| Dkt No. | Date Filed | Description |
View | 23-03018 | 03/13/2023 | Notice by Opal Energy Storage LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Opal Energy Storage Transmission Project consisting of an approximately 0.5-mile 230 kV transmission line and associated facilities to connect the proposed Opal Energy Battery Storage System to the Crystal Substation to be located in Clark County, Nevada. |
View | 23-03017 | 03/13/2023 | Notice by Burro Canyon Energy Storage LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Burro Canyon Energy Storage Transmission Project consisting of an approximately 0.5-mile 230 kV transmission line and associated facilities to connect the proposed Burro Canyon Energy Battery Storage System to the Northwest Substation to be located in Clark County, Nevada. |
View | 23-03016 | 03/13/2023 | Notice by Twilight Energy Storage LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Twilight Energy Storage Transmission Project consisting of an approximately 0.5-mile 230 kV transmission line and associated facilities to connect the proposed Twilight Energy Battery Storage System to the Magnolia Substation to be located in Clark County, Nevada. |
View | 23-03006 | 03/01/2023 | Application of Sierra Pacific Power Company d/b/a NV Energy for approval of fuel and purchased power expenses, to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rate, reset the Base Energy Efficiency Program Rates, reset the Base Energy Efficiency Implementation Rates, reset the Energy Efficiency Program Amortization Rate, reset the Energy Efficiency Implementation Amortization Rate, and reset the Expanded Solar Program Costs Rate. |
View | 23-03005 | 03/01/2023 | Application of Nevada Power Company d/b/a NV Energy for approval of fuel and purchased power expenses, to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rate, reset the Base Energy Efficiency Program Rates, reset the Base Energy Efficiency Implementation Rates, reset the Energy Efficiency Program Amortization Rate, reset the Energy Efficiency Implementation Amortization Rate, reset the Expanded Solar Program Costs Rate, and refund the total amount of Base Energy Efficiency Implementation Rate revenue received in 2022, including carrying charges. |
View | 23-03004 | 03/01/2023 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the cost recovery of the regulatory assets relating to the development and implementation of their Joint Natural Disaster Protection Plan. |
View | 23-03003 | 03/01/2023 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their Joint Natural Disaster Protection Plan for the period 2024-2026. |
View | 23-02033 | 03/01/2023 | Report of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy on the progress of its Action Plan relative to its 2022-2041 Integrated Resource Plan. |
View | 23-02028 | 02/24/2023 | Filing by Sierra Pacific Power Company d/b/a NV Energy of annual report on the Economic Development Electric Rate Rider Program pursuant to NAC 704.8958. |
View | 23-02027 | 02/24/2023 | Filing by Nevada Power Company d/b/a NV Energy of annual report on the Economic Development Electric Rate Rider Program pursuant to NAC 704.8958. |
View | 23-02021 | 02/16/2023 | Matthew and Melody Chutter vs. Sierra Pacific Power Company d/b/a NV Energy. Complaint regarding northern Nevada outage claim denial. |
View | 23-02011 | 02/16/2023 | Application of Sierra Pacific Power Company d/b/a NV Energy, filed under Advice Letter No. 662-E, to revise Electric Tariff No. 1 to revise Large Customer Market Price Energy Schedule No. LCMPE to set forth when an Energy Supply Agreement must be filed with an Integrated Resource Plan ("IRP") or IRP amendment, a requirement for a true-up or adjustment, and a requirement for a short form statement O, pursuant to the Order issued in Docket No. 22-03025. |
View | 23-02010 | 02/16/2023 | Application of Nevada Power Company d/b/a NV Energy, filed under Advice Letter No. 535, to revise Tariff No. 1-B to revise Large Customer Market Price Energy Schedule No. LCMPE to set forth when an Energy Supply Agreement must be filed with an Integrated Resource Plan ("IRP") or IRP amendment, a requirement for a true-up or adjustment, and a requirement for a short form statement O, pursuant to the Order issued in Docket No. 22-03025. |
View | 23-01032 | 01/27/2023 | Notice by 331LB 8me LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Lava Butte Transmission Project consisting of an approximately 6.6-mile 500 kV transmission line and associated facilities to connect the proposed Lava Butte Battery Storage System to the Harry Allen Substation to be located in Clark County, Nevada. |
View | 23-01029 | 01/24/2023 | Notice by 341NW 8me LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Ladera Transmission Project consisting of an approximately 6.6-mile 230 kV transmission line and associated facilities to connect the proposed Ladera Battery Storage System to the Northwest Substation to be located in Clark County, Nevada. |
View | 23-01028 | 01/24/2023 | Notice by Estuary Development Partners LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Crystal Energy Storage Center Project consisting of an approximately 1.5-mile 500 kV generation-tie line to connect an on-site substation to the existing Crystal Substation, an up to 4,800 MWh battery energy storage system, and associated facilities to be located in Clark County, Nevada. |
View | 23-01027 | 01/23/2023 | Amended Application of Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Silverhawk Capacity Project consisting of two natural gas combustion turbines, a natural gas pipeline, underground and above-ground water pipelines, and associated facilities to be located adjacent to the Silverhawk Generating Station in Clark County, Nevada. |
View | 23-01024 | 01/13/2023 | Notice by Great Basin Transmission, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Robinson Summit Interconnection Project consisting of an approximately 1.3-mile 500 kV interconnection line and associated facilities to connect the existing Robinson Summit Substation to a 500 kV transmission line to be located in White Pine County, Nevada. |
View | 23-01017 | 01/03/2023 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its current Strategic Operating Plans pursuant to the Order issued in Docket No. 22-06014. |
View | 23-01015 | 01/03/2023 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its quarterly data metrics for its Economic Recovery Transportation Electrification Plan pursuant to the Order issued in Docket No. 21-09004. |
View | 23-01013 | 01/03/2023 | Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2023. |
View | 23-01012 | 01/03/2023 | Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2023. |
View | 23-01011 | 01/03/2023 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021. |
View | 23-01009 | 01/03/2023 | Reports from electric and gas utilities operating in Nevada of transactions and calculations affecting the deferred energy accounts pursuant to NAC 704.195 for calendar year 2023. |
View | 23-01004 | 01/03/2023 | Annual Reports for calendar year 2022 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987. |
View | 22-11032 | 11/30/2022 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the fourth amendment to its 2021 Joint Integrated Resource Plan. |
View | 22-11016 | 11/15/2022 | Arah Muaba Bey vs. Nevada Power Company d/b/a NV Energy. Complaint regarding consumer disputing that he is considered a customer of the utility as defined in NAC 704.303 and should not be subject to the utility’s tariffs. |
View | 22-10013 | 10/20/2022 | Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Pahrump to Innovation Transmission Line Upgrade Project consisting of the upgrade of approximately 34 miles of existing 230 kV transmission line, the upgrade or expansion of the Pahrump and Innovation substations, and associated facilities to be located in Nye County, Nevada. |
View | 22-09006 | 09/01/2022 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the third amendment to its 2021 Joint Integrated Resource Plan. |
View | 22-08031 | 08/31/2022 | Second Report of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy on the progress of its Natural Disaster Protection Plan for the Action Plan Period 2021-2023. |
View | 22-08004 | 08/05/2022 | Petition of Southern Nevada Home Builders Association, Inc. for a Declaratory Order or, in the alternative, a Petition for an Investigation and Rulemaking, finding that townhomes should be classified as single-family dwellings for purposes of Nevada Power Company d/b/a NV Energy's and Sierra Pacific Power d/b/a NV Energy’s (together "NV Energy") Rule 9 Line Extension Allowances and that NV Energy should reimburse builders accordingly. |
View | 22-07020 | 07/29/2022 | Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Trout Canyon to Pahrump Transmission Line Upgrade Project consisting of the upgrade of approximately 14.1 miles of existing 230 kV transmission line, the upgrade or expansion of the Gamebird and Pahrump substations, and associated facilities to be located in Clark and Nye Counties, Nevada. |
View | 22-06042 | 06/29/2022 | Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Innovation to Northwest Upgrade Project consisting of an upgrade of approximately 43.2 miles of 230 kV transmission line extending from the Innovation Substation to the Desert View Substation and associated facilities to be located in Clark and Nye Counties, Nevada. |
View | 22-06015 | 06/06/2022 | Application of Sierra Pacific Power Company d/b/a NV Energy for approval of new and revised depreciation and amortization rates for its electric operations. |
View | 22-06014 | 06/06/2022 | Application of Sierra Pacific Power Company d/b/a NV Energy for authority to adjust its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto. |
View | 22-05020 | 05/20/2022 | Application of Switch Ltd., under the provisions of the Utility Environmental Protection Act, for a permit to construct a 230 kV switching station, two 230 kV substations, two 230 kV transmission lines, and associated facilities to be located in Clark County, Nevada. |
View | 22-03039 | 03/30/2022 | Application of Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Reid Gardner Battery Energy Storage System ("BESS") Project consisting of a 230 kV BESS substation, a 230 kV transmission line, interconnection facilities at the existing Reid Gardner Substation, and associated facilities to be located in Clark County, Nevada. |
View | 22-03028 | 03/28/2022 | Joint Application of Nevada Power Company d/b/a NV Energy ("NPC") and Sierra Pacific Power Company d/b/a NV Energy ("SPPC") for approval to merge into a single corporate entity, to transfer Certificates of Public Convenience and Necessity ("CPC") 685 Sub 20, 688, and 688 Sub 6 from SPPC to NPC, and to consolidate generation assets. |
View | 22-03025 | 03/18/2022 | Investigation and Rulemaking to consider adopting regulations for determining whether an energy supply agreement is in the public interest and/or to examine whether Nevada Power Company d/b/a NV Energy’s Scheduled No. LCMPE should be revised to promote consistency, predictability, and equity. |
View | 22-03024 | 03/18/2022 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the first amendment to its 2021 Joint Integrated Resource Plan. |
View | 22-03006 | 03/01/2022 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the cost recovery of the regulatory assets relating to the development and implementation of their Joint Natural Disaster Protection Plan. |
View | 22-01021 | 01/06/2022 | Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to upgrade approximately 59 miles of 230 kV transmission line extending from the Trout Canyon Substation to the Sloan Canyon Switchyard and associated facilities to be located in Clark County, Nevada. |
View | 22-01015 | 01/03/2022 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its quarterly data metrics for its Economic Recovery Transportation Electrification Plan pursuant to the Order issued in Docket No. 21-09004. |
View | 22-01013 | 01/03/2022 | Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2022. |
View | 22-01012 | 01/03/2022 | Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2022. |
View | 22-01011 | 01/03/2022 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021. |
View | 22-01009 | 01/03/2022 | Reports from electric and gas utilities operating in Nevada of transactions and calculations affecting the deferred energy accounts pursuant to NAC 704.195 for calendar year 2022. |
View | 22-01004 | 01/03/2022 | Annual Reports for calendar year 2021 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987. |
View | 21-12002 | 12/02/2021 | Rick Ernst vs. Nevada Power Company d/b/a NV Energy. Complaint requesting reimbursement for unnecessary costs as a result of the cancelation of Project ID #3007402532 (Temporary Disconnect/Reconnect). |
View | 21-10027 | 10/28/2021 | Application of Sierra Pacific Power Company d/b/a NV Energy for authority to establish capital issuance authorizations based on a debt ceiling of $1,900.0 million, a common stock ceiling of $2,200.0 million, and a preferred stock ceiling of $500.0 million, and enter into anticipatory financial hedging transactions. |
View | 21-10026 | 10/28/2021 | Application of Nevada Power Company d/b/a NV Energy for authority to establish capital issuance authorizations based on a debt ceiling of $3,800.0 million, a common stock ceiling of $4,100.0 million, and a preferred stock ceiling of $800.0 million, and enter into anticipatory financial hedging transactions. |
View | 21-10012 | 10/14/2021 | Application of Sierra Pacific Power Company d/b/a NV Energy to revise Electric Tariff No. 1 to establish ON Line Temporary Rider Schedule No. ONTR and for authorization to commence rate recovery of the One Nevada Transmission Line reallocated revenue requirement. |
View | 21-09032 | 09/23/2021 | Application of Sierra Pacific Power Company d/b/a NV Energy, filed under Advice Letter No. 642-E, to revise Incremental Price Tariff Schedule No. IP to provide a path for NRS Chapter 704B customers to return to bundled utility service and identify rates and conditions applicable to such customers. |
View | 21-09031 | 09/23/2021 | Application of Nevada Power Company d/b/a NV Energy, filed under Advice Letter No. 516, to revise Incremental Price Tariff Schedule No. IP to provide a path for NRS Chapter 704B customers to return to bundled utility service and identify rates and conditions applicable to such customers. |
View | 21-09004 | 09/01/2021 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their Economic Recovery Transportation Electrification Plan for the period 2022-2024. |
View | 21-06011 | 06/07/2021 | Application of Nevada Power Company d/b/a NV Energy for approval of an Energy Supply Agreement with Resorts World Las Vegas LLC. |
View | 21-06001 | 06/01/2021 | Amended Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2022-2041 Triennial Integrated Resource Plan, including the Transmission Infrastructure for a Clean Energy Economy Plan, and 2022-2024 Energy Supply Plan. |
View | 21-03006 | 03/01/2021 | Application of Sierra Pacific Power Company d/b/a NV Energy for approval of fuel and purchased power expenses, to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rate, reset the Base Energy Efficiency Program Rates, reset the Base Energy Efficiency Implementation Rates, reset the Energy Efficiency Program Amortization Rate, and reset the Energy Efficiency Implementation Amortization Rate. |
View | 21-03005 | 03/01/2021 | Application of Nevada Power Company d/b/a NV Energy for approval of fuel and purchased power expenses, to reset the Temporary Renewable Energy Development charge, reset all components of the Renewable Energy Program Rate, reset the Base Energy Efficiency Program Rates, reset the Base Energy Efficiency Implementation Rates, reset the Energy Efficiency Program Amortization Rate, reset the Energy Efficiency Implementation Amortization Rate, and refund the total amount of Base Energy Efficiency Implementation Rate revenue received in 2020, including carrying charges. |
View | 21-03004 | 03/10/2021 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of a regulatory asset account to recover costs relating to the development and implementation of their Joint Natural Disaster Protection Plan. |
View | 21-01013 | 01/04/2021 | Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2021. |
View | 21-01012 | 01/04/2021 | Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2021. |
View | 21-01011 | 01/04/2021 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021. |
View | 21-01004 | 01/04/2021 | Annual Reports for calendar year 2020 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987. |
View | 20-12027 | 12/23/2020 | Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2020. |
View | 20-12015 | 12/15/2020 | Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2020. |
View | 20-10032 | 10/29/2020 | Notice by Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Round Mountain Transformer Addition Project consisting of a 230/25 kV transformer and associated facilities to be located approximately 2 miles west of Round Mountain in Nye County, Nevada. |
View | 20-10028 | 10/28/2020 | Application of Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct the 230 kV Reid Gardner Substation to Tortoise Substation #2 Transmission Line Project consisting of a 2.7-mile 230 kV overhead transmission line and associated facilities to be located approximately 52 miles northeast of Las Vegas in Clark County, Nevada. |
View | 20-07025 | 07/20/2020 | Notice by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Greenlink West Transmission Line Project consisting of the expansion of the Harry Allen switching station, expansion of the Northwest, Comstock Meadows, and Mira Loma substations, new Amargosa and Esmeralda collector substations, a new Fort Churchill substation, a new Fort Churchill-Northwest 525 kV transmission line, a new Harry Allen-Northwest 525 kV transmission line, a new Comstock Meadows-Fort Churchill 345 kV transmission line, a new Fort Churchill-Mira Loma 345/120 kV transmission line, and associated facilities to be located in Clark, Nye, Esmeralda, Mineral, Lyon, Storey and Washoe Counties, Nevada. |
View | 20-07024 | 07/20/2020 | Notice by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Greenlink North Transmission Line Project consisting of the expansion of the Robinson Summit substation, a new Lander substation, a new Fort Churchill-Robinson Summit 525 kV transmission line, and associated facilities to be located in White Pine, Eureka, Lander, Churchill, and Lyon Counties, Nevada. |
View | 20-07023 | 07/20/2020 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the fourth amendment to its 2018 Joint Integrated Resource Plan to update and modify the renewable portion of the Supply-Side Action Plan and the Transmission Action Plan. |
View | 20-05004 | 05/04/2020 | Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 629-E to establish Customer Price Stability Tariff Schedule No. CPST ("the Program") to assist certain qualifying customers during the COVID-19 pandemic and economic downturn, and to address certain customer requests for price stability and potential cost savings in meeting customer-specific business needs and sustainability objectives. |
View | 20-05003 | 05/04/2020 | Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 504 to establish Customer Price Stability Tariff Schedule No. CPST (the "Program") to assist certain qualifying customers during the COVID-19 pandemic and economic downturn, and to address certain customer requests for price stability and potential cost savings in meeting customer-specific business needs and sustainability objectives. |
View | 20-01011 | 01/02/2020 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021. |
View | 20-01004 | 01/02/2020 | Annual Reports for calendar year 2019 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987. |
View | 19-12017 | 12/19/2019 | Application of Nevada Power Company d/b/a NV Energy for approval of an Energy Supply Agreement with Lumen Group LLC. |
View | 19-10006 | 10/07/2019 | Application of Nevada Power Company d/b/a NV Energy for authority to establish debt issuance authorizations based on a debt ceiling of $3,200.0 million. |
View | 19-08001 | 08/01/2019 | Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021. |
View | 19-06039 | 06/24/2019 | Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the third amendment to its 2018 Joint Integrated Resource Plan to update and modify the renewable portion of the Supply-Side Action Plan and the Transmission Action Plan. |
View | 19-05032 | 05/23/2019 | Monthly reports by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy demonstrating the amount of total incentive funds expended and reserved for all programs funded under NRS 701B.005 pursuant to the Order issued in Docket No. 18-02002. |
View | 19-02002 | 02/08/2019 | Application of Air Liquide Hydrogen Energy U.S. LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources. |
View | 18-12019 | 12/27/2018 | Application of Las Vegas Resort Holdings, LLC d/b/a Sahara Las Vegas (formerly d/b/a SLS Las Vegas) to purchase energy, capacity, and/or ancillary services from a provider of new electric resources. |
View | 18-10034 | 10/31/2018 | Amended Application of MSG Las Vegas, LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources. |
View | 18-10030 | 10/29/2018 | Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Carpenter Canyon Substation, consisting of a 230 kV substation and associated facilities, to interconnect an existing 230 kV transmission line with the ARES Nevada LLC Regulation Energy Management project to be located east of Pahrump in Nye County, Nevada. |
View | 18-10022 | 10/19/2018 | In re: to establish a working group contemplated by Section 15 of the regulations adopted in Docket No. 17-08021 (LCB File No. R022-18). |
View | 18-09016 | 09/26/2018 | Application of Sierra Pacific Power Company d/b/a NV Energy for authority to establish debt issuance authorizations based on a debt ceiling of $1,600.0 million. |
View | 18-09015 | 09/25/2018 | Application of Georgia-Pacific Gypsum LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources. |
View | 17-12018 | 12/27/2017 | Notice by Hydrostor A-CAES USA Inc., under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an advanced compressed air energy storage facility to be located approximately 10 miles outside of Ely in White Pine County, Nevada. |
View | 17-07016 | 07/14/2017 | Notice by Southern California Public Power Authority, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Apex Transmission Line consisting of approximately 10 to 14 miles of 500 kV transmission line and associated facilities to be located in Clark County, Nevada. |
View | 17-06004 | 06/05/2017 | Application of Nevada Power Company d/b/a NV Energy for approval of new and revised depreciation and amortization rates for its electric and common accounts. |
View | 17-06003 | 06/05/2017 | Application of Nevada Power Company d/b/a NV Energy for authority to adjust its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto. |
View | 16-09023 | 09/30/2016 | Application of Switch Ltd. to purchase energy, capacity, and/or ancillary services from a provider of new electric resources. |
View | 16-06017 | 06/14/2016 | Notice by TransCanyon, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct approximately 214 miles of 500 kV transmission line connecting the existing Thirty Mile/Robinson Summit and Mona/Clover substations and associated facilities, portions of which will be located in White Pine County, Nevada |
View | 14-09015 | 09/22/2014 | Petition of the Regulatory Operations Staff for an Order directing Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy to file requested information with the Commission regarding the advanced metering infrastructure. |
View | 09-11005 | 11/04/2009 | Application of TransWest Express LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the TransWest Express Transmission Project consisting of a 600 kV DC transmission line running from central Wyoming to southern Nevada and associated facilities. |