Showing: Active Electric Dockets           Click to view: Completed Electric Dockets
 Dkt No.Date FiledDescription
View19-0501205/03/2019Application of Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct to expand the existing West Tracy Substation located in Storey County, Nevada.
View19-0501105/03/2019Application of Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct a new water equalization pond at the Tracy Generating Station located in Storey County, Nevada.
View19-0501005/03/2019Application of Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct a 230/69 kV auto bank and associated facilities at the Bighorn Substation located in Clark County, Nevada.
View19-0500305/01/2019Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the second amendment to its 2018 Joint Integrated Resource Plan to update and modify the load forecast, the Demand-Side Management Action Plan, the generation portion of the Supply-Side Action Plan, and the Transmission Action Plan.
View19-0500205/01/2019Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval to reallocate costs of the One Nevada Transmission Line pursuant to the Order issued in Docket No. 18-06003.
View19-0500105/01/2019Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of a new Joint Dispatch Agreement governing transactions utilizing the One Nevada Transmission Line pursuant to the Order issued in Docket No. 15-03001.
View19-0402905/02/2019Application of Kensington Land Lease Community, LLC d/b/a Kensington Community to withdraw $105,116.00 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View19-0402204/23/2019Application of Two Blackbirds Hospitality Management LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View19-0400304/01/2019Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the first amendment to its 2019-2038 Triennial Integrated Resource Plan to include a Distributed Resources Plan.
View19-0304003/29/2019Filing by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of annual report on the quality of service metrics in compliance with the Order issued in Docket No. 15-06064.
View19-0303404/04/2019Application of Carefree Country Mobile Home Park to withdraw $89,069.12 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View19-0303203/22/2019Petition of Regulatory Operations Staff for an Advisory Opinion or Declaratory Order as to whether Switch, Ltd. is operating as a public utility as defined in NRS 704.020.
View19-0301303/07/2019Application of Sierra Pacific Power Company d/b/a NV Energy, filed under Advice Letter No. 617-E, to revise Electric Tariff No. 2 to submit short-term avoided cost rates for purchases from Qualifying Facilities pursuant to Schedule CSPP - Short-Term.
View19-0301203/07/2019Application of Nevada Power Company d/b/a NV Energy, filed under Advice Letter No. 494, to revise Electric Tariff No. 1-B to reflect the avoided short-term cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule QF - Short Term.
View19-0300203/01/2019Application of Sierra Pacific Power Company d/b/a NV Energy for approval of fuel and purchased power expenses and to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rates, reset the Base Energy Efficiency Program Rates, reset the Base Energy Efficiency Implementation Rates, reset the Energy Efficiency Program Amortization Rate, reset the Energy Efficiency Implementation Amortization Rate, and refund the total amount of Base Energy Efficiency Implementation Rate revenue received in 2018, including carrying charges.
View19-0300103/01/2019Application of Nevada Power Company d/b/a NV Energy for approval of fuel and purchased power expenses and to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rates, reset the Base Energy Efficiency Program Rates, reset the Base Energy Efficiency Implementation Rates, reset the Energy Efficiency Program Amortization Rate, reset the Energy Efficiency Implementation Amortization Rate, and refund the total amount of Base Energy Efficiency Implementation Rate revenue received in 2018, including carrying charges.
View19-0202202/19/2019Application of Nevada Property 1 LLC d/b/a The Cosmopolitan of Las Vegas to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View19-0200802/11/2019Application of Las Vegas Convention and Visitors Authority to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View19-0200202/08/2019Application of Air Liquide Hydrogen Energy U.S. LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View19-0100901/02/2019Reports from electric and gas utilities operating in Nevada of transactions and calculations affecting the deferred energy accounts pursuant to NAC 704.195 for calendar year 2019.
View19-0100401/02/2019Annual Reports for calendar year 2018 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987.
View18-1201912/27/2018Application of Las Vegas Resort Holdings, LLC d/b/a SLS Las Vegas to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-1200312/06/2018Application of Gaughan South LLC d/b/a South Point Hotel and Casino to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-1103911/28/2018Amended Application of Boyd Gaming Corporation to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-1003410/31/2018Amended Application of MSG Las Vegas, LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-1003010/29/2018Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Carpenter Canyon Substation, consisting of a 230 kV substation and associated facilities, to interconnect an existing 230 kV transmission line with the ARES Nevada LLC Regulation Energy Management project to be located east of Pahrump in Nye County, Nevada.
View18-0901609/26/2018Application of Sierra Pacific Power Company d/b/a NV Energy for authority to establish debt issuance authorizations based on a debt ceiling of $1,600.0 million.
View18-0901509/25/2018Application of Georgia-Pacific Gypsum LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-0900309/07/2018Application of LV Stadium Events Company, LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-0600906/06/2018Application of Fulcrum Sierra BioFuels, LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-0600806/06/2018Application of Station Casinos LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-0600306/01/2018Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2019-2038 Triennial Integrated Resource Plan and 2019-2021 Energy Supply Plan.
View18-0100401/02/2018Annual Reports for calendar year 2017 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987.
View17-1201812/27/2017Notice by Hydrostor A-CAES USA Inc., under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an advanced compressed air energy storage facility to be located approximately 10 miles outside of Ely in White Pine County, Nevada.
View17-0701607/14/2017Notice by Southern California Public Power Authority, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Apex Transmission Line consisting of approximately 10 to 14 miles of 500 kV transmission line and associated facilities to be located in Clark County, Nevada.
View17-0600406/05/2017Application of Nevada Power Company d/b/a NV Energy for approval of new and revised depreciation and amortization rates for its electric and common accounts.
View17-0600306/05/2017Application of Nevada Power Company d/b/a NV Energy for authority to adjust its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View17-0501405/15/2017Application of Peppermill Casinos Inc. d/b/a Peppermill Resort Spa Casino to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View16-1103511/23/2016Application of Caesars Enterprise Services, LLC to purchase energy, capacity, and/or ancillary services for eligible Northern Nevada meters from a provider of new electric resources.
View16-1103411/23/2016Application of Caesars Enterprise Services, LLC to purchase energy, capacity, and/or ancillary services for eligible Southern Nevada meters from a provider of new electric resources.
View16-0902309/30/2016Application of Switch Ltd. to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View16-0700407/01/2016Application of Nevada Power Company d/b/a NV Energy for authority to restate $1,277.5 million of existing long term debt authority and issue new refinancing authority of $1,323.2 million.
View16-0601706/14/2016Notice by TransCanyon, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct approximately 213 miles of cross-tie 500 kV transmission line connecting the existing Robinson Summit and Mona/Clover substations and associated facilities to be located in White Pine County, Nevada.
View15-1100411/03/2015Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 577-E to revise Electric Tariff No. 1 to establish an Optional Flexible Payment Program.
View15-1100311/03/2015Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 459 to revise Tariff No. 1-B to establish an Optional Flexible Payment Program.
View15-0500605/08/2015Application of Wynn Las Vegas, LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View15-0300103/02/2015Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of an Indefinite Joint Dispatch Agreement governing transactions utilizing the One Nevada Transmission Line.
View14-0901509/22/2014Petition of the Regulatory Operations Staff for an Order directing Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy to file requested information with the Commission regarding the advanced metering infrastructure.
View13-0702107/17/2013Joint Application of Nevada Power Company d/b/a NV Energy, Sierra Pacific Power Company d/b/a NV Energy (referenced together as "NV Energy, Inc.") and MidAmerican Energy Holdings Company ("MidAmerican") for approval of a merger of NV Energy, Inc. with MidAmerican.
View12-1202912/26/2012Amended Application of Toquop Power Holdings, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct a 1,100 MW natural gas-fired power generation plant, natural gas and transmission interconnection lines, and associated facilities to be located near Mesquite in Lincoln and Clark Counties, Nevada.
View12-0802308/22/2012Application of Moapa Solar, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct a 7.5 mile 230 kV overhead transmission line to the Harry Allen Substation and a 1.5 mile 500 kV overhead transmission line to connect a solar facility located on the Moapa River Indian Reservation to the existing Crystal Valley and Harry Allen Substations located in Clark County, Nevada.
View11-0500205/06/2011Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct approximately 138 miles of new overhead 230 kV, 345 kV, and/or 500 kV electric transmission lines and associated facilities to be located in Nye and Clark Counties, Nevada.
View09-1100511/04/2009Application of TransWest Express LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the TransWest Express Transmission Project consisting of a 600 kV DC transmission line running from central Wyoming to southern Nevada and associated facilities.