| Dkt No. | Date Filed | Description |
View | 23-09020 | 09/22/2023 | Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Johnnie Corner to Beatty Transmission Line Upgrade Project consisting of approximately 57.7 miles of up to 500 kV transmission line, five new switchyards, and associated facilities to be located on private land and approximately 1,827 acres of federally-managed land in Nye County, Nevada. |
View | 23-09011 | 09/08/2023 | Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 667-E to revise Miscellaneous Charges Schedule No. MC to update fees charged by third party vendors for the credit, debit, electronic check, and ACH payment options. |
View | 23-09010 | 09/08/2023 | Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 541 to revise Miscellaneous Charges Schedule No. MC to update fees charged by third party vendors for the credit, debit, electronic check, and ACH payment options. |
View | 23-09003 | 09/01/2023 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for acceptance of their Joint Energy Supply Plan Update for 2024. |
View | 23-09002 | 09/01/2023 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for acceptance of their 2023 Joint Distributed Resources Plan Update as it relates to their 2022-2041 Joint Integrated Resource Plan. |
View | 23-08019 | 08/22/2023 | Application of Nevada Power Company d/b/a NV Energy for approval of an Energy Supply Agreement with MSG Las Vegas, LLC. |
View | 23-08018 | 08/22/2023 | Rajan Kuruvilla vs. Nevada Power Company d/b/a NV Energy. Complaint regarding missing MyAccount data and billing accuracy. |
View | 23-08015 | 08/22/2023 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the fifth amendment to its 2021 Joint Integrated Resource Plan. |
View | 23-08012 | 08/16/2023 | Notice by Invenergy Storage Development LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct a 230 kV transmission line to interconnect the proposed Sandlot Energy Storage Project with the Arden Substation to be located on federally-managed land in Clark County, Nevada. |
View | 23-07022 | 07/25/2023 | Notice by Solidus Resources, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to realign and construct portions of two 345 kV transmission lines to be located on private and federally-managed land in Pershing County, Nevada. |
View | 23-07021 | 07/24/2023 | Show Cause Proceeding to determine why Pair A Dice Mobile Home Park should not be assessed civil penalties for violation of Chapter 704 of the Nevada Revised Statutes related to handling of funds in a tenant service charge account. |
View | 23-07008 | 07/13/2023 | Heather Hill vs. Sierra Pacific Power Company d/b/a NV Energy. Complaint regarding power outages. |
View | 23-06046 | 06/30/2023 | Notice by TransWest Express LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the TransWest-DesertLink Interconnection Project consisting of an approximately 1.54-mile 500 kV transmission line and associated facilities to interconnect the TransWest Express Project with the existing DesertLink, Harry Allen to Eldorado transmission line to be located on federally managed land in Clark County, Nevada. |
View | 23-06044 | 06/30/2023 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2023 Combined Annual Electric Demand Side Management Update Report as it relates to the Action Plan of their 2022-2041 Joint Integrated Resource Plan |
View | 23-06024 | 06/20/2023 | Application of Desert Gold RV Park to withdraw $18,404.51 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system. |
View | 23-06008 | 06/05/2023 | Application of Nevada Power Company d/b/a NV Energy for approval of new and revised depreciation and amortization rates for its electric and common accounts. |
View | 23-06007 | 06/05/2023 | Application of Nevada Power Company d/b/a NV Energy for authority to adjust its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto. |
View | 23-05046 | 06/01/2023 | Joint Petition of Nevada Power Company d/b/a NV Energy ("Nevada Power") and MSG Las Vegas, LLC ("MSG Las Vegas") requesting a waiver of the eligibility requirement of Nevada Power's Customer Market Price Energy Tariff for MSG Las Vegas. |
View | 23-05044 | 05/31/2023 | Notice by Great Basin Transmission South, LLC, on behalf of the ON Line owners, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Robinson Summit Substation Expansion Project consisting of a 500 kV and a 345 kV switchyard and associated facilities to be located at the existing Robinson Summit Substation on approximately 55 acres of federally-managed land in White Pine County, Nevada. |
View | 23-05039 | 05/30/2023 | Application of Mercuria Energy America, LLC for a license to operate as a provider of new electric resources. |
View | 23-05020 | 05/16/2023 | Amended Notice by Western Bounty, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct Segment 3 of the Western Bounty Transmission Line Project consisting of an up to 350-mile 500kV to 800 kV single-circuit transmission line, a converter and substation, an up to 0.34 mile double-circuit 525 kV alternating current overhead transmission line connecting to the proposed Esmeralda Substation in Esmeralda County, Nevada, and associated facilities extending from the proposed Auriga Converter and Substation to either the Nevada-Idaho border through Esmeralda, Nye, Lander, Eureka, and Elko Counties, Nevada, or the Nevada-Oregon border through Esmeralda, Mineral, Lyon, Churchill, Washoe, Pershing, and Humboldt Counties, Nevada, to be located on private and federally-managed land. |
View | 23-05016 | 05/15/2023 | Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 23-02(E) to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective July 1, 2023. |
View | 23-05015 | 05/16/2023 | Nevada Power Company d/b/a NV Energy filed Notice No. 23-02 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective July 1, 2023. |
View | 23-05008 | 05/11/2023 | Andrea Kondora vs. Silver Springs Mobile Home Park. Complaint regarding electrical billing dispute. |
View | 23-05005 | 05/05/2023 | Notice by Western Bounty, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct Segment 2 of the Western Bounty Transmission Line Project consisting of an approximately 330-mile 500-800 kV single-circuit transmission line extending from the proposed Auriga Converter and Substation to the Nevada-Oregon border, and associated facilities to be located on private and federally-managed land in Esmerelda, Mineral, Lyon, Churchill, Washoe, and Pershing Counties, Nevada. |
View | 23-05004 | 05/09/2023 | Notice by Honey Mesquite Solar LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an approximately 10-mile 525 kV generation-tie line to interconnect the Honey Mesquite Storage Project with the proposed Walker River Substation to be located on federally-managed land in Lyon County, Nevada. |
View | 23-04016 | 04/18/2023 | Investigation regarding Sierra Pacific Power Company d/b/a NV Energy’s progress of developing a clean transition tariff and its appropriateness for development as a new tariff offering pursuant to the Modified Final Order issued in Docket Nos. 22-06014, 22-06015, and 22-06016. |
View | 23-03018 | 03/13/2023 | Notice by Opal Energy Storage LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Opal Energy Storage Transmission Project consisting of an approximately 0.5-mile 230 kV transmission line and associated facilities to connect the proposed Opal Energy Battery Storage System to the Crystal Substation to be located in Clark County, Nevada. |
View | 23-03017 | 03/13/2023 | Notice by Burro Canyon Energy Storage LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Burro Canyon Energy Storage Transmission Project consisting of an approximately 0.5-mile 230 kV transmission line and associated facilities to connect the proposed Burro Canyon Energy Battery Storage System to the Northwest Substation to be located in Clark County, Nevada. |
View | 23-03016 | 03/13/2023 | Notice by Twilight Energy Storage LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Twilight Energy Storage Transmission Project consisting of an approximately 0.5-mile 230 kV transmission line and associated facilities to connect the proposed Twilight Energy Battery Storage System to the Magnolia Substation to be located in Clark County, Nevada. |
View | 23-03006 | 03/01/2023 | Application of Sierra Pacific Power Company d/b/a NV Energy for approval of fuel and purchased power expenses, to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rate, reset the Base Energy Efficiency Program Rates, reset the Base Energy Efficiency Implementation Rates, reset the Energy Efficiency Program Amortization Rate, reset the Energy Efficiency Implementation Amortization Rate, and reset the Expanded Solar Program Costs Rate. |
View | 23-03005 | 03/01/2023 | Application of Nevada Power Company d/b/a NV Energy for approval of fuel and purchased power expenses, to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rate, reset the Base Energy Efficiency Program Rates, reset the Base Energy Efficiency Implementation Rates, reset the Energy Efficiency Program Amortization Rate, reset the Energy Efficiency Implementation Amortization Rate, reset the Expanded Solar Program Costs Rate, and refund the total amount of Base Energy Efficiency Implementation Rate revenue received in 2022, including carrying charges. |
View | 23-03004 | 03/01/2023 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the cost recovery of the regulatory assets relating to the development and implementation of their Joint Natural Disaster Protection Plan. |
View | 23-03003 | 03/01/2023 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their Joint Natural Disaster Protection Plan for the period 2024-2026. |
View | 23-02028 | 02/24/2023 | Filing by Sierra Pacific Power Company d/b/a NV Energy of annual report on the Economic Development Electric Rate Rider Program pursuant to NAC 704.8958. |
View | 23-02027 | 02/24/2023 | Filing by Nevada Power Company d/b/a NV Energy of annual report on the Economic Development Electric Rate Rider Program pursuant to NAC 704.8958. |
View | 23-02021 | 02/16/2023 | Matthew and Melody Chutter vs. Sierra Pacific Power Company d/b/a NV Energy. Complaint regarding northern Nevada outage claim denial. |
View | 23-02011 | 02/16/2023 | Application of Sierra Pacific Power Company d/b/a NV Energy, filed under Advice Letter No. 662-E, to revise Electric Tariff No. 1 to revise Large Customer Market Price Energy Schedule No. LCMPE to set forth when an Energy Supply Agreement must be filed with an Integrated Resource Plan ("IRP") or IRP amendment, a requirement for a true-up or adjustment, and a requirement for a short form statement O, pursuant to the Order issued in Docket No. 22-03025. |
View | 23-02010 | 02/16/2023 | Application of Nevada Power Company d/b/a NV Energy, filed under Advice Letter No. 535, to revise Tariff No. 1-B to revise Large Customer Market Price Energy Schedule No. LCMPE to set forth when an Energy Supply Agreement must be filed with an Integrated Resource Plan ("IRP") or IRP amendment, a requirement for a true-up or adjustment, and a requirement for a short form statement O, pursuant to the Order issued in Docket No. 22-03025. |
View | 23-01032 | 01/27/2023 | Notice by 331LB 8me LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Lava Butte Transmission Project consisting of an approximately 6.6-mile 500 kV transmission line and associated facilities to connect the proposed Lava Butte Battery Storage System to the Harry Allen Substation to be located in Clark County, Nevada. |
View | 23-01029 | 01/24/2023 | Notice by 341NW 8me LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Ladera Transmission Project consisting of an approximately 6.6-mile 230 kV transmission line and associated facilities to connect the proposed Ladera Battery Storage System to the Northwest Substation to be located in Clark County, Nevada. |
View | 23-01028 | 01/24/2023 | Notice by Estuary Development Partners LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Crystal Energy Storage Center Project consisting of an approximately 1.5-mile 500 kV generation-tie line to connect an on-site substation to the existing Crystal Substation, an up to 4,800 MWh battery energy storage system, and associated facilities to be located in Clark County, Nevada. |
View | 23-01027 | 01/23/2023 | Amended Application of Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Silverhawk Capacity Project consisting of two natural gas combustion turbines, a natural gas pipeline, underground and above-ground water pipelines, and associated facilities to be located adjacent to the Silverhawk Generating Station in Clark County, Nevada. |
View | 23-01024 | 01/13/2023 | Notice by Great Basin Transmission, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Robinson Summit Interconnection Project consisting of an approximately 1.3-mile 500 kV interconnection line and associated facilities to connect the existing Robinson Summit Substation to a 500 kV transmission line to be located in White Pine County, Nevada. |
View | 23-01017 | 01/03/2023 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its current Strategic Operating Plans pursuant to the Order issued in Docket No. 22-06014. |
View | 23-01015 | 01/03/2023 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its quarterly data metrics for its Economic Recovery Transportation Electrification Plan pursuant to the Order issued in Docket No. 21-09004. |
View | 23-01013 | 01/03/2023 | Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2023. |
View | 23-01012 | 01/03/2023 | Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2023. |
View | 23-01011 | 01/03/2023 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021. |
View | 23-01009 | 01/03/2023 | Reports from electric and gas utilities operating in Nevada of transactions and calculations affecting the deferred energy accounts pursuant to NAC 704.195 for calendar year 2023. |
View | 23-01004 | 01/03/2023 | Annual Reports for calendar year 2022 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987. |
View | 22-10013 | 10/20/2022 | Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Pahrump to Innovation Transmission Line Upgrade Project consisting of the upgrade of approximately 34 miles of existing 230 kV transmission line, the upgrade or expansion of the Pahrump and Innovation substations, and associated facilities to be located in Nye County, Nevada. |
View | 22-09006 | 09/01/2022 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the third amendment to its 2021 Joint Integrated Resource Plan. |
View | 22-08031 | 08/31/2022 | Second Report of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy on the progress of its Natural Disaster Protection Plan for the Action Plan Period 2021-2023. |
View | 22-07020 | 07/29/2022 | Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Trout Canyon to Pahrump Transmission Line Upgrade Project consisting of the upgrade of approximately 14.1 miles of existing 230 kV transmission line, the upgrade or expansion of the Gamebird and Pahrump substations, and associated facilities to be located in Clark and Nye Counties, Nevada. |
View | 22-06042 | 06/29/2022 | Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Innovation to Northwest Upgrade Project consisting of an upgrade of approximately 43.2 miles of 230 kV transmission line extending from the Innovation Substation to the Desert View Substation and associated facilities to be located in Clark and Nye Counties, Nevada. |
View | 22-06015 | 06/06/2022 | Application of Sierra Pacific Power Company d/b/a NV Energy for approval of new and revised depreciation and amortization rates for its electric operations. |
View | 22-06014 | 06/06/2022 | Application of Sierra Pacific Power Company d/b/a NV Energy for authority to adjust its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto. |
View | 22-03025 | 03/18/2022 | Investigation and Rulemaking to consider adopting regulations for determining whether an energy supply agreement is in the public interest and/or to examine whether Nevada Power Company d/b/a NV Energy’s Scheduled No. LCMPE should be revised to promote consistency, predictability, and equity. |
View | 22-03024 | 03/18/2022 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the first amendment to its 2021 Joint Integrated Resource Plan. |
View | 22-01021 | 01/06/2022 | Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to upgrade approximately 59 miles of 230 kV transmission line extending from the Trout Canyon Substation to the Sloan Canyon Switchyard and associated facilities to be located in Clark County, Nevada. |
View | 22-01015 | 01/03/2022 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its quarterly data metrics for its Economic Recovery Transportation Electrification Plan pursuant to the Order issued in Docket No. 21-09004. |
View | 22-01013 | 01/03/2022 | Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2022. |
View | 22-01012 | 01/03/2022 | Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2022. |
View | 22-01011 | 01/03/2022 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021. |
View | 22-01004 | 01/03/2022 | Annual Reports for calendar year 2021 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987. |
View | 21-10027 | 10/28/2021 | Application of Sierra Pacific Power Company d/b/a NV Energy for authority to establish capital issuance authorizations based on a debt ceiling of $1,900.0 million, a common stock ceiling of $2,200.0 million, and a preferred stock ceiling of $500.0 million, and enter into anticipatory financial hedging transactions. |
View | 21-10026 | 10/28/2021 | Application of Nevada Power Company d/b/a NV Energy for authority to establish capital issuance authorizations based on a debt ceiling of $3,800.0 million, a common stock ceiling of $4,100.0 million, and a preferred stock ceiling of $800.0 million, and enter into anticipatory financial hedging transactions. |
View | 21-10012 | 10/14/2021 | Application of Sierra Pacific Power Company d/b/a NV Energy to revise Electric Tariff No. 1 to establish ON Line Temporary Rider Schedule No. ONTR and for authorization to commence rate recovery of the One Nevada Transmission Line reallocated revenue requirement. |
View | 21-09004 | 09/01/2021 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their Economic Recovery Transportation Electrification Plan for the period 2022-2024. |
View | 21-06011 | 06/07/2021 | Application of Nevada Power Company d/b/a NV Energy for approval of an Energy Supply Agreement with Resorts World Las Vegas LLC. |
View | 21-06001 | 06/01/2021 | Amended Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2022-2041 Triennial Integrated Resource Plan, including the Transmission Infrastructure for a Clean Energy Economy Plan, and 2022-2024 Energy Supply Plan. |
View | 21-03004 | 03/10/2021 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of a regulatory asset account to recover costs relating to the development and implementation of their Joint Natural Disaster Protection Plan. |
View | 21-01013 | 01/04/2021 | Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2021. |
View | 21-01012 | 01/04/2021 | Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2021. |
View | 21-01011 | 01/04/2021 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021. |
View | 21-01004 | 01/04/2021 | Annual Reports for calendar year 2020 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987. |
View | 20-12027 | 12/23/2020 | Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2020. |
View | 20-12015 | 12/15/2020 | Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2020. |
View | 20-10032 | 10/29/2020 | Notice by Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Round Mountain Transformer Addition Project consisting of a 230/25 kV transformer and associated facilities to be located approximately 2 miles west of Round Mountain in Nye County, Nevada. |
View | 20-10028 | 10/28/2020 | Application of Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct the 230 kV Reid Gardner Substation to Tortoise Substation #2 Transmission Line Project consisting of a 2.7-mile 230 kV overhead transmission line and associated facilities to be located approximately 52 miles northeast of Las Vegas in Clark County, Nevada. |
View | 20-07025 | 07/20/2020 | Notice by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Greenlink West Transmission Line Project consisting of the expansion of the Harry Allen switching station, expansion of the Northwest, Comstock Meadows, and Mira Loma substations, new Amargosa and Esmeralda collector substations, a new Fort Churchill substation, a new Fort Churchill-Northwest 525 kV transmission line, a new Harry Allen-Northwest 525 kV transmission line, a new Comstock Meadows-Fort Churchill 345 kV transmission line, a new Fort Churchill-Mira Loma 345/120 kV transmission line, and associated facilities to be located in Clark, Nye, Esmeralda, Mineral, Lyon, Storey and Washoe Counties, Nevada. |
View | 20-07024 | 07/20/2020 | Notice by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Greenlink North Transmission Line Project consisting of the expansion of the Robinson Summit substation, a new Lander substation, a new Fort Churchill-Robinson Summit 525 kV transmission line, and associated facilities to be located in White Pine, Eureka, Lander, Churchill, and Lyon Counties, Nevada. |
View | 20-07023 | 07/20/2020 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the fourth amendment to its 2018 Joint Integrated Resource Plan to update and modify the renewable portion of the Supply-Side Action Plan and the Transmission Action Plan. |
View | 20-05004 | 05/04/2020 | Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 629-E to establish Customer Price Stability Tariff Schedule No. CPST ("the Program") to assist certain qualifying customers during the COVID-19 pandemic and economic downturn, and to address certain customer requests for price stability and potential cost savings in meeting customer-specific business needs and sustainability objectives. |
View | 20-05003 | 05/04/2020 | Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 504 to establish Customer Price Stability Tariff Schedule No. CPST (the "Program") to assist certain qualifying customers during the COVID-19 pandemic and economic downturn, and to address certain customer requests for price stability and potential cost savings in meeting customer-specific business needs and sustainability objectives. |
View | 20-01011 | 01/02/2020 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021. |
View | 19-12017 | 12/19/2019 | Application of Nevada Power Company d/b/a NV Energy for approval of an Energy Supply Agreement with Lumen Group LLC. |
View | 19-10006 | 10/07/2019 | Application of Nevada Power Company d/b/a NV Energy for authority to establish debt issuance authorizations based on a debt ceiling of $3,200.0 million. |
View | 19-08001 | 08/01/2019 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021. |
View | 19-06039 | 06/24/2019 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the third amendment to its 2018 Joint Integrated Resource Plan to update and modify the renewable portion of the Supply-Side Action Plan and the Transmission Action Plan. |
View | 19-05032 | 05/23/2019 | Monthly reports by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy demonstrating the amount of total incentive funds expended and reserved for all programs funded under NRS 701B.005 pursuant to the Order issued in Docket No. 18-02002. |
View | 18-12019 | 12/27/2018 | Application of Las Vegas Resort Holdings, LLC d/b/a Sahara Las Vegas (formerly d/b/a SLS Las Vegas) to purchase energy, capacity, and/or ancillary services from a provider of new electric resources. |
View | 18-10034 | 10/31/2018 | Amended Application of MSG Las Vegas, LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources. |
View | 18-10030 | 10/29/2018 | Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Carpenter Canyon Substation, consisting of a 230 kV substation and associated facilities, to interconnect an existing 230 kV transmission line with the ARES Nevada LLC Regulation Energy Management project to be located east of Pahrump in Nye County, Nevada. |
View | 18-09015 | 09/25/2018 | Application of Georgia-Pacific Gypsum LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources. |
View | 17-12018 | 12/27/2017 | Notice by Hydrostor A-CAES USA Inc., under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an advanced compressed air energy storage facility to be located approximately 10 miles outside of Ely in White Pine County, Nevada. |
View | 17-07016 | 07/14/2017 | Notice by Southern California Public Power Authority, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Apex Transmission Line consisting of approximately 10 to 14 miles of 500 kV transmission line and associated facilities to be located in Clark County, Nevada. |
View | 16-09023 | 09/30/2016 | Application of Switch Ltd. to purchase energy, capacity, and/or ancillary services from a provider of new electric resources. |
View | 16-06017 | 06/14/2016 | Notice by TransCanyon, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct approximately 214 miles of 500 kV transmission line connecting the existing Thirty Mile/Robinson Summit and Mona/Clover substations and associated facilities, portions of which will be located in White Pine County, Nevada |
View | 14-09015 | 09/22/2014 | Petition of the Regulatory Operations Staff for an Order directing Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy to file requested information with the Commission regarding the advanced metering infrastructure. |
View | 09-11005 | 11/04/2009 | Application of TransWest Express LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the TransWest Express Transmission Project consisting of a 600 kV DC transmission line running from central Wyoming to southern Nevada and associated facilities. |