Return

Search by
Docket Number



Dockets By Company

All Dockets

Annual Reports

Electric Dockets

Gas Dockets

Incident Report Dockets

Investigations and Rulemakings

Mobile Home Parks

Rail Safety Dockets

Renewable Energy Dockets

Telecommunications Dockets

Water/Wastewater Dockets


Showing: Active Electric Dockets           Click to view: Completed Electric Dockets
 Dkt No.Date FiledDescription
View21-1001210/14/2021Application of Sierra Pacific Power Company d/b/a NV Energy to revise Electric Tariff No. 1 to establish ON Line Temporary Rider Schedule No. ONTR and for authorization to commence rate recovery of the One Nevada Transmission Line reallocated revenue requirement.
View21-1000810/12/2021Application of Nevada Power Company d/b/a NV Energy, filed under Advice Letter No. 521, to revise Public Street Lighting and Traffic Control Service Schedule No. SL to allow auxiliary devices such as public safety and wireless communications equipment be installed and billed up to a limited percentage of total load per service.
View21-0903209/23/2021Application of Sierra Pacific Power Company d/b/a NV Energy, filed under Advice Letter No. 642-E, to revise Incremental Price Tariff Schedule No. IP to provide a path for NRS Chapter 704B customers to return to bundled utility service and identify rates and conditions applicable to such customers.
View21-0903109/23/2021Application of Nevada Power Company d/b/a NV Energy, filed under Advice Letter No. 516, to revise Incremental Price Tariff Schedule No. IP to provide a path for NRS Chapter 704B customers to return to bundled utility service and identify rates and conditions applicable to such customers.
View21-0900409/01/2021Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their Economic Recovery Transportation Electrification Plan for the period 2022-2024.
View21-0900309/01/2021Report of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy on the progress of its Natural Disaster Protection Plan for the Action Plan Period 2021-2023.
View21-0800208/09/2021Application of Brookfield Renewable Energy Marketing US LLC d/b/a Brookfield Renewable for a license to operate as a provider of new electric resources.
View21-0601106/07/2021Application of Nevada Power Company d/b/a NV Energy for approval of an Energy Supply Agreement with Resorts World Las Vegas LLC.
View21-0600106/01/2021Amended Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2022-2041 Triennial Integrated Resource Plan, including the Transmission Infrastructure for a Clean Energy Economy Plan, and 2022-2024 Energy Supply Plan.
View21-0501305/13/2021Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 641-E to revise Electric Tariff No. 1 to modify Net Metering Rider-405 Schedule No. NMR-405 to clarify premises language pursuant to the Order issued in Docket No. 20-07008.
View21-0501205/13/2021Application of Nevada Power Company d/b/a NV Energy, filed under Advice Letter No. 515, to revise Tariff No. 1-B to modify Net Metering Rider-405 Schedule No. NMR-405 to clarify premises language pursuant to the Order issued in Docket No. 20-07008.
View21-0300603/01/2021Application of Sierra Pacific Power Company d/b/a NV Energy for approval of fuel and purchased power expenses, to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rate, reset the Base Energy Efficiency Program Rates, reset the Base Energy Efficiency Implementation Rates, reset the Energy Efficiency Program Amortization Rate, and reset the Energy Efficiency Implementation Amortization Rate.
View21-0300503/01/2021Application of Nevada Power Company d/b/a NV Energy for approval of fuel and purchased power expenses, to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rate, reset the Base Energy Efficiency Program Rates, reset the Base Energy Efficiency Implementation Rates, reset the Energy Efficiency Program Amortization Rate, reset the Energy Efficiency Implementation Amortization Rate, and refund the total amount of Base Energy Efficiency Implementation Rate revenue received in 2020, including carrying charges.
View21-0300403/10/2021Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of a regulatory asset account to recover costs relating to the development and implementation of their Joint Natural Disaster Protection Plan.
View21-0101301/04/2021Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2021.
View21-0101201/04/2021Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2021.
View21-0101101/04/2021Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021.
View21-0100901/04/2021Reports from electric and gas utilities operating in Nevada of transactions and calculations affecting the deferred energy accounts pursuant to NAC 704.195 for calendar year 2021.
View21-0100401/04/2021Annual Reports for calendar year 2020 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987.
View20-1202712/23/2020Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2020.
View20-1201512/15/2020Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2020.
View20-1003210/29/2020Notice by Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Round Mountain Transformer Addition Project consisting of a 230/25 kV transformer and associated facilities to be located approximately 2 miles west of Round Mountain in Nye County, Nevada.
View20-1002810/28/2020Notice by Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Reid Gardner to Tortoise 230 kV #2 Transmission Line Project consisting of a 2.7-mile 230 kV overhead transmission line and associated facilities to be located approximately 52 miles northeast of Las Vegas in Clark County, Nevada.
View20-0702507/20/2020Notice by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Greenlink West Transmission Line Project consisting of the expansion of the Harry Allen switching station, expansion of the Northwest, Comstock Meadows, and Mira Loma substations, new Amargosa and Esmeralda collector substations, a new Fort Churchill substation, a new Fort Churchill-Northwest 525 kV transmission line, a new Harry Allen-Northwest 525 kV transmission line, a new Comstock Meadows-Fort Churchill 345 kV transmission line, a new Fort Churchill-Mira Loma 345/120 kV transmission line, and associated facilities to be located in Clark, Nye, Esmeralda, Mineral, Lyon, Storey and Washoe Counties, Nevada.
View20-0702407/20/2020Notice by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Greenlink North Transmission Line Project consisting of the expansion of the Robinson Summit substation, a new Lander substation, a new Fort Churchill-Robinson Summit 525 kV transmission line, and associated facilities to be located in White Pine, Eureka, Lander, Churchill, and Lyon Counties, Nevada.
View20-0702307/20/2020Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the fourth amendment to its 2018 Joint Integrated Resource Plan to update and modify the renewable portion of the Supply-Side Action Plan and the Transmission Action Plan.
View20-0700407/01/2020Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2020 Combined Annual Electric Demand Side Management Update Report as it relates to the Action Plan of their 2019-2038 Joint Integrated Resource Plan.
View20-0500405/04/2020Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 629-E to establish Customer Price Stability Tariff Schedule No. CPST ("the Program") to assist certain qualifying customers during the COVID-19 pandemic and economic downturn, and to address certain customer requests for price stability and potential cost savings in meeting customer-specific business needs and sustainability objectives.
View20-0500305/04/2020Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 504 to establish Customer Price Stability Tariff Schedule No. CPST (the "Program") to assist certain qualifying customers during the COVID-19 pandemic and economic downturn, and to address certain customer requests for price stability and potential cost savings in meeting customer-specific business needs and sustainability objectives.
View20-0203202/28/2020Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of a regulatory asset account to recover costs relating to the development and implementation of their Joint Natural Disaster Protection Plan.
View20-0203102/28/2020Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their Joint Natural Disaster Protection Plan.
View20-0101101/02/2020Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021.
View20-0100401/02/2020Annual Reports for calendar year 2019 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987.
View19-1201712/19/2019Application of Nevada Power Company d/b/a NV Energy for approval of an Energy Supply Agreement with Lumen Group LLC.
View19-1000610/07/2019Application of Nevada Power Company d/b/a NV Energy for authority to establish debt issuance authorizations based on a debt ceiling of $3,200.0 million.
View19-0800108/01/2019Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021.
View19-0603906/24/2019Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the third amendment to its 2018 Joint Integrated Resource Plan to update and modify the renewable portion of the Supply-Side Action Plan and the Transmission Action Plan.
View19-0600206/03/2019Application of Sierra Pacific Power Company d/b/a NV Energy for authority to adjust its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View19-0503205/23/2019Monthly reports by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy demonstrating the amount of total incentive funds expended and reserved for all programs funded under NRS 701B.005 pursuant to the Order issued in Docket No. 18-02002.
View19-0200202/08/2019Application of Air Liquide Hydrogen Energy U.S. LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View19-0100401/02/2019Annual Reports for calendar year 2018 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987.
View18-1201912/27/2018Application of Las Vegas Resort Holdings, LLC d/b/a Sahara Las Vegas (formerly d/b/a SLS Las Vegas) to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-1003410/31/2018Amended Application of MSG Las Vegas, LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-1003010/29/2018Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Carpenter Canyon Substation, consisting of a 230 kV substation and associated facilities, to interconnect an existing 230 kV transmission line with the ARES Nevada LLC Regulation Energy Management project to be located east of Pahrump in Nye County, Nevada.
View18-1002210/19/2018In re: to establish a working group contemplated by Section 15 of the regulations adopted in Docket No. 17-08021 (LCB File No. R022-18).
View18-0901609/26/2018Application of Sierra Pacific Power Company d/b/a NV Energy for authority to establish debt issuance authorizations based on a debt ceiling of $1,600.0 million.
View18-0901509/25/2018Application of Georgia-Pacific Gypsum LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-0600306/01/2018Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2019-2038 Triennial Integrated Resource Plan and 2019-2021 Energy Supply Plan.
View17-1201812/27/2017Notice by Hydrostor A-CAES USA Inc., under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an advanced compressed air energy storage facility to be located approximately 10 miles outside of Ely in White Pine County, Nevada.
View17-0701607/14/2017Notice by Southern California Public Power Authority, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Apex Transmission Line consisting of approximately 10 to 14 miles of 500 kV transmission line and associated facilities to be located in Clark County, Nevada.
View17-0600406/05/2017Application of Nevada Power Company d/b/a NV Energy for approval of new and revised depreciation and amortization rates for its electric and common accounts.
View17-0600306/05/2017Application of Nevada Power Company d/b/a NV Energy for authority to adjust its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View16-0902309/30/2016Application of Switch Ltd. to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View16-0700407/01/2016Application of Nevada Power Company d/b/a NV Energy for authority to restate $1,277.5 million of existing long term debt authority and issue new refinancing authority of $1,323.2 million.
View16-0601706/14/2016Notice by TransCanyon, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct approximately 214 miles of 500 kV transmission line connecting the existing Thirty Mile/Robinson Summit and Mona/Clover substations and associated facilities, portions of which will be located in White Pine County, Nevada
View14-0901509/22/2014Petition of the Regulatory Operations Staff for an Order directing Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy to file requested information with the Commission regarding the advanced metering infrastructure.
View12-0802308/22/2012Amended Application of Arrow Canyon Solar, LLC under the provisions of the Utility Environmental Protection Act, for four permits to construct a 230 kV transmission line and associated facilities, main access road, substation upgrades, and temporary water pipeline on land under the management of the Bureau of Land Management located approximately 20 miles northwest of Las Vegas in Clark County, Nevada.
View11-0500205/06/2011Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct approximately 138 miles of new overhead 230 kV, 345 kV, and/or 500 kV electric transmission lines and associated facilities to be located in Nye and Clark Counties, Nevada.
View09-1100511/04/2009Application of TransWest Express LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the TransWest Express Transmission Project consisting of a 600 kV DC transmission line running from central Wyoming to southern Nevada and associated facilities.