Showing: Active Renewable Energy Dockets           Click to view: Completed Renewable Energy Dockets
 Dkt No.Date FiledDescription
View18-1101611/16/2018Application of Sierra Pacific Power Company d/b/a NV Energy, filed under Advice Letter No. 614-E, to implement Schedule NV GreenEnergy 2.0 Rider ("Schedule No. NGR 2.0") to allow eligible commercial bundled service customers to voluntarily contract with the utility to increase their use of reliance on renewable energy at current market-based fixed prices.
View18-1101511/16/2018Application of Nevada Power Company d/b/a NV Energy, filed under Advice Letter No. 491, to implement Schedule NV GreenEnergy 2.0 Rider ("Schedule No. NGR 2.0") to allow eligible commercial bundled service customers to voluntarily contract with the utility to increase their use of reliance on renewable energy at current market-based fixed prices.
View18-1100711/14/2018Notice by 325MK 8me LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an approximately 12.4-mile 230 kV generation-tie transmission line to connect a 300 MW photovoltaic solar facility with the Reid Gardner Substation, to be located in Clark County, Nevada.
View18-1100511/08/2018Petition of the Regulatory Operations Staff to amend Nevada Administrative Code 704.8881 to extend the time allotted for the Commission to issue an order determining whether a provider of electric service has complied with its Renewable Portfolio Standard requirements.
View18-1001310/15/2018Application of Lovelock Solar Energy LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Lovelock Solar Energy Project consisting of an approximately 190 MW alternating current photovoltaic solar electric generating facility and associated facilities to be located east of Oreana in Pershing County, Nevada.
View18-0900409/11/2018Application of Nevada Geothermal Utility Company for approval of a change of name to Avalon Geothermal, Inc. for operations conducted under Geothermal Operating Permit ("GOP") 100.
View18-0602406/14/2018Notice by Dodge Flat Solar, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct a 34.5 kV collection line and an access road to be located in Washoe County, Nevada.
View18-0602306/14/2018Notice by Fish Springs Ranch Solar, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct a 34.5 kV collection line and an access road to be located in Washoe County, Nevada.
View18-0400504/04/2018Notice by Red Flats Lands, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Red Flats Solar Project consisting of an up to 500 MW photovoltaic solar electric generating facility and associated facilities to be located in Clark County, Nevada.
View18-0400404/04/2018Notice by Red Valley Lands, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Red Valley Solar Project consisting of an up to 200 MW photovoltaic solar electric generating facility and associated facilities to be located in Clark County, Nevada.
View18-0400304/04/2018Notice by Magnolia Lands, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Magnolia Solar Project consisting of an up to 100 MW photovoltaic solar electric generating facility and associated facilities to be located in Clark County, Nevada.
View18-0400204/04/2018Notice by Aurora Solar, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct a 120 kV generation-tie line and access road associated with the Iron Point Solar Project, to be located approximately 30 miles east of Winnemucca in Humboldt County, Nevada.
View18-0101001/02/2018Applications for calendar year 2018 received by a utility under the Solar Energy Systems Incentive Program.
View17-0800308/07/2017Notice by Sandstone Solar Energy, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an up to 1,600 MW concentrating solar power electric generation facility and associated facilities to be located north of Tonopah in Nye County, Nevada.
View17-0702607/28/2017Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of tariff schedules and rates pursuant to Assembly Bill 405 (2017).
View17-0702407/21/2017Notice by Solar Partners XI, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct up to a 690 MW alternating current photovoltaic solar facility and associated facilities to be located approximately 25 miles north of Las Vegas in Clark County, Nevada.
View17-0604806/30/2017Joint Application of Nevada Geothermal Utility Company, Inc. ("NGUC") and Avalon Geothermal, LLC ("Avalon") for approval of Avalon's acquisition of NGUC and its Geothermal Operating Permit ("GOP") No. 001 and for approval of an expansion of the existing service area under GOP 001.
View17-0203902/23/2017Application of Nevada Geothermal Utility Company, Inc. to voluntarily discontinue geothermal service conducted under Geothermal Operating Permit ("GOP") 001.
View16-1103611/28/2016Application of Battle Mountain SP, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Battle Mountain Project consisting of an approximately 101 MW alternating current photovoltaic solar facility and associated facilities, including improvements to an existing access road, located in Humboldt County, Nevada.
View16-0805008/30/2016Notice by South Ridge Solar, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct a 200 MW solar photovoltaic generation facility, a 230 kV gen-tie transmission line, and associated facilities to be located in Nye and Clark Counties, Nevada.
View16-0702307/19/2016Application of Sierra Pacific Power Company d/b/a NV Energy for approval of annual plans for the Solar Thermal Systems Demonstration Program for Program Year 2017.
View16-0602606/24/2016Notice by Yellow Pine Solar, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct a 250 MW solar photovoltaic facility, a 138 kV or 230 kV gen-tie transmission line, and associated facilities to be located approximately 10 miles southeast of Pahrump in Clark County, Nevada.
View14-1101611/19/2014Application of Aiya Solar Project, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct a 230 kV transmission gen-tie line consisting of approximately 1.5 miles of 230 kV transmission line connecting to a 100 MW photovoltaic solar facility being developed on Moapa River Indian Reservation land and associated facilities to be located approximately 40 miles northwest of Las Vegas in Clark County, Nevada.
View14-0900209/03/2014Application of Invenergy Solar Development LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct a 130 MW solar photovoltaic generation facility, approximately 1 mile of 230 kV aboveground transmission line connecting to the existing Harry Allen Substation, and associated facilities to be located within the Dry Lake Solar Energy Zone approximately 15 miles northeast of Las Vegas in Clark County, Nevada.
View14-0800308/05/2014Application of Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Dry Lake Solar Energy Center project consisting of a 150 MW solar photovoltaic generation facility, a 230 kV overhead transmission line connecting to the existing Harry Allen Substation, and associated facilities to be located approximately 23 miles north of Las Vegas in Dry Lake Valley, Clark County, Nevada.
View14-0503905/28/2014Application of Sunshine Valley Solar, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Sunshine Valley Solar Project consisting of a 110 MW AC solar photovoltaic electric generating facility and associated facilities, interconnecting with Valley Electric Association’s 138 kV substation via an approximately 0.5 mile generation-tie transmission line, to be located in the Town of Amargosa Valley in Nye County, Nevada.
View14-0500605/02/2014Application of ARES Nevada, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct two 230 kV transmission facilities and ancillary facilities consisting of an Advanced Rail Storage Regulation Energy Management project and other appurtenant electrical facilities to be located east of Pahrump, in Clark County and Nye County, Nevada.
View13-0500305/01/2013Application of Mesa Solar Energy, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the California Ridge Solar Project consisting of up to a 200 MW AC solar photovoltaic generation facility, approximately 3 to 4 miles of aboveground 230 kV transmission line, and associated facilities to be located in Clark County, Nevada.
View13-0500205/01/2013Application of Mesa Solar Energy, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Meadow Valley Solar Project consisting of up to a 200 MW AC solar photovoltaic generation facility, approximately 3 miles of aboveground 230 kV transmission line, and associated facilities to be located in Clark County, Nevada.
View12-1203212/26/2012Application of Pahrump Valley Solar LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Pahrump Valley Solar Project consisting of a 90 MW photovoltaic solar plant, a 135 MW concentrating solar power tower plant, 230 kV transmission line, and associated facilities to be located near Pahrump in Nye County, Nevada.
View12-1103711/28/2012Application of Pacific Solar Investments, Inc., under the provisions of the Utility Environmental Protection Act, for a permit to construct the Cactus Springs Solar Project consisting of a 150 MW photovoltaic solar-powered electric generating facility, 230 kV transmission line, and associated facilities to be located in Nye and Clark Counties, Nevada.
View12-1001810/17/2012Application of Copper Rays Solar, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Copper Rays Solar facility consisting of a 180 MW photovoltaic solar-powered electric generating facility, approximately 2.6 miles of 230 kV transmission line, and associated facilities to be located near Pahrump in Nye County, Nevada.
View12-0900609/12/2012Application of Crescent Peak Renewables, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Crescent Peak Wind Project, a 500 MW wind-powered electric generating facility consisting of up to 220 wind turbine generators, a 115 kV to 230 kV transmission line, and associated facilities to be located near Searchlight in Clark County, Nevada.
View12-0702107/26/2012Application of Skylar Townsite, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Townsite Solar Project consisting of a 180 MW photovoltaic solar-powered electric generating facility, 230 kV or 500 kV transmission line, and associated facilities to be located in Boulder City, Clark County, Nevada.
View12-0401304/18/2012Second Amended Application of Techren Solar, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Techren Boulder City Solar Project consisting of a 300 MW photovoltaic solar-powered electric generating facility, a substation with 34.5 kV to 230 kV step-up transformers, approximately 4 miles of 230 kV transmission line, a double circuit 230 kV transmission line to the Nevada Solar One Substation, an access road, two water pipelines, and associated facilities to be located in Boulder City, Clark County, Nevada.
View12-0101801/20/2012Amended Application of TGP Dixie Development Company, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the New York Canyon Geothermal Development and Interconnection Project consisting of a 70 MW geothermal power plant, approximately 24 miles of 230 kV transmission line, and associated facilities to be located in Buena Vista Valley in Pershing County, Nevada.
View11-0601406/27/2011Application of TGP Dixie Development Company, LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the TGP Coyote Canyon Geothermal Project consisting of a 70 MW geothermal power plant, a 0.4 mile long 230 kV transmission line, and associated facilities to be located in Dixie Valley in Churchill County, Nevada.
View09-0400204/03/2009Application of Vulcan Power Company for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the Salt Wells Geothermal Development Project consisting of two 60 MW geothermal power plants and associated facilities to be located within federally leased acreage at Salt Wells, Nevada.