Return

Search by
Docket Number



Dockets By Company

All Dockets

Annual Reports

Electric Dockets

Gas Dockets

Incident Report Dockets

Investigations and Rulemakings

Mobile Home Parks

Rail Safety Dockets

Renewable Energy Dockets

Telecommunications Dockets

Water/Wastewater Dockets


Showing: Active Gas Dockets           Click to view: Completed Gas Dockets
 Dkt No.Date FiledDescription
View20-0202002/24/2020Joint Petition of the Regulatory Operations Staff and Southwest Gas Corporation ("SWG") requesting the Commission accept a stipulation regarding violations of Nevada's One Call Law by SWG.
View20-0104102/06/2020Application of AmeriGas Propane, L.P. d/b/a Bi-State Propane for approval to use an alternative method to determine margin rates and for a determination that its margin rates for the preceding fiscal year were just and reasonable.
View20-0103501/30/2020Joint Petition of the Regulatory Operations Staff and V.T. Construction, Inc. ("VT Construction") requesting the Commission accept a stipulation regarding violations of Nevada's One Call Law by VT Construction.
View20-0103301/30/2020Joint Petition of the Regulatory Operations Staff and Western States Contracting, Inc. ("Western States") requesting the Commission accept a stipulation regarding violations of Nevada's One Call Law by Western States.
View20-0103201/30/2020Petition of the Regulatory Operations Staff to open an investigation and rulemaking docket to adopt a new regulation in Chapter 455 of the Nevada Administrative Code regarding damage to subsurface installations while using hand tools.
View20-0101301/06/2020Joint Petition of the Regulatory Operations Staff and Landscape Specialties Inc d/b/a LSI ("LSI") requesting the Commission accept a stipulation regarding violations of Nevada's One Call Law by LSI.
View20-0100701/02/2020Pipeline Safety Enforcement Actions and Inspection Reports by the Regulatory Operations Staff pursuant to 49 CFR 191 and 192 for calendar year 2020.
View20-0100601/02/2020One Call Enforcement Actions and Inspection Reports by the Regulatory Operations Staff pursuant to NRS 455 for calendar year 2020.
View19-1202512/24/2019Application of Sierra Pacific Power Company d/b/a NV Energy, filed under Advice Letter No. 332-G, to revise Gas Main Extensions Rule No. 9 to adjust the Tax Gross-up Rate.
View19-1102611/19/2019Joint Petition of the Regulatory Operations Staff and VersaGrade, Inc. ("VersaGrade") requesting the Commission accept a stipulation regarding violations of Nevada's One Call Law by VersaGrade.
View19-1101211/14/2019Application of Occidental Energy Marketing, Inc. to voluntarily discontinue service as an alternative seller of natural gas conducted under License No. G-7.
View19-1101111/13/2019Joint Petition of the Regulatory Operations Staff and Granite Construction Company ("Granite Construction") requesting the Commission accept a stipulation regarding violations of Nevada's One Call Law by Granite Construction.
View19-1100811/08/2019Joint Petition of the Regulatory Operations Staff and Cruz Construction Company, Inc. ("Cruz Construction") requesting the Commission accept a stipulation regarding violations of Nevada's One Call Law by Cruz Construction.
View19-1100111/01/2019Joint Petition of the Regulatory Operations Staff and Campbell Construction Co., Inc. ("Campbell Construction") requesting the Commission accept a stipulation regarding violations of Nevada’s One Call Law by Campbell Construction.
View19-1002310/24/2019Joint Petition of the Regulatory Operations Staff and Gradex Construction Company ("Gradex Construction") requesting the Commission accept a stipulation regarding violations of Nevada’s One Call Law by Gradex Construction.
View19-1002210/23/2019Joint Petition of the Regulatory Operations Staff and RLO Equipment, Inc. d/b/a Apache Electric ("Apache Electric") requesting the Commission accept a stipulation regarding violations of Nevada’s One Call Law by Apache Electric.
View19-1000910/14/2019Joint Petition of the Regulatory Operations Staff and Terra Contracting, Inc. ("Terra Contracting") requesting the Commission accept a stipulation regarding violations of Nevada’s One Call Law by Terra Contracting.
View19-0901709/25/2019Amended Petition of Southwest Gas Corporation ("SWG") requesting the Commission determine whether completion of certain gas infrastructure replacement ("GIR") projects approved by the Commission in Docket No. 18-06004 are required to be completed on an accelerated basis, whether the decelerated completion of these GIR projects would exacerbate a safety and reliability concern and negatively affect SWG’s ability to provide safe and reliable service, and whether these projects may instead be replaced in the normal course of business.
View19-0900709/11/2019Joint Petition of the Regulatory Operations Staff and Northwest Landscape & Maintenance LLC ("Northwest") requesting the Commission accept a stipulation regarding violations of Nevada’s One Call Law by Northwest.
View19-0900409/11/2019Joint Petition of the Regulatory Operations Staff and Curtis & Sons Construction, Inc. ("Curtis & Sons Construction") requesting the Commission accept a stipulation regarding violations of Nevada’s One Call Law by Curtis & Sons Construction.
View19-0900109/03/2019Joint Petition of the Regulatory Operations Staff and R & N Construction LLC ("R & N Construction") requesting the Commission accept a stipulation regarding violations of Nevada’s One Call Law by R & N Construction.
View19-0802008/19/2019Application of AmeriGas Propane, L.P. for authority to provide liquefied petroleum gas service to Pineview Estates in Gardnerville, Nevada.
View19-0604806/27/2019Joint Petition of the Regulatory Operations Staff and Topp Equipment Service ("Topp Equipment") requesting the Commission accept a stipulation regarding violations of Nevada's One Call Law by Topp Equipment.
View19-0600306/04/2019Application of Southwest Gas Corporation to establish the Average Variable Interest Rate and Accumulated Deferred Interest rate in Southern Nevada, Unrecovered Gas Cost Expense rates, system shrinkage rates, Imbalance Commodity and Reservation Charges, Renewable Energy Program Rates, General Revenues Adjustment rates, and Conservation and Energy Efficiency rates.
View19-0501705/09/2019Notice by Southwest Gas Corporation, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct a 69.5 mile natural gas transmission pipeline to be located in Clark County, Nevada.
View19-0303103/21/2019Notice by Pilot Pipeline LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Pilot Pipeline Project consisting of a 54-mile natural gas transmission pipeline and ancillary facilities to be located in Elko County, Nevada.
View19-0100701/02/2019Pipeline Safety Enforcement Actions and Inspection Reports by the Regulatory Operations Staff pursuant to 49 CFR 191 and 192 for calendar year 2019.
View19-0100601/02/2019One Call Enforcement Actions and Inspection Reports by the Regulatory Operations Staff pursuant to NRS 455 for calendar year 2019.
View18-1201212/12/2018Petition of the Regulatory Operations Staff requesting the Commission accept a stipulation regarding violations of Nevada's One Call Law by Merlin Jay Hardy d/b/a Hardy Construction and Development.
View18-1002410/22/2018Joint Petition of the Regulatory Operations Staff and CMMCM LLC d/b/a Muller Construction ("Muller") requesting the Commission accept a stipulation regarding violations of Nevada's One Call Law by Muller.
View18-0503105/29/2018Application of Southwest Gas Corporation for authority to increase its retail natural gas utility service rates and to reset the Gas Infrastructure Replacement Rates for Southern and Northern Nevada.
View18-0100701/02/2018Pipeline Safety Enforcement Actions and Inspection Reports by the Regulatory Operations Staff pursuant to 49 CFR 191 and 192 for calendar year 2018.
View17-1100811/06/2017Application of Southwest Gas Corporation for authority to expand its gas infrastructure, recover costs of gas infrastructure expansion projects through alternative cost-recovery methodologies, and amend Certificate of Public Convenience and Necessity ("CPC") 2627 Sub 5 to expand its service territory to include areas located in Mesquite, Nevada.
View15-1200312/03/2015Joint Petition of the Regulatory Operations Staff and Southwest Gas Corporation ("SWG") requesting the Commission accept a stipulation regarding violations of the Federal Pipeline Safety Regulations by SWG.
View13-0403504/29/2013Application of Prospector Pipeline Company, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Eureka Pipeline Project consisting of approximately 18 miles of 12-inch diameter natural gas pipeline extending south from the southern terminus of the existing North Elko Pipeline at the Goldstrike Meter Station to the Newmont Gold Quarry Mine located in Eureka County, Nevada.