Active Renewable Energy Dockets           Completed Renewable Energy Dockets
 Dkt No.Date FiledDescription
View14-0400204/01/2014Annual Report of Shell Energy North America (US), L.P. on compliance with the Portfolio Standard for Renewable Energy for Compliance Year 2013.
View14-0400104/01/2014Annual Report of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy on compliance with the Portfolio Standard for Renewable Energy for Compliance Year 2013.
View14-0302403/28/2014Petition of Black Rock Solar, Inc. on behalf of Western Nevada College (“WNC”) requesting an order approving a 41 day extension to construct a solar energy system at WNC pursuant to the Solar Energy Systems Incentive Program.
View14-0300403/07/2014Petition of Black Rock Solar, Inc. on behalf of High Desert Montessori School (“HDMS”) requesting an order approving a 55 day extension to construct a solar energy system at HDMS pursuant to the Solar Energy Systems Incentive Program.
View14-0200902/10/2014Petition of State of Nevada Public Works Division on behalf of Lovelock Correctional Center (“LCC”) requesting a deviation from Sierra Pacific Power Company d/b/a NV Energy’s 2013 Annual Plan for the Solar Energy Systems Incentive Program Handbook so that LCC may utilize and combine seven rebates totaling up to 700 kilowatts (“kW”), and install either a 500 kW or 700 kW solar energy system at LCC rather than installing seven individual systems of 100 kW.
View14-0200402/04/2014Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of annual plans for the Solar Energy Systems Incentive Program, the Wind Energy Systems Demonstration Program, and the Waterpower Energy Systems Demonstration Program for Program Year 2014-2015.
View13-1203312/24/2013Petition of Service 1st Energy Solutions, LLC on behalf of North West Health Careers College (“NWHCC”) requesting an order approving a 90 day extension to construct a solar energy system at NWHCC pursuant to the Solar Energy Systems Incentive Program.
View13-1102711/22/2013Notice by Mesa Solar Energy, LLC of an application to a federal agency for a permit to construct the Lago Seco Solar Project consisting of up to a 120 MW AC solar photovoltaic generation facility, approximately 1 mile of aboveground 230 kV transmission line, and associated facilities to be located in Clark County, Nevada.
View13-0501905/13/2013Application of Southern California Edison Company, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Primm Substation consisting of a 220 kV substation, approximately 1,500 feet of transmission line, and associated facilities to interconnect Silver State Solar Power South’s 250 MW solar project to the existing Eldorado-Ivanpah No. 2 220 kV transmission line to be located approximately 3 miles northeast of Primm in Clark County, Nevada.
View13-0500305/01/2013Application of Mesa Solar Energy, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the California Ridge Solar Project consisting of up to a 200 MW AC solar photovoltaic generation facility, approximately 3 to 4 miles of aboveground 230 kV transmission line, and associated facilities to be located in Clark County, Nevada.
View13-0500205/01/2013Application of Mesa Solar Energy, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Meadow Valley Solar Project consisting of up to a 200 MW AC solar photovoltaic generation facility, approximately 3 miles of aboveground 230 kV transmission line, and associated facilities to be located in Clark County, Nevada.
View13-0500105/01/2013Application of Mesa Solar Energy, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Mesa Solar Energy Project consisting of up to a 200 MW AC solar photovoltaic generation facility, approximately 13 miles of aboveground 230 kV transmission line, and associated facilities to be located in Clark County, Nevada.
View13-0304104/03/2013Petition of State of Nevada Public Works Division on behalf of Desert Research Institute requesting a deviation from NAC 701B.160(2)(c) to allow a 58 day extension to provide the executed construction contract.
View13-0304004/03/2013Petition of State of Nevada Public Works Division on behalf of Jean Conservation Camp requesting a deviation from NAC 701B.160(2)(c) to allow a 45 day extension to provide the executed construction contract.
View13-0303904/03/2013Petition of State of Nevada Public Works Division on behalf of Desert Research Institute requesting a deviation from NAC 701B.160(2)(c) to allow a 51 day extension to provide the executed construction contract.
View13-0302603/25/2013Application of Tribal Solar, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct approximately 15 or 3 miles of 230 kV transmission line to connect a 310 MW photovoltaic solar generating facility located on the Fort Mojave Indian Reservation in California and Arizona to the Mohave Generating Station Substation located near Laughlin in Clark County, Nevada.
View12-1203212/26/2012Application of Pahrump Valley Solar LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Pahrump Valley Solar Project consisting of a 90 MW photovoltaic solar plant, a 135 MW concentrating solar power tower plant, 230 kV transmission line, and associated facilities to be located near Pahrump in Nye County, Nevada.
View12-1103711/28/2012Application of Pacific Solar Investments, Inc., under the provisions of the Utility Environmental Protection Act, for a permit to construct the Cactus Springs Solar Project consisting of a 150 MW photovoltaic solar-powered electric generating facility, 230 kV transmission line, and associated facilities to be located in Nye and Clark Counties, Nevada.
View12-1001810/17/2012Application of Copper Rays Solar, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Copper Rays Solar facility consisting of a 180 MW photovoltaic solar-powered electric generating facility, approximately 2.6 miles of 230 kV transmission line, and associated facilities to be located near Pahrump in Nye County, Nevada.
View12-0900609/12/2012Application of Crescent Peak Renewables, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Crescent Peak Wind Project, a 500 MW wind-powered electric generating facility consisting of up to 220 wind turbine generators, a 115 kV to 230 kV transmission line, and associated facilities to be located near Searchlight in Clark County, Nevada.
View12-0702107/26/2012Application of KOWEPO America LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Townsite Solar Project consisting of a 180 MW photovoltaic solar-powered electric generating facility, 230 kV or 500 kV transmission line, and associated facilities to be located in Boulder City, Clark County, Nevada.
View12-0503705/31/2012Amended Application of Boulder Solar Power, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Boulder Solar Power Project consisting of a 300 MW alternating current solar-powered electric generating facility, 500 kV transmission line, and associated facilities to be located approximately 20 miles south of Las Vegas in Clark County, Nevada on approximately 1,540 acres of land within the city limits of Boulder City, Nevada and approximately 76 acres of federal lands.
View12-0401304/18/2012Amended application of Techren Solar, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Techren Boulder City Solar Project consisting of a 300 MW photovoltaic solar-powered electric generating facility, a substation with 34.5 kV to 230 kV step-up transformers, approximately 4 miles of 230 kV transmission line, and associated facilities to be located in Boulder City, Clark County, Nevada.
View12-0101801/20/2012Amended Application of TGP Dixie Development Company, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the New York Canyon Geothermal Development and Interconnection Project consisting of a 70 MW geothermal power plant, approximately 24 miles of 230 kV transmission line, and associated facilities to be located in Buena Vista Valley in Pershing County, Nevada.
View11-0901009/14/2011Application of Silver State Solar Power South, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Silver State Solar Power South Project consisting of a 250 MW photovoltaic solar-powered electric generating facility, a one-mile 220 kV transmission line, two substations, and associated facilities to be located approximately 40 miles southwest of Las Vegas in Clark County, Nevada.
View11-0702908/02/2011Application of Gradient Resources Inc., under the provisions of the Utility Environmental Protection Act, for a permit to construct Phase II of the Patua Geothermal Project consisting of a 60 MW binary-cycle geothermal power plant and associated facilities to be located approximately 10 miles east of Fernley in Churchill and Lyon counties, Nevada.
View11-0601406/27/2011Application of TGP Dixie Development Company, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the TGP Coyote Canyon Geothermal Project consisting of a 70 MW geothermal power plant, a 0.4 mile long 230 kV transmission line, and associated facilities to be located in Dixie Valley in Churchill County, Nevada.
View10-0501805/20/2010Application of NextLight Renewable Power, LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Boulder City Solar Project which consists of a 150 MW solar photovoltaic generating facility and approximately 2.5 miles of 230 kV transmission line to be located in Boulder City, Clark County, Nevada.
View10-0201602/11/2010Application of Nevada Power Company d/b/a NV Energy for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Dry Lake Valley Integrated Solar Combined Cycle Project consisting of new solar thermal facilities to be integrated with two existing natural gas-fired generation stations with a nameplate capacity of approximately 120 MW to be located in the Apex Industrial Park in Clark County, Nevada.
View09-0901409/16/2009Amended Application of Searchlight Wind Energy LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Searchlight Wind Project consisting of up to 87 turbines, two substations, overhead transmission lines, and four permanent meteorological masts to be located in Clark County, Nevada.
View09-0400204/03/2009Application of Vulcan Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Salt Wells Geothermal Development Project consisting of two 60 MW geothermal power plants and associated facilities to be located within federally leased acreage at Salt Wells, Nevada.