report filed by the Staff of the Public Utilities Commission in response to notice pursuant to NRS 704.190 from Nevada Power Company of notification an employee's death occurring on 2/23/05 when the employee hit a slippery section of roadway and lost control of the company vehicle he was driving.
View05-1202812/16/2005Application of Sierra Pacific Power Company to delay establishing a new temporary renewable energy development ("TRED") charge.
View05-1201112/12/2005Application of Sierra Pacific Power Company filed under Advice Letter No. 456-E to revise Tariff No. 1, Electric Line Extensions Rule No. 9, to adjust the rate used in the taxability of the line extension calculations.
View05-1201012/12/2005Application of Nevada Power Company filed under Advice Letter No. 338 to revise Tariff No. 1-B, Electric Line Extensions Rule No. 9, to adjust the rate used in the taxability of the line extension calculations.
View05-1200812/08/2005Application of Sierra Pacific Power Company for approval of a long-term service agreement with Turquoise Ridge Joint Venture pursuant to its electric Large Transmission Service Schedule No. GS-4.
View05-1200112/01/2005Application of Sierra Pacific Power Company to establish a new DEAA5 rate to collect deferred energy costs and to reset the Base Tariff Energy Rate for collection of projected future energy costs.
View05-1102711/21/2005Application of Trailerdale Trailer Park to withdraw $4,857.31 from the service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View05-1102611/21/2005Petition of the Regulatory Operations Staff of the Commission to open an investigatory docket to determine whether the Commission's approval of the long-term power purchase agreement between Nevada Power Company and Las Vegas Cogeneration II LLC should be rescinded or any other action the Commission deems appropriate.
View05-1102311/17/2005Application of the Nevada Department of Corrections for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a wood fired biomass generation facility to be located at the Northern Nevada Correctional Center in Carson City, Nevada.
View05-1100511/03/2005Application of Nevada Power Company filed under Advice Letter No. 337 to revise Tariff No. 1-B to adjust the quarterly surcharge reflecting revised franchise tax rates.
View05-103901/25/2005Petition of the Regulatory Operations Staff for an Order to Show Cause why Hazel June Yancey on behalf of Wildes Manor Mobile Home Park should not be found in violation of NRS 704.940 and 704.960.
View05-102901/14/2005Application of Sierra Pacific Power Company for approval of proposed rates to recover the expenses of developing its Resource Plan, or in the alternative, approval to eliminate resource plan cost recovery pursuant to NAC 704.9485.
View05-102801/14/2005Application of Sierra Pacific Power Company to collect deferred energy expenses and to reset the Base Tariff Energy Rate to reflect anticipated future energy costs.
View05-100701/11/2005Application of Sierra Pacific Power Company filed under Advice Letter No. 444-E to submit Cogeneration and Small Power Production Short-Term Rates Schedule No. CSPP, with no change in rates, in accordance with NAC 704.8783 which requires each utility to file annually its short-term avoided costs for purchases from Qualifying Facilities.
View05-100601/11/2005Application of Nevada Power Company filed under Advice Letter No. 326 to submit Cogeneration and Small Power Production - Qualifying Facilities Schedule QF-Short Term, with no change in rates, in accordance with NAC 704.8783 which requires each utility to file annually its short-term avoided costs for purchases from Qualifying Facilities.
View05-100401/04/2005Application of Nevada Power Company for approval of the first amendment to the Distribution-Only Service Agreement entered into by Nevada Power Company, the Southern Nevada Water Authority and the Colorado River Commission.
View05-1003510/24/2005Application of Sierra Pacific Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct at the existing Tracy Station, a new 345 kV electric substation; a 345 kV transmission interconnection; and a 514 MW combined cycle generating unit to be located in Washoe County and Storey County, Nevada.
View05-1003010/24/2005Application of Sierra Pacific Power Company ("SPPC") for approval of an electric general service agreement with Fish Springs Ranch LLC ("Fish Springs") and methodologies to refund Fish Springs part of the construction costs for new transmission and distribution facilities once subsequent SPPC customers take service from those facilities.
View05-1002510/21/2005Application of Nevada Power Company for authority to issue secured or unsecured long-term debt securities in an aggregate amount not to exceed $1,780,000,000 through the period ending December 31, 2007.
View05-1002410/21/2005Application of Sierra Pacific Power Company for authority to issue secured or unsecured long-term debt securities in an aggregate amount not to exceed $1,360,000,000 through the period ending December 31, 2007.
View05-1001910/19/2005Application of Nevada Power Company filed under Advice Letter No. 335 to modify Net Metering Rider Schedule No. NMR to comply with the provisions enacted by Assembly Bill 236 of the 2005 State of Nevada Legislature.
View05-1001810/19/2005Application of Sierra Pacific Power Company filed under Advice Letter No. 454-E to modify Net Metering Rider Schedule No. NMR to comply with the provisions enacted by Assembly Bill 236 of the 2005 State of Nevada Legislature.
View05-1000410/03/2005Application of Sierra Pacific Power Company for approval of new and revised depreciation rates for electric operations based on its 2005 depreciation study.
View05-1000310/03/2005Application of Sierra Pacific Power Company for authority to increase its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View04-902109/23/2004Application of Nevada Power Company filed under Advice Letter No. 317 to revise Tariff No. 1-B to adjust the quarterly surcharge reflecting revised franchise tax rates.
View04-900809/08/2004Application of Newmont Nevada Energy Investment LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the TS Power Plant, an electric generation facility to be located in Eureka County, Nevada.
View04-900409/01/2004Application of Nevada Power Company for approval of its Energy Supply Plan for 2005 through 2007.
View04-802508/27/2004Application of Nevada Power Company filed under Advice Letter No. 316 to revise the Statement of Rates for Tariff No. 1-B to correct errors in charges for two rate classes within the Distribution Only Service.
View04-802208/23/2004Application of Nevada Power Company for approval of the third amendment to the Supply-Side Action Plan of its 2003 Electric Resource Plan.
View04-800408/04/2004Application of Sierra Pacific Power Company for approval of the first amendment to the Action Plan for its 2004 Electric Resource Plan and a long-term agreement for the purchase of electricity generated from a renewable resource and associated renewable energy credits.
View04-700907/08/2004Joint application of Nevada Power Company ("NPC") and Sierra Pacific Power Company ("SPPC") for approval of proposed methodology and standards for quantifying quality of service for NPC and SPPC.
View04-700407/07/2004Application of Sierra Pacific Power Company for approval of its 2005 to 2024 Integrated Resource Plan.
View04-603006/29/2004Application of Nevada Power Company for approval of the second amendment to the Supply-Side Action Plan of its 2003 Electric Resource Plan.
View04-602906/29/2004Application of Nevada Power Company for authority to issue secured long-term debt securities in an aggregate amount not to exceed $500,000,000 through the period ending December 31, 2005.
View04-601206/11/2004Application of Nevada Power Company filed under Advice Letter No. 315 to revise Tariff No. 1-B to adjust the quarterly surcharge reflecting revised franchise tax rates.
View04-601106/11/2004Application of Sierra Pacific Power Company filed under Advice Letter No. 438-E to revise its Electric Tariff No. 2, Schedule Nos. LCSPP86 and LCSPP87, to adjust rates for long-term cogeneration and small power production energy and capacity rates.
View04-601006/11/2004Application of Nevada Power Company filed under Advice Letter No. 314 to revise its Tariff No. 1-B, Electric Line Extensions Rule No. 9, to adjust the rate used in the taxability of the line extension calculations.
View04-600906/11/2004Application of Sierra Pacific Power Company filed under Advice Letter No. 437-E to revise its Tariff No. 1, Electric Line Extensions Rule No. 9, to adjust the rate used in the taxability of the line extension calculations.
View04-600706/09/2004Petition of the Regulatory Operations Staff for an Order to Show Cause why Cedar Lodge Mobile Home and R.V. Park should not be found in violation of NRS 704.940 and 704.960.
View04-502705/18/2004Application by Granite Fox Power, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a substation, converter and a 1.5 mile DC transmission line to connect the planned Granite Fox electrical generation site with the existing Pacific DC Intertie transmission line to be located in Washoe County, Nevada.
View04-501705/13/2004Application of Nevada Power Company filed under Advice Letter No. 312 to revise its Tariff 1-B, Schedule Large Residential Service and Schedule Trial Large Residential Service-Time-of-Use, to narrow the applicability of the rate schedules based upon average monthly usage.
View04-500605/05/2004Application of Nevada Power Company filed under Advice Letter No. 309-E to revise its Electric Tariff No. 1, Rule No. 15, to clarify provisions in the rule dealing with responsibility for net generation metering equipment when required by an applicable schedule.
View04-500505/05/2004Application of Sierra Pacific Power Company filed under Advice Letter No. 436-E to revise its Electric Tariff No. 1, Rule No. 15, to clarify provisions in the rule dealing with responsibility for net generation metering equipment when required by an applicable schedule.
View04-500305/05/2004Application of Nevada Power Company filed under Advice Letter No. 310 to revise its Electric Tariff 1-A to implement Prepaid Power, an optional program that allows the customer to prepay for electric service.
View04-500205/05/2004Application of Barrick Goldstrike Mines Inc. for authority under the provisions of the Utility Environmental Protection Act for a permit to construct an electrical generation facility to be known as the Western 102 Generating Station to be located in Storey County, Nevada.
View04-402604/23/2004Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a 500 kV transmission line from its Harry Allen 500 kV Switchyard to the Western Area Power Administration's Mead Substation to be located in Clark County, Nevada.
View04-401804/19/2004Application of Nevada Power Company filed under Advice Letter No. 307 of changes to Tariff No. 1-B to revise its Special Supplementary Tariff to adjust the quarterly surcharge reflecting revised franchise tax rates.
View04-303303/31/2004Application of Sierra Pacific Power Company filed under Advice Letter No. 435-E to revise Schedule No. CSPP, Short-Term Rates Cogeneration and Small Power Production, in accordance with NAC 704.8783(2) which requires each utility to file annually its short-term avoided costs for purchases from Qualifying Facilities.
View04-303203/31/2004Application of Nevada Power Company filed under Advice Letter No. 306 to revise Schedule QF-Short Term, Cogeneration and Small Power Production - Qualifying Facilities, in accordance with NAC 704.8783(2) which requires each utility to file annually its short-term avoided costs for purchases from Qualifying Facilities.
View04-302003/16/2004Application of Nevada Power Company for approval of a special contract for the provision of distribution-only service to the Southern Nevada Water Authority.
View04-203802/27/2004Application of Nevada Power Company ("NPC") filed under Advice Letter No. 305 to revise Incremental Price Tariff Schedule No. IP to accommodate eligible customers who pursuant to NRS 704.787 have contracted for service under Schedule DOS but now wish to return to full service by NPC.
View04-201802/11/2004Petition of Sierra Pacific Power Company for a waiver of NAC 704.8783(2) requiring annual filing of short-term avoided cost rates for purchases of electricity from qualifying facilities.
View04-201702/11/2004Petition of Nevada Power Company for a waiver of NAC 704.8783(2) requiring annual filing of short-term avoided cost rates for purchases of electricity from qualifying facilities.
View04-200602/05/2004Third application of Barrick Goldstrike Mines Inc. to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View04-1204312/29/2004Application of Sierra Pacific Power Company filed under Advice Letter No. 442-E-R to revise Electric Tariff No. 1 to implement New Generation Tariff Schedule No. GS-4-NG and to modify the existing Incremental Price Tariff Schedule No. IP.
View04-1204112/27/2004Application of Green Acres Trailer Park to withdraw $1,274.45 from its electric service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View04-1204012/27/2004Application of Nevada Power Company ("NPC") filed under Advice Letter No. 325 to revise Electric Line Extensions Rule No. 9 to allow NPC to perform work on behalf of and at the expense of government agencies when requested by the agency.
View04-1203912/27/2004Application of Sierra Pacific Power Company ("SPP") filed under Advice Letter No. 443-E to revise Electric Line Extensions Rule No. 9 to allow SPP to perform work on behalf of and at the expense of government agencies when requested by the agency.
View04-1203812/23/2004Petition of Sierra Pacific Power Company for approval of a proposed retail service contract with Newmont USA, Ltd., d/b/a Newmont Mining Corporation.
View04-1203712/23/2004Application of Sierra Pacific Power Company for approval of the fourth amendment to the Action Plan of its 2004 - 2023 Integrated Resource Plan to include a proposed transaction with Nevada Energy Investment LLC.
View04-1203612/23/2004Application of Newmont Mining Corporation to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View04-1202312/17/2004Application of Nevada Power Company ("NPC") for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a 500 kV switchyard and associated facilities to connect the Lenzie Generating Station to NPC's transmission system located in Clark County, Nevada.
View04-1201712/14/2004Application of Sierra Pacific Power Company filed under Advice Letter No. 441-E to revise Tariff No. 1, Electric Line Extensions Rule No. 9, to adjust the rate used in the taxability of the line extension calculations.
View04-1201612/14/2004Application of Nevada Power Company filed under Advice Letter No. 324 to revise Tariff No. 1-B, Electric Line Extensions Rule No. 9, to adjust the rate used in the taxability of the line extension calculations.
View04-1200512/06/2004Petition of the Regulatory Operations Staff ("Staff") for approval of a Stipulation between Staff and Skyvue Mobile Home Park ("Skyvue") regarding the tenant service charge account and utility billing practices of Skyvue.
View04-1200412/03/2004Application of Nevada Power Company filed under Advice Letter No. 323 to revise Tariff No. 1-B to adjust the quarterly surcharge reflecting revised franchise tax rates.
View04-1104611/22/2004Application of Nevada Power Company filed under Advice Letter No. 320 to revise Bills for Service Rule No. 5 to allow Nevada Power Company and Sierra Pacific Power Company to have consistent language between the two companies' rules.
View04-1104511/22/2004Application of Sierra Pacific Power Company filed under Advice Letter No. 440-E to revise Bills for Service Rule No. 5 to allow Nevada Power Company and Sierra Pacific Power Company to have consistent language between the two companies' rules.
View04-1104011/22/2004Application of Sierra Pacific Power Company for approval of the third amendment to the Action Plan of its 2004-2023 Integrated Resource Plan.
View04-1103611/19/2004Application of Sierra Pacific Power Company for approval of the second amendment to the Action Plan of its 2004 through 2023 Integrated Resource Plan.
View04-1103311/18/2004Application of Nevada Power Company for approval of the fifth amendment to the Action Plan of its 2003-2022 Integrated Resource Plan.
View04-1102911/15/2004Application of Nevada Power Company for approval of proposed rates to recover the expenses of developing its Resource Plan.
View04-1102811/15/2004Application of Nevada Power Company to collect deferred energy expenses and to reset the Base Tariff Energy Rate for collection of projected future energy costs.
View04-1100911/02/2004Application of Nevada Power Company for approval of the fourth amendment to the Action Plan of its 2003-2022 Integrated Resource Plan and the Demand Side Management Plan Update.
View04-102701/30/2004Application of Nevada Power Company filed under Advice Letter No. 304 to revise its Special Supplementary Tariff to adjust the quarterly surcharge reflecting revised franchise tax rates.
View04-101401/26/2004Application of Nevada Power Company for authority to issue secured long-term debt securities in an aggregate amount not to exceed $230,000,000 through the period ending December 31, 2004.
View04-100701/14/2004Application of Sierra Pacific Power Company to recover the expenses of developing its Resource Plan pursuant to NAC 704.9485.
View04-100601/14/2004Deferred energy filing of Sierra Pacific Power Company and application to modify fuel and purchased power rates.
View04-1002410/20/2004Petition of Nevada Power Company for authority to delay implementation of the DEAA rate changes previously approved in Docket No. 03-11019.
View04-1001510/13/2004Application of Nevada Power Company ("NPC") filed under Advice Letter No. 318 to revise Tariff No. 1-B to modify Rule No. 9 Electric Line Extensions to allow NPC to perform certain work on behalf of and at the expense of government agencies, if the work serves the public good.
View04-1001410/13/2004Application of Sierra Pacific Power Company ("Sierra") filed under Advice Letter No. 439-E to revise Electric Tariff No. 1 to modify Rule No. 9 Electric Line Extensions to allow Sierra to perform certain work on behalf of and at the expense of government agencies, if the work serves the public good.
View04-1001010/08/2004Application of Nevada Power Company filed under Advice Letter No. 319 to revise Tariff No. 1-B to correct the Distribution Only Service rates contained in the Statement of Rates to match the rates contained in its previously approved Statement O.
View04-100101/06/2004Application of Nevada Power Company for approval of the first amendment to the Supply-Side Action Plan of its 2003 Electric Resource Plan.
View03-902709/26/2003Application of Nevada Power Company ("NPC") for authority to issue secured long-term debt in an aggregate amount not to exceed $235,000,000 through the period ending October 30, 2005, to support a stay of the judgment against NPC by the U.S. Bankruptcy Court of the Southern District of New York.
View03-902609/26/2003Application of Sierra Pacific Power Company ("SPP") for authority to issue secured long-term debt in an aggregate amount not to exceed $103,000,000 through the period ending October 30, 2005, to support a stay of the judgment against SPP by the U.S. Bankruptcy Court of the Southern District of New York.
View03-902309/19/2003Filing of Nevada Power Company ("NPC") to revise various tariff schedules to add the collection of revenues estimated to reimburse NPC for the modified business tax pursuant to SB 8.
View03-902109/19/2003Filing of Sierra Pacific Power Company ("SPP") to revise various tariff schedules to add the collection of revenues estimated to reimburse SPP for the modified business tax pursuant to SB 8.
View03-900809/08/2003Application of Nevada Power Company filed under Advice Letter No. 298 to revise its Special Supplementary Tariff of adjusted quarterly surcharge reflecting revised franchise tax rates.
View03-900309/02/2003Application of Silver Star Properties LLC to withdraw $19,590.00 from the service charge account for the Prater Way Mobile Park for reimbursement of expenses incurred to repair and upgrade the electrical system.
View03-802608/15/2003Application of Nevada Power Company ("NPC") filed under Advice Letter No. 297 to modify its Special Supplementary Tariff to add the collection of revenues estimated to reimburse NPC for the modified business tax pursuant to SB 8.
View03-802408/15/2003Application of Sierra Pacific Power Company ("SPP") filed under Advice Letter No. 428-E to modify its Tax Adjustment Rider Schedule TAR to add the collection of revenues estimated to reimburse SPP for the modified business tax pursuant to SB 8.
View03-704507/30/2003Application of Yerington Mobile Village to withdraw $8,788.50 from its service charge account for reimbursement of expenses incurred to repair and upgrade the electrical system.
View03-704307/29/2003Application of Nevada Power Company ("NPC") filed under Advice Letter No. 296 to revise its Incremental Price Tariff Schedule No. IP to set forth the policies used by NPC to provide service to eligible customers under NRS 704B pursuant to the Compliance Order issued in Docket Nos. 02-11009, 02-11010, 02-11011 and 02-11012.
View03-704207/29/2003Application of Sierra Pacific Power Company ("Sierra") filed under Advice Letter No. 427-E to revise its Incremental Price Tariff Schedule No. IP to set forth the policies used by Sierra to provide service to eligible customers under NRS 704B pursuant to the Compliance Order issued in Docket Nos. 02-11009, 02-11010, 02-11011 and 02-11012.
View03-702507/21/2003Application of Venetian Casino Resort, LLC and its affiliated and related entities, Grand Canal Shops II, LLC and Interface Group-Nevada, Inc., to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View03-701007/08/2003Application of Fairview Mobile Manor to withdraw $8,635.50 from its service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View03-700407/01/2003Application of Nevada Power Company for approval of its 2003-2022 Electric Resource Plan.
View03-605606/27/2003Application of Nevada Power Company to amend its Amended Demand-Side Plan of Action for its Refiled 2000 Resource Plan.
View03-604106/20/2003Application of Nevada Power Company filed under Advice Letter No. 293 to revise its Electric Tariff No. 1-B regarding the addition and modification of tariffs governing the provision of service to customers with on-site generation.
View03-604006/20/2003Application of Sierra Pacific Power Company filed under Advice Letter No. 424-E to revise its Electric Tariff No. 1 regarding the addition and modification of tariffs governing the provision of service to customers with on-site generation.
View03-602706/17/2003Filing by Nevada Power Company of revisions to its Special Supplementary Tariff of adjusted quarterly surcharge reflecting revised franchise tax rates. (Advice Letter No. 295)
View03-602606/17/2003Filing by Sierra Pacific Power Company of tariff revisions to Schedule Nos. LCSPP86 and LCSPP87 of long-term energy and capacity rates in compliance with the Orders issued in Docket Nos. 85-1005, 87-126 and 98-7040. (Advice Letter No 425-E)
View03-602406/17/2003Application of Sierra Pacific Power Company filed under Advice Letter No. 426-E of revisions to Rule No. 9, Electric Line Extensions, to adjust the tax liability factor.
View03-602306/17/2003Filing of Nevada Power Company of revisions to Rule No 9, Electric Line Extensions, to adjust the gross-up rate used in the taxability of line extension calculations. (Advice Letter No. 294)
View03-602206/13/2003Application of Sierra Pacific Power Company to amend its Amended Demand Side Plan of Action for its 2001 Electric Resource Plan.
View03-601006/09/2003Petition of Sierra Pacific Power Company and Nevada Power Company for an Order approving the addition and modification of certain tariffs governing the provision of service to customers with on-site generation.
View03-503805/27/2003Application from Reno Cascade Mobile Home Park to withdraw $17,732.07 from its electric service charge account and $6,542.06 from its gas service charge account for reimbursement of expenses incurred to repair and maintain the gas and electric systems.
View03-503305/22/2003Application of Nevada Power Company for authority to issue secured long-term debt in an aggregate amount not to exceed $350,000,000 through the period ending October 31, 2003.
View03-403504/28/2003Petition of Rouse Fashion Show Management, LLC ("Rouse") and APS Energy Services ("APSES") for an Advisory Opinion whether APSES may provide electrical service to Rouse pursuant to the provisions of NRS 704B and NAC 704B.
View03-401004/10/2003Application of Sierra Pacific Power Company ("SPP"), filed under Advice Letter No. 423-E to revise Rule No. 18, Supply to Separate Premises and Resale, to clarify the provisions related to the resale of electricity by customers of SPP.
View03-400904/09/2003Application of Nevada Power Company ("NPC"), filed under Advice Letter No. 292 to revise Rule No. 18, Supply to Separate Premises and Resale, to clarify the provisions related to the resale of electricity by customers of NPC.
View03-400504/03/2003Petition of Submetering Systems, Inc. requesting the Commission open an investigation regarding Rule 18(c) of the Tariffs for Sierra Pacific Power Company and Nevada Power Company.
View03-301503/18/2003Informational filing by Sierra Pacific Power Company of an Energy Supply Plan as part of its 2001 Resource Plan.
View03-300703/10/2003Application filed by Lincoln County Power District No. 1 for Farmers Mutual Power Association to voluntarily discontinue electrical service conducted under certificate CPC 857.
View03-300503/03/2003Fourth application of Rouse Fashion Show Management, LLC to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
View03-300203/03/2003Application of The Palms Casino Resort to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
View03-203102/20/2003Filing by Sierra Pacific Power Company of revisions to its Rule Nos. 1 and 16 of its Electric Tariff No. 1 to include additional, and the modification of existing, terms and definitions to effectuate the provisions of revised Rule No. 9 pursuant to the Order issued in Docket No. 02-8038. (Advice Letter No. 422-E)
View03-200602/04/2003Filing by Sierra Pacific Power Company of revisions to its Schedule No. CSPP, Short-Term Rates Cogeneration and Small Power Production, to comply with the Order issued in Docket No. 02-7025 and in accordance with NAC 704.8783(2) which requires each utility to file annually its short-term avoided cost rates for purchases of electricity from qualifying facilities. (Advice Letter No. 421-E)
View03-1203212/30/2003Application of Green Acres Trailer Park to withdraw $2,941.16 from its service fee account for reimbursement of expenses incurred to maintain the electrical system.
View03-1203012/23/2003Application of Sierra Pacific Power Company for authority to issue secured long-term debt securities in an aggregate amount not to exceed $230,000,000 through the period ending December 31, 2004.
View03-1202112/15/2003Application of Sierra Pacific Power Company filed under Advice Letter No. 432-E to revise Rule No. 9, Electric Line Extensions, to adjust the tax liability factor.
View03-1202012/15/2003Application of Nevada Power Company filed under Advice Letter No. 303 to revise Rule No. 9, Electric Line Extensions, to adjust the gross-up rate used in the taxability of line extension calculations.
View03-1201812/15/2003Application of Sierra Pacific Power Company for approval of a special contract for the provision of firm standby service to Naniwa Energy, LLC.
View03-1200212/01/2003Application of Sierra Pacific Power Company for authority to increase its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View03-1102611/24/2003Petition of Nevada Power Company ("NPC") and Sierra Pacific Power Company ("SPP") for a Declaratory Order regarding the impact of the Judgment and Order Granting Motion for Stay of Enforcement of Judgment in Enron's Chapter XI Bankruptcy Proceeding on NPC's and SPP's ability to seek recovery of payments through the deferred energy accounting adjustment process.
View03-1102011/17/2003Application of Nevada Power Company to recover the expenses of developing its Resource Plan pursuant to NAC 704.9485.
View03-1101911/17/2003Deferred energy filing of Nevada Power Company and application to change fuel and purchased power rates.
View03-1100911/05/2003Filing by Sierra Pacific Power Company to correct errors and omissions in the tariff previously filed for the Modified Business Tax, Docket No. 03-9021.
View03-103801/31/2003Filing by Nevada Power Company of revisions to its Schedule No. QF, Cogeneration and Small Power Production - Qualifying Facilities, to comply with the Order issued in Docket No. 02-7026 and in accordance with NAC 704.8783(2) which requires each utility to file annually its short-term avoided cost rates for purchases of electricity from qualifying facilities. (Advice Letter No. 291)
View03-103701/31/2003Informational filing of Nevada Power Company of an Energy Supply Plan as part of its Refiled 2000 Resource Plan.
View03-102601/24/2003Application of Nevada Power Company to amend the Supply-Side Action Plan of its Refiled 2000 Electric Resource Plan and for approval of individual Confirmation Agreements for three long-term purchase power contracts.
View03-102401/23/2003Filing by Nevada Power Company of revisions to Rule No. 1, Definitions, and Rule No. 24, Temporary Service, to include additional, and the modification of existing, terms and definitions to effectuate the provisions of revised Rule No. 9 pursuant to the Stipulation approved in Docket No. 02-7045. (Advice Letter No. 290)
View03-101501/14/2003Application of Sierra Pacific Power Company to recover the expenses of developing its Resource Plan pursuant to NAC 704.9485.
View03-101401/14/2003Deferred energy filing of Sierra Pacific Power Company and application to modify fuel and purchased power rates.
View03-1004510/30/2003Formal Complaint. Harrah's Operating Company, Inc. and Rio Properties, Inc., d/b/a Rio All Suites Hotel & Casino, vs. Sierra Pacific Resources, Sierra Pacific Power Company and Nevada Power Company for resolution of dispute regarding interconnection and operating agreement.
View03-100401/07/2003Petition of Nevada Power Company for approval of a special contract for the provision of distribution back-up service to the New York-New York Hotel and Casino, LLC.
View03-1002310/09/2003Application of Nevada Power Company for authority to issue secured or unsecured short-term debt securities in an aggregate amount not to exceed $250,000,000 through the period ending December 31, 2005.
View03-1002210/09/2003Application of Sierra Pacific Power Company for authority to issue secured or unsecured short-term debt securities in an aggregate amount not to exceed $250,000,000 through the period ending December 31, 2005.
View03-1000210/01/2003Application of Nevada Power Company for approval of new and revised depreciation and amortization rates.
View03-1000110/01/2003Application of Nevada Power Company for authority to increase its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View02-901109/10/2002Application of Nevada Power Company for approval of its Amended Supply-Side Plan to its Refiled 2000 Electric Resource Plan.
View02-900209/04/2002Filing of Nevada Power Company of revisions to its Special Supplementary Tariff of adjusted quarterly surcharge reflecting revised franchise tax rates. (Advice Letter No. 281)
View02-804008/29/2002Application of Silver Springs Mobile Home Park to withdraw $1,215.00 from its electric service account for reimbursement of expenses incurred to upgrade from 100 amp to 200 amp service.
View02-803808/27/2002Application of Sierra Pacific Power Company for approval of changes to its Line Extension Rule, Rule No. 9, in compliance with the Order issued in Docket No. 01-11030.
View02-802308/16/2002Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a new 230 kV transmission line in Clark County, Nevada that will start at its existing Mead-Faulkner line and will terminate at the new Greenway Substation to be constructed in the City of Henderson.
View02-800908/08/2002Petition of Submetering Systems, Inc. for an Advisory Opinion or Declaratory Order that its submetering business is not subject to the jurisdiction of the Public Utilities Commission.
View02-705007/31/2002Staff investigation of the tenant service charge account of Mactan Holdings, LLC.
View02-704507/29/2002Application of Nevada Power Company for approval of changes to its Line Extension Rule, Rule No. 9, in compliance with the Order issued in Docket No. 01-10001.
View02-702607/17/2002Filing of Nevada Power Company of revisions to its Schedule QF, Cogeneration and Small Power Production - Qualifying Facilities, in accordance with NAC 704.715(2) which requires each utility to file annually its short-term avoided costs for its electric system. (Advice Letter No. 279)
View02-702507/17/2002Filing of Sierra Pacific Power Company of revisions to its Schedule No. CSPP, Short-Term Rates Cogeneration and Small Power Production, in accordance with NAC 704.715(2) which requires each utility to file annually its short-term avoided costs for its electric system. (Advice Letter No. 415-E)
View02-700207/01/2002Petition of Nevada Power Company for review and approval of its records management policy for the fuel and power procurement function pursuant to the Order issued in Docket No. 01-11029.
View02-604506/27/2002Filing of Sierra Pacific Power Company, of changes in rates within its Gas Tariff Schedule No. INGR pursuant to NAC 704.522 and NAC 704.526.
View02-604106/24/2002Petition of Kerr-McGee Chemical, LLC (KMG) for a Declaratory Order from the Commission that the Colorado River Commission can continue to sell electricity and provide electric transmission and distribution service to KMG's chemical manufacturing facility in Henderson, Nevada after a third party purchases the facility, without being subject to the Commission's jurisdiction.
View02-602906/14/2002Filing by Sierra Pacific Power Company of tariff revisions to Schedule Nos. LCSPP86 and LCSPP87 of long-term energy and capacity rates in compliance with the Orders issued in Docket Nos. 85-1005, 87-126 and 98-7040. (Advice Letter No 414-E)
View02-601606/11/2002Filing of Sierra Pacific Power Company of revisions to Rule No. 9, Electric Line Extensions, to adjust the tax liability factor. (Advice Letter 413-E)
View02-601406/11/2002Filing of Nevada Power Company of revisions to Rule No 9, Line Extensions, to adjust the gross-up rate used in the taxability of line extension calculations. (Advice Letter No. 277)
View02-601306/11/2002Filing by Nevada Power Company of adjusted quarterly surcharge reflecting revised franchise tax rates. (Advice letter No. 278)
View02-600706/06/2002Application of Mactan Holdings, LLC to withdraw $1,503.12 from its utility reserve account for reimbursement of expenses for the repair of the electrical system.
View02-505105/22/2002Petition of Nevada Power Company and Sierra Pacific Power Company for an Order by the Commission establishing a state policy with respect to the allocation of transmission rights and resolving issues integral to the implementation of AB 661.
View02-504405/22/2002Filing by Nevada Power Company ("NPC") of revisions to its Electric Tariff No. 1-B, Rule 2, Description of Service, to explicitly state the policy to be used in cases where NPC has installed primary metering for a secondary service. (Advice Letter No. 276)
View02-504305/22/2002Staff investigation of the electric service charge account for Sierra View Mobile Home Park for the period from 1996 through 2001.
View02-503505/15/2002Application of Park Place Entertainment to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
View02-501205/02/2002Petition of Advanced Thermal Systems, Inc. requesting the Commission open a docket for the establishment of a long-term avoided cost rate for Sierra Pacific Power Company.
View02-500705/02/2002Second application of MGM Mirage to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
View02-500605/02/2002Second application of Gordon Gaming Corp., d/b/a Sahara Hotel and Casino, to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
View02-500505/02/2002Second application of Station Casinos, Inc. to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
View02-500405/02/2002Second application of Coast Hotels and Casinos, Inc. to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
View02-500305/02/2002Second application of Rouse Fashion Show Management, LLC to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
View02-403704/26/2002Application of Nevada Power Company for an Order authorizing the issuance of secured long-term debt in an aggregate amount not to exceed $450,000,000 for the period ending December 31, 2003.
View02-403304/17/2002Application of Mactan Holdings, LLC to withdraw $7,156.71 from its utility reserve account for reimbursement of expenses for the repair of the electrical system and to withdraw the remainder of the account to recover expenses associated with the closing of the mobile home park.
View02-403004/24/2002Petition of Southern Nevada Water Authority for an Order rejecting Advice Letter No. 268-R(2) filed by Nevada Power Company ("NPC") in Docket Nos. 01-10001 and 01-10002 and to require NPC to refile tariffs and to refund any overcharge billed to water pumping customers.
View02-402604/19/2002Petition of MGM Mirage for an Order rejecting Advice Letter No. 268-R(2) filed by Nevada Power Company ("NPC") in Docket No. 01-10001 and to require NPC to amend and correct its tariffs.
View02-402404/15/2002Application of Nevada Power Company to amend the Supply-Side Action Plan of its Refiled 2000-2019 Resource Plan and for approval of a purchase power agreement with Reliant Energy Services, Inc.
View02-401104/08/2002Application of Nevada Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a new 500 kV transmission line from the Harry Allen 500 kV Switchyard to the Northwest Substation to be located in Clark County, Nevada.
View02-304503/29/2002Second application of Barrick Goldstrike Mines Inc. to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
View02-304403/27/2002Compliance filing by Nevada Power Company of its Status Report on Distribution Automation pursuant to the Order issued in Dockets 00-5002, 00-5031 and 00-6060.
View02-303403/22/2002Application of MGM Mirage to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
View02-302203/14/2002Filing by Nevada Power Company ("NPC") of a new rate schedule addition to its Electric Tariff No. 1-B to re-introduce a residential program that would allow NPC to cycle off customer air conditioning units during summer peaking periods and to provide a monetary incentive for customers to sign-up for the program. (Advice Letter No. 275)
View02-301703/01/2002Application of Sierra Pacific Power Company to amend the Demand Side Plan of its 2001-2020 Electric Resource Plan.
View02-301403/12/2002Application of Sierra Pacific Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct a 345 kV electric transmission line to provide a new connection between the existing Falcon and Gonder substations in north central Nevada to be located in Eureka and White Pine counties.
View02-301003/04/2002Filing by Nevada Power Company of revisions to its Electric Tariff No. 1-B, Rule 5, Bills for Service, to state the convention used to correct errors in billings for service. (Advice Letter No. 274)
View02-300903/04/2002Application of Gordon Gaming Corp., d/b/a Sahara Hotel and Casino, to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
View02-300703/01/2002Application of Station Casinos, Inc. to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
View02-300603/01/2002Application of Coast Hotels and Casinos, Inc. to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
View02-300503/01/2002Application of Rouse Fashion Show Management, LLC to purchase energy, capacity and/or ancillary services from a provider of new electric resources.
View02-300103/01/2002Application of Nevada Power Company to amend the Demand Side Plan of its Refiled 2000-2019 Resource Plan.
View02-204002/28/2002Filing by Nevada Power Company ("NPC") of Status Report on the three-year action plan for NPC's Refiled 2000 Resource Plan pursuant to NAC 704.9353
View02-203902/27/2002Application of Nevada Power Company to amend the Supply-Side Action Plan of its Refiled 2000-2019 Resource Plan and for approval of a purchase power agreement with MNS Wind Company LLC for renewable energy.
View02-202502/20/2002Filing by Nevada Power Company of revisions to its Special Supplementary Tariff of adjusted quarterly surchar