Return

Search by
Docket Number



Dockets By Company

All Dockets

Annual Reports

Electric Dockets

Gas Dockets

Incident Report Dockets

Investigations and Rulemakings

Mobile Home Parks

Rail Safety Dockets

Renewable Energy Dockets

Telecommunications Dockets

Water/Wastewater Dockets


Showing: Active Electric Dockets           Click to view: Completed Electric Dockets
 Dkt No.Date FiledDescription
View25-0102901/17/2025Regulatory Operations Staff vs. Candlewood Mobile Home Park. Complaints regarding tenant electricity billing.
View25-0102701/15/2025Notice by DesertLink, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Sloan Canyon 500 kV Loop Project consisting of an extension of the existing Harry Allen-Eldorado 500 kV transmission line and associated facilities to be located on private and federally-managed land in Clark County, Nevada.
View25-0102401/10/2025Lucy and Cristina Esteras vs. Nevada Power Company d/b/a NV Energy. Complaint regarding billing dispute.
View25-0102001/03/2025Notice by Invenergy Storage Development LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an approximately 0.4-mile 230 kV transmission line and associated facilities to connect the proposed Harry Allen Energy Storage Project to the electric transmission system at the Harry Allen Substation to be located on federally-managed land in Clark County, Nevada.
View25-0101901/02/2025Application of Sierra Pacific Power Company d/b/a NV Energy for authority to establish a Wildfire Self-Insurance Policy and cost recovery to fund the Wildfire Self-Insurance Policy.
View25-0101801/02/2025Application of Nevada Power Company d/b/a NV Energy for authority to establish a Wildfire Self-Insurance Policy and cost recovery to fund the Wildfire Self-Insurance Policy.
View25-0101601/02/2025Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its current Strategic Operating Plans pursuant to the Order issued in Docket No. 22-06014.
View25-0101401/02/2025Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its quarterly data metrics for its Economic Recovery Transportation Electrification Plan pursuant to the Order issued in Docket No. 21-09004.
View25-0101201/02/2025Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2025.
View25-0101101/02/2025Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2025.
View25-0101001/02/2025Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021.
View25-0100901/02/2025Reports from electric and gas utilities operating in Nevada of transactions and calculations affecting the deferred energy accounts pursuant to NAC 704.195 for calendar year 2025.
View25-0100401/02/2025Annual Reports for calendar year 2024 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987.
View24-1202512/24/2024David Harris vs. Nevada Power Company d/b/a NV Energy. Complaint regarding NV Energy’s financial practices and billing procedures.
View24-1201912/20/2024Application of Sierra Pacific Power Company d/b/a NV Energy, filed under Advice Letter No. 679-E, to revise Electric Line Extensions Rule No. 9 to adjust the Tax Gross-up Rate.
View24-1201812/20/2024Application of Nevada Power Company d/b/a NV Energy, filed under Advice Letter No. 552, to revise Electric Line Extensions Rule No. 9 to adjust the Tax Gross-up Rate.
View24-1201612/18/2024Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the first amendment to their 2024-2026 Joint Natural Disaster Protection Plan.
View24-1200712/09/2024Application of Sierra Pacific Power Company d/b/a NV Energy, filed under Advice Letter No. 678-E, to revise Electric Tariff No. 2 to submit short-term avoided cost rates for purchases from Qualifying Facilities pursuant to Schedule CSPP - Short-Term.
View24-1200612/09/2024Application of Nevada Power Company d/b/a NV Energy, filed under Advice Letter No. 551, to revise Electric Tariff No. 1-B to reflect the avoided short-term cost rates for purchases from Qualifying Facilities pursuant to Qualifying Facilities Schedule QF - Short Term.
View24-1101211/25/2024Application of Constellation Energy Generation, LLC for a license to operate as a provider of new electric resources.
View24-1100711/15/2024Sierra Pacific Power Company d/b/a NV Energy filed Notice No. 24-04(E) to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective January 1, 2025.
View24-1100611/18/2024Nevada Power Company d/b/a NV Energy filed Notice No. 24-04 to adjust the Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective January 1, 2025.
View24-1100411/15/2024Notice by Lincoln Battery Storage, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an approximately 5-mile 345 kV transmission line connecting the proposed Lincoln Battery Storage Project to the existing Robinson Summit Substation and associated facilities to be located on federally-managed land in White Pine County, Nevada.
View24-1001610/31/2024Application of Sierra Pacific Power Company d/b/a NV Energy, filed under Advice Letter No. 676-E, to revise Interruptible Irrigation Service Schedule No. IS-2 to decrease the IS-2 rate.
View24-1001510/31/2024Application of Nevada Power Company d/b/a NV Energy, filed under Advice Letter No. 549, to revise Interruptible Agricultural Irrigation Water Pumping Schedule No. IAIWP to decrease the IAIWP rate.
View24-1001310/28/2024Notice by Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the 230 kV Prospector - Garnet Valley Pump Station Transmission Line Project consisting of a 230 kV transmission line and associated facilities to connect the new Garnet Valley Pump Station to be located on federally-managed land in Clark County, Nevada.
View24-1000710/16/2024Application of Rough Hat Clark BESS LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Rough Hat Clark BESS Transmission Line Project consisting of a 230 kV transmission line and associated facilities to interconnect the proposed Rough Hat Clark Solar Battery Energy Storage System Project with the Trout Canyon Substation, to be located on federally-managed land in Clark County, Nevada.
View24-1000310/14/2024Application of Carefree Country Mobile Home Park to withdraw $161,430.87 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View24-0902509/24/2024Notice by Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Herb Goforth III to Prospector 230 kV Transmission Line Project consisting of an approximately 2-mile segment of a new 230 kV transmission line installed on new quad circuit 230/138 kV transmission structures, and associated facilities to be located on federally-managed land in Clark County, Nevada.
View24-0902309/24/2024Notice by Sawtooth DevCo, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an up to 500 kV generation-tie line associated with the proposed Bergen Battery Energy Storage System Project to be located on federally-managed land in Clark County, Nevada.
View24-0902209/24/2024Notice by Sawtooth DevCo, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an up to 230 kV generation-tie line associated with the proposed Reine Battery Energy Storage System Project to be located on federally-managed land in Clark County, Nevada.
View24-0901909/20/2024Notice by Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Nighthawk Substation and 345 kV Fold Project consisting of a new substation located on 14.7 acres of private land and a 345 kV high-voltage transmission line-fold to be located on 148 acres of private land and 158.5 acres of federally-managed land in Lyon County, Nevada.
View24-0901709/17/2024Application of Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Comstock Meadows to West Tracy 345 kV Transmission Line Project consisting of 345 kV terminal additions at the West Tracy and Comstock Meadows substations, two 345/120 kV transformers at the Comstock Meadows Substation, and a 10.14-mile 345 kV transmission line to be located on private land in Storey County, Nevada.
View24-0800708/06/2024Notice by Western Bounty, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct a portion of Segment 2 of the Western Bounty Transmission Line Project consisting of an approximately 67-mile 500 kV to 800 kV transmission line and associated facilities to be located on federally-managed land in Washoe County, Nevada.
View24-0800608/05/2024Notice by Cardinal Energy Storage, LLC, under the provisions of the Utility Environmental Protection Act of an application to a federal agency for approval to construct an approximately 1,100-foot 345-kV transmission line and associated facilities to connect the proposed Magpie battery energy storage facility to the electric grid via an expansion to the Gonder Substation to be located in White Pine County, Nevada.
View24-0800408/01/2024Application of Sierra Pacific Power Company d/b/a NV Energy for authority to establish capital issuance authorizations based on a debt ceiling of $4,000.0 million, a common stock ceiling of $5,100.0 million, a preferred stock ceiling of $500.0 million, and to enter into anticipatory financial hedging transactions.
View24-0800208/01/2024Application of Nevada Power Company d/b/a NV Energy for authority to establish capital issuance authorizations based on a debt ceiling of $5,500.0 million, a common stock ceiling of $6,500.0 million, a preferred stock ceiling of $800.0 million, and to enter into anticipatory financial hedging transactions.
View24-0701807/23/2024Notice by Cardinal Energy Storage, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an approximately 4,000-foot 500 kV transmission line and associated facilities to connect the proposed Roadrunner battery energy storage facility to the existing Crystal Substation to be located in Clark County, Nevada.
View24-0700607/09/2024Notice by Sterling BESS LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an approximately 1.3-mile 500 kV transmission line and associated facilities to connect the proposed Sterling BESS battery energy storage facility to the existing Southern California Edison Mohave Substation to be located on federally-managed land in Clark County, Nevada.
View24-0603606/27/2024Show Cause to determine why Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy should not be administratively fined pursuant to NRS 703.380 for violation of a Commission Order.
View24-0601406/10/2024Joint Application of Sierra Pacific Power Company d/b/a NV Energy and Callisto Enterprises LLC for approval of an Energy Supply Agreement.
View24-0601206/10/2024Application of Nevada Power Company d/b/a NV Energy for approval of an Energy Supply Agreement with Las Vegas Convention and Visitors Authority.
View24-0601106/10/2024Application of Sierra Pacific Power Company d/b/a NV Energy for approval of an Energy Supply Agreement with Coeur Rochester, Inc.
View24-0600906/05/2024Notice by Great Basin Transmission, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Burnt Springs Fixed Series Capacitor Project consisting of three 500 kV fixed series capacitors and associated facilities to be located on approximately 15 acres of federally-managed land in Lincoln County, Nevada.
View24-0504105/31/2024Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2025-2044 Triennial Integrated Resource Plan and 2025-2027 Energy Supply Plan.
View24-0400304/01/2024Filing by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of annual report on the quality of service metrics in compliance with the Order issued in Docket No. 15-06064.
View24-0302603/27/2024Chris Banda vs. Nevada Power Company d/b/a NV Energy ("Nevada Power"). Complaint regarding Temporary Disconnect/Reconnect and Permission to Turn On delays by Nevada Power.
View24-0300603/01/2024Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the cost recovery of the regulatory assets relating to the development and implementation of their Joint Natural Disaster Protection Plan.
View24-0202602/23/2024Application of Sierra Pacific Power Company d/b/a NV Energy for authority to adjust its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View24-0103401/29/2024Notice by Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to relocate approximately 1.9-miles of the Harry Allen to Reid Gardner #2 230 kV transmission line and associated facilities to separate two existing 230 kV transmission circuits to increase reliability of the electrical system located on federally-managed land in Clark County, Nevada.
View24-0102001/03/2024Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Greenlink West Transmission Project consisting of a 525/345/230/120 kV Walker River Substation and a 0.3-mile 525 kV generation-tie line to be located on private land in Lyon County, Nevada.
View24-0101901/04/2024Notice by KCE NV 1, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an approximately 0.20-mile 230 kV transmission line, a minor substation/switchgear, and associated facilities to interconnect the Silvercoin Battery Energy Storage Project with the existing regional transmission system via the SCE Primm Substation to be located on approximately 25 acres of federally-managed land in Clark County, Nevada.
View24-0101801/04/2024Notice by KCE NV 2, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct a 230 kV transmission line, a minor substation/switchgear, and associated facilities to interconnect the Skydive Battery Energy Storage Project with the existing regional transmission system via the GridLiance West Trout Canyon-Sloan Canyon Transmission Line to be located on approximately 25 acres of federally-managed land in Clark County, Nevada.
View24-0101701/02/2024Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its current Strategic Operating Plans pursuant to the Order issued in Docket No. 22-06014.
View24-0101501/02/2024Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its quarterly data metrics for its Economic Recovery Transportation Electrification Plan pursuant to the Order issued in Docket No. 21-09004.
View24-0101301/02/2024Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2024.
View24-0101201/02/2024Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2024.
View24-0101101/02/2024Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021.
View24-0100901/02/2024Reports from electric and gas utilities operating in Nevada of transactions and calculations affecting the deferred energy accounts pursuant to NAC 704.195 for calendar year 2024.
View24-0100401/02/2024Annual Reports for calendar year 2023 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987.
View23-1102611/28/2023Notice by Nevada Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Harry Allen to Reid Gardner 230 kV #3 Transmission Line consisting of an approximately 22.5 mile 230 kV transmission line and associated facilities to be located on private land and federally-managed land in Clark County, Nevada.
View23-1102511/22/2023Application of King's Row Trailer Park to withdraw $74,415.17 from the tenant service charge account for reimbursement of expenses incurred to repair and maintain the electrical system.
View23-1000410/05/2023Show Cause Proceeding to determine why Nevada Power Company d/b/a NV Energy should not be administratively fined pursuant to NRS 703.380 for violation of a Commission Order.
View23-0902009/22/2023Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Johnnie Corner to Beatty Transmission Line Upgrade Project consisting of approximately 57.7 miles of up to 500 kV transmission line, five new switchyards, and associated facilities to be located on private land and approximately 1,827 acres of federally-managed land in Nye County, Nevada.
View23-0801908/22/2023Application of Nevada Power Company d/b/a NV Energy for approval of an Energy Supply Agreement with MSG Las Vegas, LLC.
View23-0801508/22/2023Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the fifth amendment to its 2021 Joint Integrated Resource Plan.
View23-0801208/16/2023Notice by Invenergy Storage Development LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct a 230 kV transmission line to interconnect the proposed Sandlot Energy Storage Project with the Arden Substation to be located on federally-managed land in Clark County, Nevada.
View23-0702207/25/2023Notice by Solidus Resources, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to realign and construct portions of two 345 kV transmission lines to be located on private and federally-managed land in Pershing County, Nevada.
View23-0604606/30/2023Application of TransWest Express LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the TransWest-DesertLink Interconnection Project consisting of an approximately 1.55-mile 500 kV transmission line and associated facilities to interconnect the TransWest Express Transmission Project with the existing DesertLink, Harry Allen to Eldorado transmission line to be located on approximately 73 acres of federally-managed land in Clark County, Nevada.
View23-0600806/05/2023Application of Nevada Power Company d/b/a NV Energy for approval of new and revised depreciation and amortization rates for its electric and common accounts.
View23-0600706/05/2023Application of Nevada Power Company d/b/a NV Energy for authority to adjust its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View23-0504405/31/2023Notice by Great Basin Transmission South, LLC, on behalf of the ON Line owners, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Robinson Summit Substation Expansion Project consisting of a 500 kV and a 345 kV switchyard and associated facilities to be located at the existing Robinson Summit Substation on approximately 55 acres of federally-managed land in White Pine County, Nevada.
View23-0502005/16/2023Amended Notice by Western Bounty, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct Segment 3 of the Western Bounty Transmission Line Project consisting of an up to 350-mile 500kV to 800 kV single-circuit transmission line, a converter and substation, an up to 0.34 mile double-circuit 525 kV alternating current overhead transmission line connecting to the proposed Esmeralda Substation in Esmeralda County, Nevada, and associated facilities extending from the proposed Auriga Converter and Substation to either the Nevada-Idaho border through Esmeralda, Nye, Lander, Eureka, and Elko Counties, Nevada, or the Nevada-Oregon border through Esmeralda, Mineral, Lyon, Churchill, Washoe, Pershing, and Humboldt Counties, Nevada, to be located on private and federally-managed land.
View23-0500505/05/2023Notice by Nettleaf Solar LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an approximately 15-mile 525 kV generation-tie line to interconnect the Nettleleaf Storage Project with the proposed Walker River Substation to be located on federally-managed land in Lyon County, Nevada.
View23-0500405/09/2023Notice by Honey Mesquite Solar LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an approximately 10-mile 525 kV generation-tie line to interconnect the Honey Mesquite Storage Project with the proposed Walker River Substation to be located on federally-managed land in Lyon County, Nevada.
View23-0401604/18/2023Investigation regarding Sierra Pacific Power Company d/b/a NV Energy’s progress of developing a clean transition tariff and its appropriateness for development as a new tariff offering pursuant to the Modified Final Order issued in Docket Nos. 22-06014, 22-06015, and 22-06016.
View23-0301803/13/2023Notice by Opal Energy Storage LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Opal Energy Storage Transmission Project consisting of an approximately 0.5-mile 230 kV transmission line and associated facilities to connect the proposed Opal Energy Battery Storage System to the Crystal Substation to be located in Clark County, Nevada.
View23-0301703/13/2023Notice by Burro Canyon Energy Storage LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Burro Canyon Energy Storage Transmission Project consisting of an approximately 0.5-mile 230 kV transmission line and associated facilities to connect the proposed Burro Canyon Energy Battery Storage System to the Northwest Substation to be located in Clark County, Nevada.
View23-0301603/13/2023Notice by Twilight Energy Storage LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Twilight Energy Storage Transmission Project consisting of an approximately 0.5-mile 230 kV transmission line and associated facilities to connect the proposed Twilight Energy Battery Storage System to the Magnolia Substation to be located in Clark County, Nevada.
View23-0300403/01/2023Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the cost recovery of the regulatory assets relating to the development and implementation of their Joint Natural Disaster Protection Plan.
View23-0300303/01/2023Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their Joint Natural Disaster Protection Plan for the period 2024-2026.
View23-0201102/16/2023Application of Sierra Pacific Power Company d/b/a NV Energy, filed under Advice Letter No. 662-E, to revise Electric Tariff No. 1 to revise Large Customer Market Price Energy Schedule No. LCMPE to set forth when an Energy Supply Agreement must be filed with an Integrated Resource Plan ("IRP") or IRP amendment, a requirement for a true-up or adjustment, and a requirement for a short form statement O, pursuant to the Order issued in Docket No. 22-03025.
View23-0201002/16/2023Application of Nevada Power Company d/b/a NV Energy, filed under Advice Letter No. 535, to revise Tariff No. 1-B to revise Large Customer Market Price Energy Schedule No. LCMPE to set forth when an Energy Supply Agreement must be filed with an Integrated Resource Plan ("IRP") or IRP amendment, a requirement for a true-up or adjustment, and a requirement for a short form statement O, pursuant to the Order issued in Docket No. 22-03025.
View23-0103201/27/2023Amended Notice by 332RR 8me LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Red Rock Transmission Project consisting of an approximately 6.6-mile 500 kV transmission line and associated facilities to connect the proposed Red Rock Battery Storage System to the Harry Allen Substation to be located on federally-managed land in Clark County, Nevada.
View23-0102901/24/2023Notice by 341NW 8me LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Ladera Transmission Project consisting of an approximately 6.6-mile 230 kV transmission line and associated facilities to connect the proposed Ladera Battery Storage System to the Northwest Substation to be located in Clark County, Nevada.
View23-0102801/24/2023Notice by Estuary Development Partners LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Crystal Energy Storage Center Project consisting of an approximately 1.5-mile 500 kV generation-tie line to connect an on-site substation to the existing Crystal Substation, an up to 4,800 MWh battery energy storage system, and associated facilities to be located in Clark County, Nevada.
View23-0102401/13/2023Notice by Great Basin Transmission, LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Robinson Summit Interconnection Project consisting of an approximately 1.3-mile 500 kV interconnection line and associated facilities to connect the existing Robinson Summit Substation to a 500 kV transmission line to be located in White Pine County, Nevada.
View23-0101701/03/2023Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its current Strategic Operating Plans pursuant to the Order issued in Docket No. 22-06014.
View23-0101501/03/2023Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its quarterly data metrics for its Economic Recovery Transportation Electrification Plan pursuant to the Order issued in Docket No. 21-09004.
View23-0101301/03/2023Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2023.
View23-0101201/03/2023Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2023.
View23-0101101/03/2023Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021.
View23-0100401/03/2023Annual Reports for calendar year 2022 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987.
View22-1001310/20/2022Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Pahrump to Innovation Transmission Line Upgrade Project consisting of the upgrade of approximately 34 miles of existing 230 kV transmission line, the upgrade or expansion of the Pahrump and Innovation substations, and associated facilities to be located in Nye County, Nevada.
View22-0900609/01/2022Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the third amendment to its 2021 Joint Integrated Resource Plan.
View22-0803108/31/2022Second Report of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy on the progress of its Natural Disaster Protection Plan for the Action Plan Period 2021-2023.
View22-0702007/29/2022Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Trout Canyon to Pahrump Transmission Line Upgrade Project consisting of the upgrade of approximately 14.1 miles of existing 230 kV transmission line, the upgrade or expansion of the Gamebird and Pahrump substations, and associated facilities to be located in Clark and Nye Counties, Nevada.
View22-0604206/29/2022Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Innovation to Northwest Upgrade Project consisting of an upgrade of approximately 43.2 miles of 230 kV transmission line extending from the Innovation Substation to the Desert View Substation and associated facilities to be located in Clark and Nye Counties, Nevada.
View22-0601506/06/2022Application of Sierra Pacific Power Company d/b/a NV Energy for approval of new and revised depreciation and amortization rates for its electric operations.
View22-0601406/06/2022Application of Sierra Pacific Power Company d/b/a NV Energy for authority to adjust its annual revenue requirement for general rates charged to all classes of electric customers and for relief properly related thereto.
View22-0302503/18/2022Investigation and Rulemaking to consider adopting regulations for determining whether an energy supply agreement is in the public interest and/or to examine whether Nevada Power Company d/b/a NV Energy’s Scheduled No. LCMPE should be revised to promote consistency, predictability, and equity.
View22-0302403/18/2022Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the first amendment to its 2021 Joint Integrated Resource Plan.
View22-0102101/06/2022Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to upgrade approximately 59 miles of 230 kV transmission line extending from the Trout Canyon Substation to the Sloan Canyon Switchyard and associated facilities to be located in Clark County, Nevada.
View22-0101501/03/2022Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its quarterly data metrics for its Economic Recovery Transportation Electrification Plan pursuant to the Order issued in Docket No. 21-09004.
View22-0101301/03/2022Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2022.
View22-0101201/03/2022Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2022.
View22-0101101/03/2022Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021.
View22-0100401/03/2022Annual Reports for calendar year 2021 submitted by Mobile Home Parks operating in Nevada pursuant to NRS 704.960 and NAC 704.987.
View21-1002710/28/2021Application of Sierra Pacific Power Company d/b/a NV Energy for authority to establish capital issuance authorizations based on a debt ceiling of $1,900.0 million, a common stock ceiling of $2,200.0 million, and a preferred stock ceiling of $500.0 million, and enter into anticipatory financial hedging transactions.
View21-1002610/28/2021Application of Nevada Power Company d/b/a NV Energy for authority to establish capital issuance authorizations based on a debt ceiling of $3,800.0 million, a common stock ceiling of $4,100.0 million, and a preferred stock ceiling of $800.0 million, and enter into anticipatory financial hedging transactions.
View21-0900409/01/2021Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their Economic Recovery Transportation Electrification Plan for the period 2022-2024.
View21-0601106/07/2021Application of Nevada Power Company d/b/a NV Energy for approval of an Energy Supply Agreement with Resorts World Las Vegas LLC.
View21-0600106/01/2021Amended Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2022-2041 Triennial Integrated Resource Plan, including the Transmission Infrastructure for a Clean Energy Economy Plan, and 2022-2024 Energy Supply Plan.
View21-0101301/04/2021Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2021.
View21-0101201/04/2021Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2021.
View21-0101101/04/2021Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021.
View20-1202712/23/2020Notifications and Reports from electric utilities operating in Nevada regarding certain ignition events and wildfires occurring in the vicinity of the infrastructure of an electric utility for calendar year 2020.
View20-1201512/15/2020Notifications and Reports from electric utilities operating in Nevada regarding power outages initiated to preserve public safety or proactive de-energization events for calendar year 2020.
View20-1003210/29/2020Notice by Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Round Mountain Transformer Addition Project consisting of a 230/25 kV transformer and associated facilities to be located approximately 2 miles west of Round Mountain in Nye County, Nevada.
View20-0702507/20/2020Application by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, for a permit to construct the Greenlink West Transmission Line Project consisting of the expansion of the Harry Allen switching station and Northwest substation, new Amargosa and Esmeralda collector substations, a new Fort Churchill-Northwest 525 kV transmission line, a new Harry Allen-Northwest 525 kV transmission line, and associated facilities to be located in Clark, Nye, Esmeralda, Mineral, and Lyon counties, Nevada.
View20-0702407/20/2020Notice by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Greenlink North Transmission Line Project consisting of the expansion of the Robinson Summit substation, a new Lander substation, a new Fort Churchill-Robinson Summit 525 kV transmission line, and associated facilities to be located in White Pine, Eureka, Lander, Churchill, and Lyon Counties, Nevada.
View20-0702307/20/2020Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the fourth amendment to its 2018 Joint Integrated Resource Plan to update and modify the renewable portion of the Supply-Side Action Plan and the Transmission Action Plan.
View20-0500405/04/2020Application of Sierra Pacific Power Company d/b/a NV Energy filed under Advice Letter No. 629-E to establish Customer Price Stability Tariff Schedule No. CPST ("the Program") to assist certain qualifying customers during the COVID-19 pandemic and economic downturn, and to address certain customer requests for price stability and potential cost savings in meeting customer-specific business needs and sustainability objectives.
View20-0500305/04/2020Application of Nevada Power Company d/b/a NV Energy filed under Advice Letter No. 504 to establish Customer Price Stability Tariff Schedule No. CPST (the "Program") to assist certain qualifying customers during the COVID-19 pandemic and economic downturn, and to address certain customer requests for price stability and potential cost savings in meeting customer-specific business needs and sustainability objectives.
View20-0101101/02/2020Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021.
View19-1201712/19/2019Application of Nevada Power Company d/b/a NV Energy for approval of an Energy Supply Agreement with Lumen Group LLC.
View19-1000610/07/2019Application of Nevada Power Company d/b/a NV Energy for authority to establish debt issuance authorizations based on a debt ceiling of $3,200.0 million.
View19-0800108/01/2019Filings by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy of its monthly financial statements and quarterly calculations of its earned rate(s) of return and returns on equity for the Nevada jurisdiction pursuant to the Order issued in Docket No. 13-07021.
View19-0603906/24/2019Joint Application of Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy for approval of the third amendment to its 2018 Joint Integrated Resource Plan to update and modify the renewable portion of the Supply-Side Action Plan and the Transmission Action Plan.
View19-0503205/23/2019Monthly reports by Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy demonstrating the amount of total incentive funds expended and reserved for all programs funded under NRS 701B.005 pursuant to the Order issued in Docket No. 18-02002.
View18-1201912/27/2018Application of Las Vegas Resort Holdings, LLC d/b/a Sahara Las Vegas (formerly d/b/a SLS Las Vegas) to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-1003410/31/2018Amended Application of MSG Las Vegas, LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View18-1003010/29/2018Notice by GridLiance West LLC, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Carpenter Canyon Substation, consisting of a 230 kV substation and associated facilities, to interconnect an existing 230 kV transmission line with the ARES Nevada LLC Regulation Energy Management project to be located east of Pahrump in Nye County, Nevada.
View18-0901509/25/2018Application of Georgia-Pacific Gypsum LLC to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View17-1201812/27/2017Notice by Hydrostor A-CAES USA Inc., under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct an advanced compressed air energy storage facility to be located approximately 10 miles outside of Ely in White Pine County, Nevada.
View17-0701607/14/2017Notice by Southern California Public Power Authority, under the provisions of the Utility Environmental Protection Act, of an application to a federal agency for approval to construct the Apex Transmission Line consisting of approximately 10 to 14 miles of 500 kV transmission line and associated facilities to be located in Clark County, Nevada.
View16-0902309/30/2016Application of Switch Ltd. to purchase energy, capacity, and/or ancillary services from a provider of new electric resources.
View16-0601706/14/2016Application of TransCanyon Western Development LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct approximately 218 miles of 500 kV transmission line connecting the existing Thirty Mile/Robinson Summit and Mona/Clover substations and associated facilities, portions of which will be located on private land and federally-managed land in White Pine County, Nevada.
View14-0901509/22/2014Petition of the Regulatory Operations Staff for an Order directing Nevada Power Company d/b/a NV Energy and Sierra Pacific Power Company d/b/a NV Energy to file requested information with the Commission regarding the advanced metering infrastructure.
View09-1100511/04/2009Amended Application of TransWest Express LLC for authority under the provisions of the Utility Environmental Protection Act for a permit to construct the TransWest Express Transmission Project consisting of a 500 kV AC transmission line running from western Utah to southern Nevada and associated facilities.